DOT 23 CFR PART 505-2011 PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING.pdf
《DOT 23 CFR PART 505-2011 PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING.pdf》由会员分享,可在线阅读,更多相关《DOT 23 CFR PART 505-2011 PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE EVALUATION AND RATING.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、146 23 CFR Ch. I (4111 Edition) Pt. 505 or travel estimates discussed in para-graph (g) of this section remain cur-rent. Copies of the States documenta-tion shall be provided to the FHWA Di-vision Administrator when it is ini-tially developed and after each revi-sion. PART 505PROJECTS OF NA-TIONAL A
2、ND REGIONAL SIGNIFI-CANCE EVALUATION AND RAT-ING Sec. 505.1 Purpose. 505.3 Policy. 505.5 Definitions. 505.7 Eligibility. 505.9 Criteria for grants. 505.11 Project evaluation and rating. 505.13 Federal Governments share of project cost. 505.15 Full funding grant agreement. 505.17 Applicability of Tit
3、le 23, U.S. Code. AUTHORITY: Section 1301 of the Safe, Ac-countable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (Pub. L. 109 59; 119 Stat. 1144); 23 U.S.C. 315; 49 CFR 1.48. SOURCE: 73 FR 63370, Oct. 24, 2008, unless otherwise noted. 505.1 Purpose. The purpose of this part is
4、to estab-lish evaluation, rating, and selection guidelines for funding proposed Projects of National and Regional Sig-nificance (PNRS). 505.3 Policy. A Project of National and Regional Significance should quantitatively im-prove the throughput or provide long term congestion relief for passenger or
5、freight movement for a part of the transportation network and clearly connect this improvement to sustain-able economic productivity for the na-tion or the region in which it is lo-cated. 505.5 Definitions. Unless otherwise specified in this part, the definitions contained in 23 U.S.C. 101(a) are ap
6、plicable to this part. In addition, the following definitions apply: Applicant means either: (1) A State Transportation Depart-ment, or (2) A group of State Transportation Departments, with one State acting as the project lead. Eligible project means any surface transportation project or set of inte
7、-grated surface transportation projects closely related in the function they perform eligible for Federal assistance under title 23, United States Code, in-cluding public or private rail facilities providing benefits to highway users, surface transportation infrastructure modifications to facilitate
8、 intermodal interchange, transfer, and access into and out of ports and other activities el-igible under such title. Eligible project costs means the costs pertaining to an eligible project for: (1) Development phase activities, in-cluding planning, feasibility analysis, revenue forecasting, environ
9、mental re-view, preliminary engineering and de-sign work, and other preconstruction activities; (2) Construction, reconstruction, re-habilitation, and acquisition of real property (including land related to the project and improvements to land), en-vironmental mitigation, construction contingencies,
10、 acquisition of equip-ment, and operational improvements; and (3) all debt financing costs authorized by 23 U.S.C. 122. Full Funding Grant Agreement (FFGA) means the agreement used to provide Federal financial assistance under title 23, United States Code, for Projects of National and Regional Signi
11、ficance. An FFGA defines the scope of the project, establishes the maximum amount of Government financial assistance for the project, covers the period of time for completion of the project, facili-tates the efficient management of the project in accordance with applicable Federal statutes, regulati
12、ons, and pol-icy, including oversight roles and re-sponsibilities, and other terms and con-ditions. 505.7 Eligibility. To be eligible for assistance under this program: (a) A project meeting the definition of an eligible project under 505.5 of this section located fully within one State shall have e
13、ligible project costs that VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00156 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-147 Federal Highway Administration
14、, DOT 505.9 are quantified in the project proposal as equal to or exceeding the lesser of: (1) $500,000,000; or (2) 75 percent of the amount of Fed-eral highway assistance funds appor-tioned for the most recently completed fiscal year to the State in which the project is located. (b) A multi-State p
15、roject meeting the definition of an eligible project under 505.5 of this section shall have eligible project costs that are quantified in the project proposal as equal to or exceed-ing the lesser of: (1) $500,000,000; or (2) 75 percent of the amount of Fed-eral highway assistance funds appor-tioned
16、for the most recently completed fiscal year to the State in which the project is located that has the largest apportionment. 505.9 Criteria for grants. (a) The Secretary will approve a grant for a Project of National and Re-gional Significance project only if the Secretary determines, based upon in-
17、formation submitted by the applicant, that the project: (1) Is based on the results of prelimi-nary engineering; (2) Is supported by an acceptable de-gree of non-Federal financial commit-ments, including evidence of stable and dependable financing sources to con-struct, maintain, and operate the inf
18、ra-structure facility. In evaluating a non- Federal financial commitment, the Secretary shall require that: (i) The proposed project plan provides for the availability of contingency amounts that the Secretary determines to be reasonable to cover unanticipated cost increases; and (ii) Each proposed
19、non-Federal source of capital and operating financing is stable, reliable, and available within the proposed project timetable. In as-sessing the stability, reliability, and availability of proposed sources of non- Federal financing, the Secretary will consider: (A) Existing financial commitments; (
20、B) The degree to which financing sources are dedicated to the purposes proposed; (C) Any debt obligation that exists or is proposed by the recipient for the pro-posed project; and (D) The extent to which the project has a non-Federal financial commit-ment that exceeds the required non- Federal share
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART5052011PROJECTSOFNATIONALANDREGIONALSIGNIFICANCEEVALUATIONANDRATINGPDF

链接地址:http://www.mydoc123.com/p-701901.html