欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-1096--1997 Lessons Learned Construction Site Safety Handling Pressurized Pipes Compressed Air Line.pdf

    • 资源ID:1018735       资源大小:14.72KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-1096--1997 Lessons Learned Construction Site Safety Handling Pressurized Pipes Compressed Air Line.pdf

    1、Lessons Learned Entry: 1096Lesson Info:a71 Lesson Number: 1096a71 Lesson Date: 1997-08-28a71 Submitting Organization: DFRCa71 Submitted by: Ron SunSubject: Construction Site Safety/Handling Pressurized Pipes/Compressed Air Line Description of Driving Event: On 8/28/97, the last working day before La

    2、bor Day weekend, a Contractors was installing a 3“ copper underground compressed air line into a trench approximately 18“ wide and 3 feet deep. After having completed about 100 feet of pipe, the Contractors crew began a pressure test of the 3“ pipeline for acceptance. The test was performed prior to

    3、 installation of a secondary fiberglass pipe to cover the 3“ copper pipe and backfill the trench. The specified working pressure of the 3“ copper compressed air line was 125 PSI. The specified test pressure was 188 PSI. While the 3“ copper line was still under pressure test, the crew began to instal

    4、l the secondary fiberglass pipe to encase the 3“ copper primary pipe. As the crew was lowering the pipe into the trench, approximately 2:45 PM, the crew heard the sound of a “pop“ and then the sound of leaking air coming from a pipe joint coupling. While the 3“ copper line was still under pressure,

    5、one worker went into the trench attempting to check the location and the extent of the leak. While the worker was checking the position and direction of the leak from the pipe coupling, the soldered joint failed and the pipeline de-pressurized explosively. An 84-foot section of the pipeline that lea

    6、d from the bottom of the trench to ground level was propelled approximately 8 to 9 feet longitudinally along the edge of the trench. Air from the explosive depressurization blew sand and soil on the worker in the trench. The sand abraded the workers arms, chest, and abdominal. The pipe also struck t

    7、he worker in the left knee and groin area. The worker was taken to the Edwards AFB Hospital for treatment. The worker was released from the hospital after treatment that evening. The worker was wearing personal protective equipment (PPE) including a hardhat, boots, safety glasses, and gloves at the

    8、time of the accident.Lesson(s) Learned: 1. Do not work on a pressurized pipeline.2. Reduce pipeline pressure before attempting to locate leak in the pipeline.3. Personal protective equipment (PPE) does save lives. The accident could have caused more Provided by IHSNot for ResaleNo reproduction or ne

    9、tworking permitted without license from IHS-,-,-serious injury had the worker not been wearing PPE.4. Pay extra attention to construction safety procedures during the last working day before a weekend or holiday. Construction workers tend to rush the last working before a weekend or holiday.5. Prepa

    10、ratory inspection is very important. Make sure specified materials are being used. Silver solder was specified for the 3“ copper underground compressed air line. The Contractor used 95-5 solder instead. Silver solder grarantees a much higher strength of the joint.Recommendation(s): 1. Do not allow c

    11、ontractors or other workers to work on a pipeline while conducting high pressure test.2. Reduce pipeline pressure to 40 PSI to 60 PSI to locate a leak.3. Use silver solder on 2“ and larger copper pipes.4. Strictly enforce the three phases of control in construction: preparatory inspection, initial i

    12、nspection, and follow-on inspection.5. Have a safety meeting with the construction crew a day or two before a long weekend or holiday.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AAdditional Key Phrase(s): a71 Facilitiesa71 Safety & Missi

    13、on Assurance.Additional Info: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Approval Info: a71 Approval Date: 2002-02-12a71 Approval Name: John Marcruma71 Approval Organization: DFRCa71 Approval Phone Number: 661-276-2825Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-1096--1997 Lessons Learned Construction Site Safety Handling Pressurized Pipes Compressed Air Line.pdf)为本站会员(Iclinic170)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!