NAVY MIL-R-60875-1973 REMOVER AIRCRAFT CANOPY M8A2 METAL PARTS ASSEMBLY《 M8A2飞机座舱盖金属装配件清洗剂》.pdf
《NAVY MIL-R-60875-1973 REMOVER AIRCRAFT CANOPY M8A2 METAL PARTS ASSEMBLY《 M8A2飞机座舱盖金属装配件清洗剂》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-60875-1973 REMOVER AIRCRAFT CANOPY M8A2 METAL PARTS ASSEMBLY《 M8A2飞机座舱盖金属装配件清洗剂》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-60875 (MU) 28 September 1973 MLLITARY SPECIFICATION REMOVER, AIRCRAFT CANOPY, M8A2 METAL PARTS ASSEMBLY 1. SCOPE 1.1 This specification covers Remover, Aircraft Canopy, M8A2, Metal Parts Assembly. conjunction with other propellant actuated devices in aircrew emergency escape systems. The assem
2、bly wIll ultimately be loaded and used in 2. APPLICABLE DOCUMENTS 2.1 invitation for bids form a part of this specification to the extent specified herein: The following documents of the issue in effect on date of SPECIFICATIONS Federal QQ-A -.601 Aluminum AlIoy Sand Castings Mi lit ar y MIL-A-2550
3、- MIL-C-6021 - MIL-A - 2 118 O - MIL- C-46227 - STANDARDS Mi li tar y MIL-STD-105 - MIL-STD-109 - MIL- STD-Li. 13 - Amunition and Special Weapons, General Specification for Castings , Classification and Inspection Aluminum Alloy Casting, High Strength Components for Propellant Actuated Devices , Gen
4、eral Specification for Sampling Procedures and Tables for Inspection by Attributes Inspection Terms and Definitions Visual Inspection Guide for Rubber O-Rings FSC 1377 1- / y=- - - THIS DOCUMENT CONTAINS / 2 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license
5、from IHS-,-,-_ MIL-R-60875 13 7777706 0341756 O MIL-R-60875 (MU) DRAWINGS Munit ions Command C8837890 - Carton, Packing, Ammunition for Remover, Aircraft Canopy M8A1 or M8A2 with Cartridge M150 Amunition for (1) Remover, Aircraft Canopy, M8A1 or M8A2 with Cartridge M150 Remover, Aircraft Canopy, M8A
6、1 or M8A2, with Cartridge M150 LI-10522143 - Inspection Equipment List for Remover, Aircraft Canopy M8A2 Metal Parts Assembly Metal Parts Assembly C9240994 - Carton, Alternative Packing, C9 230 16 1 - Box, Packing, Amunition for (1) F- 10522 143 - Remover, Aircraft Canopy, M8A2 (Copies of specificat
7、ions, standards, and drawings required by contractors in connection with specific procurement functions should be obtained from the procuring agency or as directed by the contracting officer.) 2.2 Other publications.-The followng document forms a part of this specification to the extent specified he
8、rein, the issue in effect on date of invitation for bid or request for proposal shall apply. Unless otherwise indicated, ASA B46.1 - Surface Texture (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, New York, New York 10018. 3. REQUIREMEN
9、TS 3.1 General.-Materials, parts, and assemblies shall comply with the requirements specified on the applicable drawings, reference specifications, and the following: 3.2 Material.-The contractor shall be responsible for selecting from the classification list contained in the raw material specificat
10、ions, the surface and physical condition of the raw material intended for use in manufacture. 3.3 Physical Properties.-Physical properties required by the drawing shall be uniform throughout the part within specified tolerances. for all alloy steel parts shall be achieved by quenching and tempering.
