1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16829 Aero Shutter Assembly Dry Mud Bench Test Copyright 2013 General Motors Company All Rights Reserved January 2013 Page 1 of 5 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict betwe
2、en the English and domestic language, the English language shall take precedence. 1.1 Purpose. The purpose of this procedure is to determine if an aero shutter assembly meets the dry mud bench test requirements of the Component Technical Specification (CTS). 1.2 Foreword. Not applicable. 1.3 Applica
3、bility. This test procedure is to be used for all aero shutter assemblies. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3221 2.3 Additional References. Component Techni
4、cal Specifications (CTS) 3 Resources 3.1 Facilities. Not applicable. 3.2 Equipment. 3.2.1 Software. Software and interfacing hardware shall be provided by the actuator supplier that includes the operating parameters for the actuator and can be used with a personal computer. These operating parameter
5、s include opening, closing, and commanding specific torque values to the actuator. 3.2.2 Pulse Width Modulation (PWM) or Local Interconnect Network (LIN) Generators. PWM or LIN generators are required to allow the software to send a signal to the actuator to cycle the aero shutter assembly and send
6、a signal back through the software that the aero shutter assembly was able to successfully cycle. The generator must also be capable of representing the actuator sending a signal to the vehicle level controller and triggering the “re-try” operation mode when an obstruction prevents the louvers from
7、cycling to the open or closed position. 3.2.3 Twelve Volt (12 V) Battery Source. A 12 V battery source is required to power the actuator. 3.2.4 Mud Application Apparatus. A Kobalt Air Hopper Gun or equivalent apparatus is required for application of mud. A Kobalt Air Hopper Gun (Model No. SGY-AIR84)
8、 can be ordered from the following website: . This apparatus must be equipped with an 8 mm diameter spray tip and capable of a maximum spray pressure of 40 psi. 3.2.5 Camera. A camera is required for pre and post test photographs. 3.3 Test Vehicle/Test Piece. 3.3.1 Test Piece. The parts used for des
9、ign validation (DV) testing are to be complete aero shutter assemblies off of prototype tools. The parts used for product validation (PV) are to be complete aero shutter assemblies off of production tools. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot
10、for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16829 Copyright 2013 General Motors Company All Rights Reserved January 2013 Page 2 of 5 3.3.2 Test Piece Quantity. Per CTS. 3.3.3 Conditioning. Condition to GMW3221, Code A. 3.4 Test
11、 Time. Calendar time: 1 days Test hours: 4 hours Coordination hours: 2 hours 3.5 Test Required Information. 3.5.1 Test Setup Photographs. Take photographs of the test setup prior to start of test. 3.5.2 Part Photographs. Take photographs of the aero shutter assemblies to be tested before, during, an
12、d after test. 3.6 Personnel/Skills. Prior experience in setting up and running similar tests and experience in the use of the referenced test equipment are critical to achieving the estimated times in 3.4. 4 Procedure 4.1 Preparation. 4.1.1 Test Piece Constraints. The aero shutter assembly is to be
13、securely constrained to a test fixture representing all vehicle attachments and the correct vehicle orientation. An example is provided in Figure 1. Figure 1: Example of Test Setup 4.2 Conditions. 4.2.1 Environmental Conditions. Test is to be run in a room at a temperature of 23 C 5 C. 4.2.2 Test Co
14、nditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. 4.3.1 Pre-Test Instructions. 4.3.1.1 Confirm Test Connections. Confirm the following connections hav
15、e been made correctly: personal computer to PWM or LIN generator, 12 V battery source to PWM or LIN generator, and PWM or LIN generator to actuator. 4.3.1.2 Cycle Definition. 4.3.1.2.1 Mud Application with Louvers Closed. A cycle is defined as follows: Starting with the shutters in the full closed p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW168292013AEROSHUTTERASSEMBLYDRYMUDBENCHTESTISSUE1ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757887.html