GME TM 412400-2003 TPO - Foil (Issue 4 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement)《热塑性聚烯烃(.pdf
《GME TM 412400-2003 TPO - Foil (Issue 4 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement)《热塑性聚烯烃(.pdf》由会员分享,可在线阅读,更多相关《GME TM 412400-2003 TPO - Foil (Issue 4 English German This standard may be applied only for current programs It is inactive for all future projects and without replacement)《热塑性聚烯烃(.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、ADAM OPEL AGTDCCentral LaboratoriesTECHN. LIEFERBEDINGUNGENFR WERKSTOFFEENGINEERINGMATERIAL SPECIFICATIONLIMITED USETM 412400TPO-Folie / TPO-Foil1 Werkstoff / MaterialTPO-Folie mit PO-Schaum auf Trgerwerkstoff (z.B. TM 912800) kaschiert. /TPO-Foil with PO foam laminated to a carrier material (e.g. T
2、M 912800).2 Verwendungszweck / ApplicationFolie, z.B. fr Trverkleidung. /Foil, e.g. for door trim.3 Bemerkung / NoteFreigabemuster, fr die diese Vorschrift zutrifft, mssen nach dieser Vorschrift geprft werden und von derProduktentwicklung genehmigt sein, ehe eine Lieferung erfolgen kann. Bei beabsic
3、htigter Abweichung vondieser Vorschrift oder von den bisher freigegebenen Mustern ist der Hersteller verpflichtet, unaufgefordert denAbnehmer mit einer Dokumentation ber alle vorgesehenen Vernderungen zu informieren. Auf Anforderungsind Prfmuster in der genderten Ausfhrung zur erneuten Bemusterung u
4、nd Genehmigung durch die Pro-duktentwicklung vorzulegen, bevor die Abweichung in der Lieferung einsetzen kann. /Samples of components or material released to this specification shall be tested for conformity with the re-quirements of this specification and approved by Product Engineering prior to co
5、mmencement of delivery ofbulk supplies. In the event of any intentional deviations from the requirements of this specification or the pre-viously released samples, it is the sole responsibility of the supplier to inform the purchaser unsolicited with adocumentation of all such deviations. Upon reque
6、st the supplier shall submit samples of the changed versionfor reapproval by Product Engineering prior to commencement of delivery of deviant bulk supplies.Ausfertigungs-Nr.:Issue: 4Datum:Date: 03/2013Ausgefertigt:Prepared: JKRGenehmigt:Approved: T. WeiserSeite vonPage 1 of 5Unbeschadet etwaiger dur
7、ch den Abnehmer erfolgenden Stichprobenprfungen trgt der Lieferant die Verantwortung dafr, da die gelieferteWare die Opel-Zeichnungsvorschriften erfllt. Ein Prfbericht mit zahlenmigen Ergebnissen aus Prfungen der Lieferung selbst ist bei jederBemusterung, Erstbelieferung und Ausfhrungsnderung mitzug
8、eben.Despite spot checks possibly performed by Opel, it is the suppliers responsibility that the delivered parts are in line with the Opel drawings.Deliveries of samples, first off-tool parts and parts, whose performance has been changed, must be accompanied by a test report showing thetest results
9、in terms of figures.LBSP TL WS 1 11/95Note: This standard may be applied only for current programs. It is inactive for all future pro-jects and without replacement.Hinweis: Diese Spezifikation darf nur noch fr laufende Projekte angewendet werden und istfr alle zuknftigen Projekte ohne Ersatz ungltig
10、.LIMITED USE TM 412400Ausfertigungs-Nr.: 4Issue:Datum:Date: 03/2013Ausgefertigt:Prepared: JKRGenehmigt:Approved: T. WeiserSeite 2 von 5Page ofLBSP TL 2 04/01S O L L /Specified valueI S T /Actual value4 Anforderungen / RequirementsDie Anforderungen gelten fr die Folie im verarbeiteten Zustandauf eine
11、n Trger kaschiert. Die Probekrper sind aus mglichstplanen Bereichen des Fertigteils zu entnehmen. Die Kennzeich-nung des Entnahmebereichs auf der entsprechenden Teilzeich-nung ist ggf. zu beachten. Die Prfungen Abschnitt 4.4.1 bis4.4.7 werden grundstzlich am zeichnungsgerechten Zusam-menbau ermittel
12、t. /The requirements applies to the foil in treated condition laminatedto a carrier material. Test pieces shall be taken from the flattestpossible area of the finished part. The area from which test piec-es shall be cut may be shown on the respective component draw-ing and where applicable, this sha
13、ll be complied with.Tests to paragraph 4.4.1 to 4.4.7 shall be made on the assemblyto drawing.4.1 Anforderungen an die Folie mit Schaum /Requirements for the Foil with Foam4.1.1 Flchengewicht / Weight per Unit Areanach / to GME 60301 - (420560) g/m24.1.2 Dicke / Thicknessnach / to GME 60303 - 1 A -
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMETM4124002003TPOFOILISSUE4ENGLISHGERMANTHISSTANDARDMAYBEAPPLIEDONLYFORCURRENTPROGRAMSITISINACTIVEFORALLFUTUREPROJECTSANDWITHOUTREPLACEMENT

链接地址:http://www.mydoc123.com/p-756471.html