11、 Requirements Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M1.L-R-bO75 13 W 77777Ob 03Ll1757 2 W MIL-R-608 75(McT) 3.4 Hydrostatic Pressure.-The outside tube, i10522060, and inside tube, D10522036, shall withstand a hydrostatic pressure of 2500 po
12、unds per square inch (psi) minimum, for 15 seconds, minimum, without deformation or mechanical failure (see 6.2). 3.5 Manual Function.-Without electrical power, and with the clutch disengaged, the pull force required to extend the inside tube assembly shall not exceed 40 pounds. 3.6 Reversibility Lo
13、ad.-The remover shall be capable of withstanding a load of 2500 pounds minimum in tension and 1740 pounds minimum in compression at a mid-stroke of approximately 5 inches. The remover shall not travel or unlock due to the applied load. 3.7 Operating Performance.-The remover shall be cycled and shall
14、 be capable of operating to the loads described by the load curves A, B, and C of Figure 1 (see 6.3) and shall comply with the following: 3.7.1 The motor running current dran under load curve B of Figure 1 shall not exceed 13 amperes at 26 to 30 volts D.C. at ambient conditions. 3.7.2 The motor runn
15、ing current drain under load curve C of Figure 1 shall not exceed 20 amperes at 26 to 30 volts D.C. at ambient Conditions. 3.7.3 Time required for linear extension of the remover for a normal stroke of 9.38 inches and under load curve B of Figure 1 shall not exceed 12 seconds using the power require
16、ments specified in 3.5.1, 3.7.4 Time required for linear extension of the remover for a normal stroke of 9.38 inches and under curve C of Figure 1 shall not exceed 15 seconds using the power requirement specified in 3.7.2. 3.7.5 Time requirement for linear retraction of the remover for a normal stro
17、ke of 9.38 inches under curve A of Figure I. shall not exceed 15 seconds at 26 to 30 volts D.C. with a running current drain not to exceed 15 amperes at ambient conditions. 3.7.6 When the load aids the operation of the remover for the full stroke of 9.38 inches, the operating time shall be 5 seconds
18、 minimum to 10 seconds maximum and the running current shall not exceed 10 amperes at 26 to 30 volts D.C. 3.7.7 There shall be no structural failure of any component under the inertia loads imposed by the sudden interruption of electrical power, 3.7.8 At the end of the duty cycle for normal load cur
19、ve B, Figure 1, the remover shall pull against the stop with a force, known as cinch-down load, of 1000 to 1450 pounds. Under this cinch-down load requirements, the load limit switch shall de-energize the remover electic motor. O 3 Provided by IHSNot for ResaleNo reproduction or networking permitted
20、 without license from IHS-,-,-MIL-R-bo875 33 m 7777706 0343758 4 m MIL-R-608 7.5(MU) 3.7.9 Time required to engage clutch shall not exceed 500 milliseconds (see 6.4). 3.7.10 After the remover has cinched down, the clutch shall be disengaged. 500 milliseconds (see 6.5). The time required to disengage
21、 the clutch shall not exceed 3.7.11 The remover shall not fail to operate under normal load curve B of Figure 1 at a voltage input of 18 volts D.C. 3.8 Metal Parts Assembly.-Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. 3.9 Pro
22、tective Finish.-Protective finish shall be in accordance with the applicable specifications and drawings and shall apply to all surfaces of the component regardless of configuration. 3.10 Workmanship-.-The requirements for workmanship are as specified on the applicable drawings, reference specificat
23、ions and the following: 3.10.1 Metal Defects,-Components shall be free from cracks; splits, or other metal defects. 3.10.2 Burr.-No part shall have a burr which might interfere with the assembly or function of the item, or which might be injurious to personnel handling the item. 3.10.3 Foreign Matte
24、r.-Chips, dirt, grease (except where required), rust, corrosion, or other foreign matter shall be removed. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. -Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspecti
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR608751973REMOVERAIRCRAFTCANOPYM8A2METALPARTSASSEMBLYM8A2 飞机 座舱 金属 装配 洗剂 PDF

链接地址:http://www.mydoc123.com/p-981313.html