AIR FORCE MIL-STD-1546B-1992 PARTS MATERIALS AND PROCESSES CONTROL PROGRAM FOR SPACE AND LAUNCH VEHICLES《航天和运载火箭用部件、物资和程序控制计划》.pdf
《AIR FORCE MIL-STD-1546B-1992 PARTS MATERIALS AND PROCESSES CONTROL PROGRAM FOR SPACE AND LAUNCH VEHICLES《航天和运载火箭用部件、物资和程序控制计划》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-STD-1546B-1992 PARTS MATERIALS AND PROCESSES CONTROL PROGRAM FOR SPACE AND LAUNCH VEHICLES《航天和运载火箭用部件、物资和程序控制计划》.pdf(55页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-STD-154bB L8 m 9999911 0306286 5bL m NOT MEASUREMENT SENSITIVE MIL-STD-1546B (USAF) 27 JUL 1992 SUPERSEDING DATED O1 MAR 1988 MIL-STD-1546A (USAF) MILITARY STANDARD PARTS, MATERIALS, AND PROCESSES CONTROL PROGRAM FOR SPACE AND LAUNCH VEHICLES AMSC F6764 FSC 1820 DISTRIBUTION STATEMENT 4; Approve
2、d for public release; distribution unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-1546B FOREWORD MIL-STD-1546B (USAF) Parts, Materials, and Processes Control Program for Space and Launch Vehicles l. This Military Standard is appro
3、ved for use by the Department of the Air Force, and is available for use by all Departments and Agencies of the Department of Defense. 2. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: USAF Spa
4、ce and Missile Systems Center, SMC/SDFC P.O. Box 92960 Worldway Postal Center Los Angeles, CA. 90009-2960 by using the self-addressed Standardization Document Improvement Proposal (DD form 1426) appearing at the end of this document or by letter. 3. The requirements of this standard were developed f
5、or long life and/or high reliability space and launch vehicles and equipment. To ensure successful operation of space equipment, attention to every detail is required at every level of assembly throughout development, manufacture, qualification, and testing, starting with the parts, materials, and p
6、rocesses used. For space and launch vehicles, if parts, materials, and processes have defects or lack the required reliability, success may never be achieved. 4. Analysis of space mission failures and on orbit anomalies by USAF Space and Missile Systems Center revealed that the non-availability of r
7、eliable space quality electronic piece parts was a serious deterrent to achieving space mission success. In responding to this problem, the USAF Space and Missile Systems Center initiated a program with the objective of establishing a “space quality baseline“ of parts, materials, and processes that
8、have a proven track record of high reliability. In addition, this standard was developed to document the management requirements for parts, materials, and processes for space and launch vehicles. 5. The objective of this parts, materials, and processes control program standard is to ensure integrate
9、d and coordinated management of the selection, application, procurement, control and standardization of parts (electrical and mechanical), materials, and processes for space and launch vehicles. The requirements presented herein should reduce program costs and should improve the reliability of space
10、 and launch vehicles. The requirements in this standard revise the Parts Control Program requirements stated in MIL-Sm-965 by expanding particular requirements to satisfy space and launch vehicle acquisitions and extend the requirements to apply to materials and processes. Provided by IHSNot for Res
11、aleNo reproduction or networking permitted without license from IHS-,-,-SECTION 1 1.1 1.2 1.3 SECTION 2 SECTION 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.1.13 3.1.14 3.1.15 3.1.16 3.1.17 3.1.18 3.1.18.1 3.1.18.2 3.1.18.3 3.1.19 3.1.20 3.1.21 3.1.22 3.1.23 3.1
12、.24 3.1.25 3.2 SECTION 4.0 4.1 SECTION 5.0 5.1 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 TABLE OF CONTENTS SCOPE Purpose Application Compliance with System Requirements. APPLICABLE DOCUMENTS DEFINITIONS AND ACRONYMS DEFINITIONS Acquisition Activity Categories of Contractor Commercial Off-The-Shelf (CO
13、TS) Item Contracting Officer Destructive Physical Analysis Electronic Parts Electrostatic Discharge (ESD) Expendable Launch Vehicle (ELV) Quality Baseline Long Lead PMP Manufacturing Baseline Material Material Lot Mechanical Parts Military Parts Control Advisory Group (MPCAG) Part Parts, Materials,
14、and Processes Control Board (PMPCB) Part/Material and Process Approval Request (PAWAR) Parts, Materials, and Processes Lists Parts, Materials, and Processes Selection List (PMPSL) As Designed Parts, Materials and Processes List (ADPMPL) As Built PMP List Process Production Lot Program Technical Requ
15、irements Prohibited PMP Redundant System / Circuit Registered PMP Space Quality PMP Baseline ACRONYMS GENERAL REQUIREMENTS Parts, Materials and Processes Control Program DETAILED REQUIREMENTS Parts, Materials the manufacturing processes; the manufacturing facilities, tooling, and test equipment; the
16、 in-process manufacturing controls; the operator training and certification; and the inspection and other quality assurance provisions imposed. Each document is identified by title, number, date of issue, applicable revision, and date of revision. 3.1.11 Material. Material is a metallic or nonmetall
17、ic element, alloy, mixture, or compound used in a manufacturing operation which becomes either a temporary or permanent portion of the manufactured item. 3.1.12 Material. A lot for material refers to material produced as a single batch or in a single continuous operation or production cycle and offe
18、red for acceptance at any one time. 3.1.13 Parts, The term mechanical parts (non-electrical parts) is used in a broad sense in this standard and includes such simple mechanical parts as nuts, bolts, washers, pins, and terminals, as well as more complex assemblies such as, clamps and glass-to-metal s
19、eals. Such mechanical parts have a single, nonelectrical function (other than elecmcal grounding), and contain one or more necessary material items. Formed, shaped or otherwise processed portions of packages used by electronic assemblies, such as substrates and lids, shall be considered as mechanica
20、l parts. 3.1.14 01 Advlsorv Group (MPCAG). The MPCAG is a Department of Defense organization which provides advice to the military departments and military contractors on the selection of parts in assigned commodity classes, and collects data on nonstandard parts for developing or updating military
21、specifications and standards. 3.1.15 m. A part is one piece, or two or more pieces joined together, which are not normally subjected to disassembly without destruction or impairment of its designed use. 3.1.16 ts. Matem. and Processes Cpntrol Board (PMPCB). The PMPCB is a formal contractor organizat
22、ion established by conqact to manage and control the selection, application, procurement, and documentation of parts, materials, and processes used in equipment, systems, or subsystems. 3.1.17 Part/- Procuproval Reaua A documented analysis/assessment which provides technical justification for adding
23、 parts (PAR), or materials and processes (MAR) to the PMPSL. 3.1.18 ts. M-d Processes Lists. 3.1.18.1 ts. -. and Prowes Sew list (PMPW . The PMPSL is a list of all parts, materials, and processes which are approved for design use in a specific contract. (See DI-MISC-81277) 3.1.18.2 As Desid wts. MW
24、and Prowes 1,- The ADPMPL shall consist of all the parts, materials and processes selected to be used in end-item hardware. It shall also include the expected quantity of parts and materials. (SeeDI-MISC-81276) 3.1.18.3 t PMP The as built PMP List shall identify all the PMP used in each deliverable
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILSTD1546B1992PARTSMATERIALSANDPROCESSESCONTROLPROGRAMFORSPACEANDLAUNCHVEHICLES 航天 运载火箭 部件 物资

链接地址:http://www.mydoc123.com/p-428488.html