1、LEEDfor Homes Rating SystemJanuary 2008U.S. Green Building Council -1- January 1, 2010 Corrections, Clarifications 87.5%; 75%; 62.5%; 50%; 37.5%; 25%; and 12.5%. Values in column 3 should be: 0%; 12.5%; 25%; 37.5%; 50%; 62.5%; 75%; and 87.5%. Pg. 85 left column, sixth box should be “EQ 8.2”, not “EA
2、 8.2”. Pg. 86, Table 28 first column, fourth row should be changed from “Energy b) buildings with no mechanical cooling that are located in zone 1 or 2 of the IECC 2004 Climate Zone Map; and c) buildings that are thermally conditioned for human occupancy for less than 876 hours per year. Pg. 95: Und
3、er B. Nonducted HVAC Systems, there should be an “OR” between 7.2 and 7.3. Pg. 98: Upon review, painting has not been shown to be effective in limiting CO exposure. Part a-iii is not required by any project as a condition for earning EQ 10.2. Pg. 111: The Glossary definition of Infiltration Degree-D
4、ays is incorrect. Although heating degree-days and cooling degree-days may be a reasonable proxy for IDDs, it is not correct. The true definition of IDDs is provided in ASHRAE Standard 119-1988 (RA 2004) and it requires a rigorous calculation to determine. General Clarification: LEED for Homes canno
5、t be offered outside of the US at this time because of the technical limitations of adapting the rating system to local codes and the logistical limitations of providing a uniform international verification network. This decision will be revisited in 2012. Canadian projects should pursue LEED Canada
6、 for Homes, offered by the CAGBC. Any project that registered with LEED for Homes prior to the release of LEED Canada for Homes can be certified under LEED for Homes. U.S. Green Building Council -3- January 1, 2010 Clarification: For multi-family buildings, it is unacceptable to have significantly d
7、isparate benefits for different units. A credit or prerequisite is not met if less than 100% of the units satisfy the requirements. For example, PV may only be credited if it serves all of the units / occupants. (EA 10-10) Home Size Adjuster (HSA) Clarification: For group homes (e.g., dormitories, a
8、ssisted living facilities, if a building has 9 units or fewer, treat the building as a single-family home (i.e., include all conditioned space). For buildings with 10 or more units, include both in-unit and residential-associated spaces (communal areas that serve residents) in the home size calculat
9、ion. Residential-associated space should be divided evenly among the units within the multi-family home size calculator. (HSA 02). Interpretation: When determining the square footage of the home for the HSA, include all directly conditioned space within the thermal boundary, calculated to the exteri
10、or wall. Include all normal living spaces and service areas (e.g., garages, utility rooms, closets, entries, crawl spaces, attics, basements) that are within the thermal boundary and meet ANSI Z765 requirements for ceiling height EXCEPT those that are separated from primary living spaces by insulate
11、d, weatherstripped doors AND are neither directly heated nor cooled. In the rare case of mild climates where normal living spaces in the home are neither heated nor cooled, include all spaces that are reasonably expected to be used as living areas or are normal adjuncts to living areas, such as clos
12、ets, utility rooms, entries, etc. Enforced for all projects registered after January 1, 2010 Innovative Design Process (ID) ID 1.2 Integrated Project Team Clarification: The “project team” does not include the Provider and/or green rater. For part (a), the credit should be changed to “Include team m
13、embers, not including the builder or Green Rater, whose capabilities include” Clarification: For part (c), if a project is on hold or inactive, monthly meetings are not required. (ID 01-03) ID 1.3 Professional Credentialed with Respect to LEED for Homes Clarification: ID 1.3 may only be awarded on t
14、he following conditions: 1) the person with the credential must be a principal member of the project team, and not a member of the verification team (e.g., not the Green Rater for the project); 2) the person with the credential must play an ongoing role on the project team, including participation i
15、n meetings, etc.; 3) the credential must be earned prior to the projects preliminary rating. There are currently no credentials or levels of experience that are considered equivalent to LEED AP Homes. (ID 01-06) U.S. Green Building Council -4- January 1, 2010 ID 2.1 Durability Planning Clarification
16、: For part (c), the use of paper-faced backerboard that meets ASTM mold-resistant standards is acceptable for exposed walls and behind fiberglass surrounds. It is not acceptable for use behind tile. (ID 02-17) Clarification: For part (c), the use of nonpaper-faced backerboard only applies to walls n
17、ear tubs, showers, and spas. It is not required on ceilings or bathroom walls not near the tub, shower, or spa. (ID 02-16) ID 3 Innovative or Regional Design Clarification: Exemplary performance credit is not available for process or education related credits (e.g., ID 1.2-1.4; AE credits). Location
18、s and Linkages (LL) LL 1 LEED for Neighborhood Development Clarification: Projects do not need to complete LEED-ND certification before earning this point, but the requirements of Stage 2 must be met. (LL 01-02) 98381481 LL 2 Site Selection Clarification: Part (a) cannot met by raising a home off th
19、e ground. (LL 02-15) Clarification: If there are existing built features within 100 ft that will not be disturbed, these are exempted from LL 2 part (c). If there are existing built features within 100 ft that will be disturbed, the project does not meet LL 2 part (c) and credit LL 2 cannot be earne
20、d. (LL 02-11) LL 3.1 / 3.2 Edge Development / Infill Clarification: Where the term “borders previously developed land” is used, the adjacent land must have development that is at least 5 years old. (LL 03-08) Clarification: Where the term “borders previously developed land” is used, the land itself
21、must be developed. Being located adjacent to a lot with development located on it is not sufficient unless the development is immediately adjacent to the LEED project. (LL 03-09) Clarification: If the home is located in a new development, then the term “development site” includes all of the new home
22、 sites in that new development, not just the one building site that is to be certified. Clarification: If a project borders a body of water, this border should not be included in the calculation i.e. it should not be a credit or penalty. (LL 03-07). U.S. Green Building Council -5- January 1, 2010 Cl
23、arification: If a project borders a park or is a corner lot, the adjacent park or roadway shall be treated as non-existent (i.e., assessment is to be based on the land on the other side of the park, or the land on the other side of one of the roadways). Interpretation: LL 3.3 may only be awarded if
24、75% of the total buildable land for the project was previously developed. This applies to single-family and multi-family projects. If the LEED home is built on the footprint of a previously existing structure, but this footprint comprises less than 75% of the total buildable land, LL 3.3 should not
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GBCLEEDHOMESRATINGSYSTEM2008LEEDFORHOMESRATINGSYSTEMPDF

链接地址:http://www.mydoc123.com/p-1247035.html