1、Lessons Learned Entry: 1096Lesson Info:a71 Lesson Number: 1096a71 Lesson Date: 1997-08-28a71 Submitting Organization: DFRCa71 Submitted by: Ron SunSubject: Construction Site Safety/Handling Pressurized Pipes/Compressed Air Line Description of Driving Event: On 8/28/97, the last working day before La
2、bor Day weekend, a Contractors was installing a 3“ copper underground compressed air line into a trench approximately 18“ wide and 3 feet deep. After having completed about 100 feet of pipe, the Contractors crew began a pressure test of the 3“ pipeline for acceptance. The test was performed prior to
3、 installation of a secondary fiberglass pipe to cover the 3“ copper pipe and backfill the trench. The specified working pressure of the 3“ copper compressed air line was 125 PSI. The specified test pressure was 188 PSI. While the 3“ copper line was still under pressure test, the crew began to instal
4、l the secondary fiberglass pipe to encase the 3“ copper primary pipe. As the crew was lowering the pipe into the trench, approximately 2:45 PM, the crew heard the sound of a “pop“ and then the sound of leaking air coming from a pipe joint coupling. While the 3“ copper line was still under pressure,
5、one worker went into the trench attempting to check the location and the extent of the leak. While the worker was checking the position and direction of the leak from the pipe coupling, the soldered joint failed and the pipeline de-pressurized explosively. An 84-foot section of the pipeline that lea
6、d from the bottom of the trench to ground level was propelled approximately 8 to 9 feet longitudinally along the edge of the trench. Air from the explosive depressurization blew sand and soil on the worker in the trench. The sand abraded the workers arms, chest, and abdominal. The pipe also struck t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS10961997LESSONSLEARNEDCONSTRUCTIONSITESAFETYHANDLINGPRESSURIZEDPIPESCOMPRESSEDAIRLINEPDF

链接地址:http://www.mydoc123.com/p-1018735.html