NAVY MIL-S-24154 A (2)-1991 SYNTACTIC BUOYANCY MATERIAL FOR HIGH HYDROSTATIC PRESSURES《高静水压力合成的材料》.pdf
《NAVY MIL-S-24154 A (2)-1991 SYNTACTIC BUOYANCY MATERIAL FOR HIGH HYDROSTATIC PRESSURES《高静水压力合成的材料》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-S-24154 A (2)-1991 SYNTACTIC BUOYANCY MATERIAL FOR HIGH HYDROSTATIC PRESSURES《高静水压力合成的材料》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、- , MIL-S-24154A (2) 93 m 9999906 04b9673 O m 1 INCH-POUND 1 MIL-S-24154A(SHIPS) AMENDMENT 2 6 February 1991 MILITARY SPECIFICATION SYNTACTIC BUOYANCY MATERIAL FOR HIGH HYDROSTATIC PRESSURES This amendment forms a part of MIL-S-24154A(SHIPS), dated 10 March 1967 and is approved for use by the Naval
2、Sea Systems Command, Department of the Navy and is available for use by all Departments and Agencies of the Department of Defense. PAGE 2 * 3.1, Delete and substitute: “3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 6.6) in accordance with 4
3、.3.“ * 3.1.1 : Delete “qualification“ and substitute If irst article. II PAGE 3 * TABLE I, title: Delete “qualification“ and substitute “first article. It PAGE 4 * TABLE II, Under title: Delete “qualification“ and substitute “first article. TABLE II, Columns 3 and 5, water absorption (max. ) (percen
4、t by weight): Under both type I and type II, delete “3“ and substitute II 2 II AMSC N/A 1 of 3 FSC 9330 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handling Services- MIL-S-24154A (2) 93 9999906 04b9b74 2 MIL-S-24154A(SHIPS) AMENDMENT 2 P
5、AGE 5 * 4.2: Delete the word “qualification“ and substitute “first article“. * 4.2: Delete “Footnote L/“ PAGE 6 * 4.2.1, Line 1: Delete the word “qualification“ and substitute “first article“. * 4.3, Line 1: Delete the word “qualification“ and substitute “first article“. * 4.4.1, Line 1: Delete the
6、word “qualification“ and substitute “first article“. PAGE 11 * 6.2( F) : Delete the word “qualification“ and substitute “first article“. PAGE 12 * 6.6, Delete and substitute: “6.6 First article. When first article inspection is required, the contracting officer should provide specific guidance to of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILS24154A21991SYNTACTICBUOYANCYMATERIALFORHIGHHYDROSTATICPRESSURES 静水 压力 合成 材料 PDF

链接地址:http://www.mydoc123.com/p-981607.html