1、 Reference number ISO/IEC/IEEE 16326:2009(E) ISO/IEC 2009 IEEE 2009INTERNATIONAL STANDARD ISO/IEC/ IEEE 16326 First edition 2009-12-15 Systems and software engineering Life cycle processes Project management Ingnierie du logiciel Processus de cycle de vie Gestion de projetISO/IEC/IEEE 16326:2009(E)
2、PDF disclaimer This PDF file may contain embedded typefaces. In accordance with Adobes licensing policy, this file may be printed or viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file,
3、parties accept therein the responsibility of not infringing Adobes licensing policy. Neither the ISO Central Secretariat nor IEEE accepts any liability in this area. Adobe is a trademark of Adobe Systems Incorporated. Details of the software products used to create this PDF file can be found in the
4、General Info relative to the file; the PDF-creation parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies and IEEE members. In the unlikely event that a problem relating to it is found, please inform the ISO Central Secreta
5、riat or IEEE at the address given below. COPYRIGHT PROTECTED DOCUMENT ISO/IEC 2009 IEEE 2009 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without
6、 permission in writing from either ISO or IEEE at the respective address below. ISO copyright office Institute of Electrical and Electronics Engineers, Inc. Case postale 56 CH-1211 Geneva 20 3 Park Avenue, New York NY 10016-5997, USA Tel. + 41 22 749 01 11 E-mail stds.iprieee.org Fax + 41 22 749 09
7、47 Web www.ieee.org E-mail copyrightiso.org Web www.iso.org Published in Switzerland ii ISO/IEC 2009 All rights reserved IEEE 2009 All rights reservedISO/IEC FDIS 16326:2009 (E) IEEE P16326/CD2 19 February 2009 ISO/IEC 2009 All rights reserved IEEE 2009 All rights reserved iiiContents Page Foreword
8、.v Introductionvi 1 Scope1 1.1 Purpose 1 1.2 Field of application1 1.3 Limitations .1 2 Conformance .2 2.1 Conformance to normative documentation content2 2.2 Conformance to processes 2 2.3 Full conformance.2 3 Symbols and abbreviations2 4 Application of this International Standard3 5 Elements of th
9、e project management plan.4 5.1 Project overview (Clause 1 of the PMP)5 5.1.1 Project summary (Subclause 1.1 of the PMP) 5 5.1.2 Evolution of the plan (Subclause 1.2 of the PMP)6 5.2 References (Clause 2 of the PMP) .6 5.3 Definitions (Clause 3 of the PMP) 6 5.4 Project context (Clause 4 of the PMP)
10、.6 5.4.1 Process model (Clause 4.1 of the PMP)6 5.4.2 Process improvement plan (Clause 4.2 of the PMP) .7 5.4.3 Infrastructure plan (Clause 4.3 of the PMP)7 5.4.4 Methods, tools and techniques (Clause 4.4 of the PMP).7 5.4.5 Product acceptance plan (Clause 4.5 of the PMP).7 5.4.6 Project organizatio
11、n (Clause 4.6 of the PMP).7 5.5 Project planning (Clause 5 of the PMP) 8 5.5.1 Project initiation (Subclause 5.1 of the PMP) .8 5.5.2 Project work plans (Subclause 5.2 of the PMP) .9 5.6 Project assessment and control (Clause 6 of the PMP)10 5.6.1 Requirements management plan (Subclause 6.1 of the P
12、MP)10 5.6.2 Scope change control plan (Subclause 6.2 of the PMP) .10 5.6.3 Schedule control plan (Subclause 6.3 of the PMP)10 5.6.4 Budget control plan (Subclause 6.4 of the PMP) .10 5.6.5 Quality assurance plan (Subclause 6.5 of the PMP)11 5.6.6 Subcontractor management plans (Subclause 6.6 of the
13、PMP).11 5.6.7 Project closeout plan (Subclause 6.7 of the PMP).11 5.7 Product delivery (Clause 7 of the PMP) 11 5.8 Supporting process plans (Clause 8 of the PMP) 11 5.8.1 Project supervision and work environment (Subclause 8.1 of the PMP) 11 5.8.2 Decision management (Subclause 8.2 of the PMP) .12
14、5.8.3 Risk management (Subclause 8.3 of the PMP) 12 5.8.4 Configuration management (Subclause 8.4 of the PMP) 12 5.8.5 Information management (Subclause 8.5 of the PMP) 12 5.8.6 Quality assurance (Subclause 8.6 of the PMP) 13 5.8.7 Measurement (Subclause 8.7 of the PMP) 13 5.8.8 Reviews and audits (
15、Subclause 8.8 of the PMP)13 5.8.9 Verification and validation (Subclause 8.9 of the PMP) 14 5.9 Additional plans (Clause 9 of the PMP).14 ISO/IEC/IEEE 16326:2009(E)ISO/IEC FDIS 16326:2009 (E) IEEE P16326/CD2 19 February 2009 iv ISO/IEC 2009 All rights reserved IEEE 2009 All rights reserved5.10 End m
16、atter 14 6 Project processes15 6.1 Project planning process16 6.2 Project assessment and control process .20 6.3 Decision management process23 6.4 Risk management process .25 6.5 Configuration management process .27 6.6 Information management process.29 6.7 Measurement process.31 Bibliography32 List
17、 of Figures Page Figure 1 Format of a project management plan .4 ISO/IEC/IEEE 16326:2009(E)ISO/IEC FDIS 16326:2009 (E) IEEE P16326/CD2 19 February 2009 ISO/IEC 2009 All rights reserved IEEE 2009 All rights reserved vISO/IEC/IEEE 16326:2009(E) Foreword ISO (the International Organization for Standard
18、ization) and IEC (the International Electrotechnical Commission) form the specialized system for worldwide standardization. National bodies that are members of ISO or IEC participate in the development of International Standards through technical committees established by the respective organization
19、 to deal with particular fields of technical activity. ISO and IEC technical committees collaborate in fields of mutual interest. Other international organizations, governmental and non- governmental, in liaison with ISO and IEC, also take part in the work. In the field of information technology, IS
20、O and IEC have established a joint technical committee, ISO/IEC JTC 1. IEEE Standards documents are developed within the IEEE Societies and the Standards Coordinating Committees of the IEEE Standards Association (IEEE-SA) Standards Board. The IEEE develops its standards through a consensus developme
21、nt process, approved by the American National Standards Institute, which brings together volunteers representing varied viewpoints and interests to achieve the final product. Volunteers are not necessarily members of the Institute and serve without compensation. While the IEEE administers the proces
22、s and establishes rules to promote fairness in the consensus development process, the IEEE does not independently evaluate, test, or verify the accuracy of any of the information contained in its standards. International Standards are drafted in accordance with the rules given in the ISO/IEC Directi
23、ves, Part 2. The main task of ISO/IEC JTC 1 is to prepare International Standards. Draft International Standards adopted by the joint technical committee are circulated to national bodies for voting. Publication as an International Standard requires approval by at least 75 % of the national bodies c
24、asting a vote. Attention is called to the possibility that implementation of this standard may require the use of subject matter covered by patent rights. By publication of this standard, no position is taken with respect to the existence or validity of any patent rights in connection therewith. ISO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISOIECIEEE163262009SYSTEMSANDSOFTWAREENGINEERINGLIFECYCLEPROCESSESPROJECTMANAGEMENT 系统 软件工程 生命周期 过程 项目

链接地址:http://www.mydoc123.com/p-1257365.html