《ASTM F2479-2010 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing《就地浇筑运动场表面的规格、采购、安装与维护的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2479-2010 Standard Guide for Specification Purchase Installation and Maintenance of Poured-In-Place Playground Surfacing《就地浇筑运动场表面的规格、采购、安装与维护的标准指南》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2479 10An American National StandardStandard Guide forSpecification, Purchase, Installation and Maintenance ofPoured-In-Place Playground Surfacing1This standard is issued under the fixed designation F2479; the number immediately following the designation indicates the year oforiginal a
2、doption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers information with regard to the design,manufacture,
3、installation, and maintenance of poured-in-placeplayground surfaces.NOTE 1This document is a guide and not intended to be used as aspecification; it should be used for educational purposes.1.2 This guide outlines the issues of compliance withexisting standards, durability, and functional longevity.1
4、.3 This guide reviews issues such as edge treatment,abutting surfaces, and combinations with other surfaces de-signed for circulation or protective surfaces.1.4 This guide presents maintenance considerations andgeneral procedures that should be followed by the owner/operator.1.5 This guide outlines
5、aging considerations such as loss ofimpact absorption, cracking, shrinkage, heaving, and how toprevent, accommodate, or rectify those issues.1.6 This guide presents warranty considerations.1.7 This guide does not imply that an injury cannot beincurred when the surface system is compliant with thesta
6、ndards referred to in this guide.1.8 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.9 This standard does not purport to address all of
7、 thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2F1292 Specification for
8、Impact Attenuation of SurfacingMaterials Within the Use Zone of Playground EquipmentF1951 Specification for Determination of Accessibility ofSurface Systems Under and Around Playground Equip-ment2.2 CSA Standard:3CSA Z614 Childrens Playspaces and Equipment3. Terminology3.1 Definitions:3.1.1 aliphati
9、c prepolymerprepolymer which does notcontain any 1,3,5-cyclohexatrien group.3.1.1.1 DiscussionGenerally highly color stable whenexposed to UV radiation, no yellowing.3.1.2 ambient grindingprocess that takes raw rubberproducts and processes it to rubber crumb, chips, buffings, andso forth that is at
10、the temperature generated by the grindingequipment or in the location of production.3.1.3 aromatic prepolymerhydrocarbons that are madefrom only hydrogen and carbon and contain a prepolymerwhich contains one or more 1,3,5-cyclohexatriene group.3.1.3.1 DiscussionAromatic prepolymer are generallysusce
11、ptible to change when exposed to UV and moisture.These changes can be seen as a yellowish shading or “amber-ing” of the top surface, especially when encapsulating rubbercrumb that is grey, light blue, blue, eggshell, teal, and so forth.3.1.4 asphalt, adjacentbituminous bound material that isused as
12、a curb or walkway and comes into contact with thepoured-in-place surface.3.1.4.1 DiscussionThe materials and compaction shallconform to local engineering practices and have a mechanicalcompaction of no less than 98 % standard proctor density. Theedge of the asphalt at the junction with the poured-in
13、-placesurface shall be vertical to 30 from horizontal. Considerationshould be given to the use of an appropriate primer asrecommended by the manufacturer to ensure adhesion of thepoured-in-place surface to the asphalt.3.1.5 asphalt, basehard, bituminous bound surface that isunder the poured-in-place
14、 surface.1This guide is under the jurisdiction of ASTM Committee F08 on SportsEquipment and Facilities and is the direct responsibility of Subcommittee F08.63 onPlayground Surfacing Systems.Current edition approved Jan. 15, 2010. Published February 2010. Originallyapproved in 2007. Last previous edi
15、tion approved in 2007 as F2479 07. DOI:10.1520/F2479-10.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Avai
16、lable from Canadian Standards Association (CSA), 5060 Spectrum Way,Mississauga, ON L4W 5N6, Canada, http:/www.csa.ca.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.1.5.1 DiscussionNew asphalt should cure at least 14days, have no r
17、esidual surface oils, and be pressure washed orhave at least two thorough rainfalls prior to receiving poured-in-place surface. When the surface is flooded with as much as0.2 in. (5.1 mm) of water, there should be no evidence(rainbow effect) of oils on the surface of the water. A properlyprepared as
18、phalt base will be able to effectively remove anywater which penetrates the poured-in-place surface. This maybe accomplished by sloping the asphalt, installing drainage, orusing porous asphalt.3.1.6 concrete, baseconcrete surface that is under thepoured-in-place surface.3.1.6.1 DiscussionThe concret
19、e base should be 4 in. (100mm) minimum thickness. All new concrete slabs should curefor a minimum of seven days prior to receiving poured-in-placesurface. Concrete base should have a medium broom finish. Aproperly prepared concrete base will be able to effectivelyremove any water which penetrates th
20、e poured-in-place sur-face. This may be accomplished by sloping the concrete,installing drainage, or using a porous concrete.3.1.7 concrete, adjacentconcrete material that is used as acurb or walkway and comes into contact with the poured-in-place surface3.1.7.1 DiscussionThe materials and compactio
21、n shallconform to local engineering practices and have a moisturecontent less than 5 % at the time the poured-in-place surface isinstalled. The edge of the concrete at the junction with thepoured-in-place surface shall be vertical. Consideration shouldbe given to the use of an appropriate primer as
22、recommendedby the manufacturer to ensure adhesion of the poured-in-placesurface to the concrete. Other strategies to avoid sinking of thefinal poured-in-place surface would be to provide a “key” or“step” in the vertical face of the concrete to support thepoured-in-place surface.3.1.8 cryogenic grind
23、ingprocess that takes a raw rubberproduct and processes it to rubber crumb, chips, and so forth,a process that freezes the raw product and the frozen product isground to the specification.3.1.9 gravel, base mixture of crushed stone, sand, or boththat is compacted to not less than 95 % standard proct
24、ordensity.3.1.9.1 DiscussionA geotextile may be required betweenthe granular base and poured-in-place surface to ensure that theparticles of the granular base do not contaminate the poured-in-place surface. If fine particles from the base migrate into thepoured-in-place system the void content of th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF24792010STANDARDGUIDEFORSPECIFICATIONPURCHASEINSTALLATIONANDMAINTENANCEOFPOUREDINPLACEPLAYGROUNDSURFACING

链接地址:http://www.mydoc123.com/p-538813.html