UL SUBJECT 199C-2006 Outline of Investigation for Plastic Escutcheons for Sprinklers (Issue 3)《洒水器用塑料孔罩调查大纲 发布编号 3》.pdf
《UL SUBJECT 199C-2006 Outline of Investigation for Plastic Escutcheons for Sprinklers (Issue 3)《洒水器用塑料孔罩调查大纲 发布编号 3》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 199C-2006 Outline of Investigation for Plastic Escutcheons for Sprinklers (Issue 3)《洒水器用塑料孔罩调查大纲 发布编号 3》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNovember 17, 20061SUBJECT 199COUTLINE OF INVESTIGATIONFORPLASTIC ESCUTCHEONS FOR SPRINKLERSIssue Number: 3NOVEMBER 17, 2006Summary of TopicsThis new issue of SU 199C is being issued through ULs e
2、lectronicpublishing system to ensure format uniformity between the PDF andHTML versions of the document. No substantive changes have beenincorporated in the document.The UL Foreword is no longer located within the UL Standard. For informationconcerning the use and application of the requirements con
3、tained in thisStandard, the current version of the UL Foreword is located onULStandardsInfoNet at: http:/ 2006 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULNOVEMBER 17, 2006SUBJECT 199C2No Text on This PageUL C
4、OPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSGENERAL1 Scope .4PERFORMANCE2 General 43 Differential Scanning and Calorimeter Test .44 High Temperature Exposure Test .45 Fire Exposure Test .46 Qualitative Infrared Analysis 5MARKING7 Gener
5、al 5NOVEMBER 17, 2006 SUBJECT 199C 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULGENERAL1 Scope1.1 These requirements cover plastic escutcheons for sprinklers for installation with Listed sprinklers tobe installed in accordance with the Sta
6、ndard NFPA 13.1.2 Sprinkler escutcheons constructed of nonmetallic (plastic) materials are intended for use as a ceilingor wall plate for pendent and horizontal sidewall sprinklers respectively.PERFORMANCE2 General2.1 Sample escutcheons are to be examined for compliance with the construction require
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT199C2006OUTLINEOFINVESTIGATIONFORPLASTICESCUTCHEONSFORSPRINKLERSISSUE3 洒水 器用 塑料 调查 大纲 发布 编号

链接地址:http://www.mydoc123.com/p-1069207.html