SANS 10120-2 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section F Pilin.pdf
《SANS 10120-2 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section F Pilin.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section F Pilin.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 2 Section F-1983 Piling Clause ANNEXURE A. PART 2 : PROJECT SPECIFICATION SECTION F CONTENTS ESSENTIAL PROJECT SPECIFICATION CLATJSES .
4、ESSENTIAL DATA ADDITIONAL CLAUSES General . Normal Projects . Conditions of contract Detail sheets . Earthworks Tests . Documentation and design requirements . Faye Number - EXAMPLE OF DETAIL SHEET 4 August 1983 Approved by the COUNCIL OF TllE SOUTH AFRICAN BUREAU OF STANDARDS SAl3S 0120 : Part 2 Se
5、ction F-1983 Piling SAHS 1200 F : PILING NOTE a) Number PSF clauses in Portion 2 of the project specification in the sequence in which the clauses to which they relate appear in SABS 1200 F. b) The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stat
6、ed, the number(s) of the relevant clause(s) of SARS 1200 F. ESSENTIAL PROJECT SPECIFICATION CLAUSES set out suitable clauses in Portion 2 of the project spccification to provide essential information as follows: a) (Subclause 2.3) State the required cut-off level if it is to be other than 75 mm abov
7、e the underside of the pile cap. b) (Suiclause 5.1.1) Give the piling layout, minimum pile size and/or capacity and specified nominal load, type of pile, main reinforcement, and minimum concrete strength required. Draw attention to the requirements of Subclause 5.1.3.4 of SABS l200 F and to the Cont
8、ractors liability in terms of Subclause 7.8 of SABS 1200 F. C) (Subclause 5.1.2 and 8.1.1) In Portion 1 (or, if necessary, in an annexure to the project specifica- tion) and on a site plan, set out details and give positions of boreholes sunk, cores, results of tests on cores or soil samples, and ot
9、her relevant site investigation data. d) (Suhclause 5.1.3) Where alternative proposals will be considered, state the critical design load or the nominal load of each pile, the maximum permissible deflection, and all other technical data necessary for thrb design of the piles and the piling layout. (
10、See Subclause 2.2 of Section F of Part 3 of the code. ) e) (Su1)clauses 5.1.3.4 and 5.1.4(h) Where an alternative proposal will be considered, specify the additional detail drawings and other information that will be required and the details and calculations that will be ordered if the proposal is a
11、ccepted. f) (Suhclause 5.5.2.2) Where SABS 1200 G has not been included in the contract, include the text of Subclauses 5.5.5.7 of SABS 1200 G as a project specification clause. g) (Suhclause 6.3) State any tolerances that are to apply to preformed cast-in-situ piles in place of those given in Subcl
12、ause 6.2 of SABS 1200 F. h) (Subclause 7.6) State the acceptance criteria that a pile is to meet when tested (see 3.2.4.1 below). ESSENTIAL DATA The availability of certain essential data may affect the prices tendered. Except where such data have been given in the schedde or in the detail sheets (s
13、ee 3.2.2 below) or in the tender drawings, set out in Portion 2 of the project specification suitable clauses covering items such as the following: a) (Subclauses 3.1, and 5.1.3.3) State tle strength or girade of concrete requi.red in the piles if this information has not been given on the drawings.
14、 b) (Subclause 3.4(c) Where necessary, specify another maximum size for the classification of boulders in ternis of Subclause 3.4(c) of SABS 1200 F. NOTE: This size will be the minimum size for the classification of rock formation in terms of Subclause 3.4(d) of SABS 1200 F. C) (Subclauses 5.1.2 and
15、 8.1.1) (See l.l(a) above and also Subclause 1.1 of Section F of Part 3 of the code. ) d) (Subclause 5.1.1) Ensure that the nominal load (see Subclause 2.3 of SABS 1200 F) has been specified. e) (Sulclause 6.1) State the degree of accuracy of the PDs that are to apply if those set out i.n Clause 6 a
16、re not acceptable. f) (Subclause 7.1) Where it is required that a special trial pile be installed and tested, set out details and include suitable items in the schedule. g) (Subclause 7.8.2.1) State the limit of the guarantee required if it is to be other than R500 000. h) (Subclause 8.1.2.1) Where
17、the priced schedule for the original design is not required for comparison with that for an alternative offer, insert a clause to the effect that a priced schedule is not required. ADDITIONAL CLAUSES GENERA,. Where it is necessary to amplify or otherwise to vary the terms of SABS 1200.F to render th
18、em suitable for use in projects to be carried out in particular locations or under particular circumstances, include in the project specification clauses dealing with matters other than those covered by Clauses 1 and 2 above. (See also Subclause 1.3 of Section F of Part 3 of the code.) SAHS 0120 : P
19、drt 2 Section F-19R3 Piling 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.4.1 3.2.4.2 3.2.4.3 NORMAL PROJECTS N(YP1: TO meet requirements mposed by various norms of economlc development, projects are classified as normal, prestige, subeconomic, and labour-based projects (see Clause 4 of Section 0 or Part 3 of the
20、 code). Conditions of Contract. Because they have been framed for use with the gneral conditions of contract1) - (GC(:), certain subclauses of SABS 1200 F may require amendment or amplification when other conditions of contract are applicable. Where conditions of contract other than the WC are appli
21、cable to the contract, ensure titat provisions such as those set out in PSF 1.1 below are inclvded in the applicable conditions of contract or in the special conditions or in Portion 2 of the project specification (The number of the applicable clause of the GCC is given in brackets at the end of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202F1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONFPILINPDF

链接地址:http://www.mydoc123.com/p-1028482.html