NAVY MIL-I-60231 B-1995 IGNITION ELEMENT ELECTRIC M55 ASSEMBLY《M55电动点火器要素装配》.pdf
《NAVY MIL-I-60231 B-1995 IGNITION ELEMENT ELECTRIC M55 ASSEMBLY《M55电动点火器要素装配》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-60231 B-1995 IGNITION ELEMENT ELECTRIC M55 ASSEMBLY《M55电动点火器要素装配》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、I INCH-POUND I ML-1-6023 lB(0S) 26 Januarv 1995 MIL44023 1A SUPERSEDING 26 April 1974 MILITARY SPECIFICATION IGNITION ELEMENT, ELECTRIC, M55 ASSEMBLY is specjcarion is approved for use by the Naval Sea Systems command, Department of the Navy, and is available for use all Depamnts and Agencies of the
2、 Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the M55 Ignition Element Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the
3、 extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, G
4、eneral Specification for STANDARDS MILITARY MIL-STD-105 MIL-STD-109 Sampling Procedures and Tables for Inspection by Attributes Quaiity Assurance Terms and Definitions Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document sh
5、ould be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standardization Branch (Code 8420), 101 Strauss Avenue, Indian Head, MD 20640-5035, by using the self addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or b
6、y letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-1-6023LB MIL-1-6023 lB(0S) MIL-STD-129 MIL-STD-202 MIL-STD-453 Inspection, Radiographic
7、MIL-STD-8 10 MIL-STD-1168 Ammunition Lot Numbering Marking for Shipment and Storage Test Methods for Electronic and Electrical Component Parts Environmental Test Methods and Engineering Guidelines (Unless otherwise specified, copies of federal and military specifications and standards are available
8、from Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia, PA 191 11- 5094.) 2.1.2 Other Government documents, drawings, and publications. The following Government drawings form a part of this specification to the extent specified herein. Unless otherwise specified, th
9、e issues are those cited in the solicitation (see 6.2). DRAWINGS Naval Surface Warfare Center, Indian Head Division (CAGE Codes 19200 and 19203) DL10534225 8887525 92 3 3 342 Ignition Element, Electric, M55 Assembly Box, Packing, Ammunition, for Ignition Element, Electric, M55 Container, Ammunition,
10、 Metal, for Ignition Element, Electric, M55 (Application for copies should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Attn: Data Control Branch (Code 8410), Indian Head, MD 20640-5035.) 2.2 Non-Government publications. The following document forms a part of this
11、document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in the issue of the DODISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents c
12、ited in the solicitation (see 6.2). ANSI B46.1 Surface Texture (Application for copies should be addressed to the American National Standards Institute (ANSI), 1430 Broadway, New York, N.Y. 10018). 2.3 Order of precedence. In the event of a conflict between the text of this document and the referenc
13、es cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspecti
14、on (see 6.5) in accordance with 4.4. 3.2 Conformance to documents. The M55 Ignition Element covered by this specification shall be manufactured in accordance with DL10534225. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-bO231B 9 9999706 17
15、9b7LB 701 MIL-1-6023 lB(0S) 3.3 Materials. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained fiom the cognizant Navy design a
16、ctivity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Electrical. 3.4.1 Dielectric withstanding voltage. The body assembly, prior to the assembly of the bridgewire, shall not
17、 exhibit a leakage current in excess of 100 microamperes when subjected to lo00 volts of direct current applied between pin and body. 3.4.2 Bridge circuit resistance. The bridge circuit resistance of the ignition element shall be O. 11 f 0.03 ohm. 3.5 Environmental. 3.5.1 Leakage. The ignition eleme
18、nt shall not exhibit a leak rate of 1 x lo-* cubic centimeters per second or more when withstanding a dry leak test at a pressure differential of 14 psi. 3.5.2 Vibration. The ignition element shall withstand vibration testing in accordance with MIL-STD- 810, method 514.3, test procedure I, test cond
19、ition I, with no evidence of disintegration of the propellant or derangement of components. The ignition element shall not autoignite, shall be safe to handle, and shall meet the requirements of 3.4.2, 3.5.1, 3.7.1, and 3.7.2 at 70F following vibration testing. 3.5.3 Hydrostatic pressure. The body a
20、ssembly shall be capable of withstanding a hydrostatic pressure of 10,ooO psi without any evidence of mechanical failure or leakage (see 6.4.2). 3.6 Radiographic examination. Each ignition element shall be radiographically examined for defects (see 4.5.3.4). 3.7 Functional. 3.7.1 Maximum no-fire sti
21、mulus. The electrical ignition element shall not fire when a direct current of 1.5 amperes, maximum, is applied for 60 seconds. 3.7.2 All-fire stimulus. After the application of the maximum no-fire stimulus current, the electrical ignition element shall fire within 50 milliseconds maximum when a dir
22、ect current of 5.0 amperes is applied at temperatures of -65“F, 70“F, and 200F. The test fixture shall be temperature conditioned along with the test unit. The electric ignition element shall deliver a pressure of Zoo0 psi minimum to 6O psi maximum when fired into a 1 cubic centimeter bomb. There sh
23、all be no evidence of blowback or mechanical failure of the glass-to-metal seal (see 6.4.1 and 6.4.2). 3.7.3 Minimum all-fire stimulus. The ignition element shall fire within 50 milliseconds when a direct current of 3.5 amperes is applied at temperatures of -65“F, 70“F, and 200F. The electric igniti
24、on element shall meet the requirements of 3.7.2. Data will be recorded for information only (see 6.4.1). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-bO2316 MIL-1-23 lB(0S) 3.8 Workmanship. Workmanship shall be in accordance with the requi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI60231B1995IGNITIONELEMENTELECTRICM55ASSEMBLYM55 电动 点火器 要素 装配 PDF

链接地址:http://www.mydoc123.com/p-979912.html