ASTM E833-2013 red 8186 Standard Terminology of Building Economics.pdf
《ASTM E833-2013 red 8186 Standard Terminology of Building Economics.pdf》由会员分享,可在线阅读,更多相关《ASTM E833-2013 red 8186 Standard Terminology of Building Economics.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E833 12E833 13Standard Terminology ofBuilding Economics1This standard is issued under the fixed designation E833; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indic
2、ates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This terminology relates to the economic evaluation of building construction as used in other standards under the jurisdictionof ASTM Committee E06 on Performance
3、 of Buildings, and it does not necessarily correspond to the terminology used in otherareas of accounting and economics.2. Referenced Documents2.1 ASTM Standards:2E1699 Practice for Performing Value Engineering (VE)/Value Analysis (VA) of Projects, Products and ProcessesE2691 Practice for Job Produc
4、tivity Measurement3. Terminologyadjusted internal rate-of-return (AIRR), nthe compound rate of interest that, when used to discount the terminal values ofcosts and benefits of a project over a given study period, will make the costs equal the benefits when cash flows are reinvestedat a specified rat
5、e (syn. financial management rate of return (FMRR).allowance, nin construction design planning and estimating, an allocation of money that is intended to be spent for a specificpurpose.DISCUSSIONAn allowance is used in the absence of precise knowledge, and estimated, to be of ones knowledge, to ensu
6、re a full and complete estimate.Allowancescover events and activities that are normally directly controllable within a project plan.annual value, na uniform annual amount equivalent to the project costs or benefits taking into account the time value of moneythroughout the study period (syn. annual w
7、orth, equivalent uniform annual value).annual worth, nSee annual value.annually recurring costs, nthose costs that are incurred in a regular pattern each year throughout the study period.base date, nSee base time.base time, nthe date to which all future and past benefits and costs are converted when
8、 a present value method is used (usuallythe beginning of the study period) (syn. base date).baseline labor hour budget, na budget of direct labor hours created at the onset of a new construction project that approximateshow many hours will be spent on any defined part of the project.DISCUSSION1 This
9、 terminology is under the jurisdiction of ASTM Committee E06 on Performance of Buildings and is the direct responsibility of Subcommittee E06.81 on BuildingEconomics.Current edition approved May 1, 2012Oct. 1, 2013. Published June 2012November 2013. Originally approved in 1981. Last previous edition
10、 approved in 20092012 asE833 09a.E833 12. DOI: 10.1520/E0833-12.10.1520/E0833-13.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page
11、on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that use
12、rs consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1The budgeted hours are first
13、 assigned to the tasks on the project, and can be summed to determine budgeted hours for any cost code or for the entireproject.baseline plan, nan established scope, cost, schedule, and technical performance plan against which the status of resources andthe effort of the overall program or project a
14、ctivities are measured, assessed, and controlled.benefit-cost analysis, na method of evaluating projects or investments by comparing the present value or annual value ofexpected benefits to the present value or annual value of expected costs.benefit-to-cost ratio (BCR), nbenefits divided by costs, w
15、here both are discounted to a present value or equivalent uniformannual value (syn. benefit-cost ratio).break even analysis, na technique for determining that value of a variable which results in benefits (savings) just equal to costs.building decision, na decision regarding the design, financing, e
16、ngineering, construction, management, or operation of abuilding.building economics, nthe application of economic analysis to the design, financing, engineering, construction, management,operation, ownership, or disposition of buildings.building system, nan aggregation or assemblage of items joined i
17、n regular interaction or interdependence in buildings orbuilding construction.capital cost, nthe costs of acquiring, substantially improving, expanding, changing the functional use of, or replacing a buildingor building system.cash flow, nthe stream of monetary (dollar) valuescosts and benefitsresul
18、ting from a project investment.certainty equivalent technique, na technique used to adjust economic measures of project worth to reflect risk exposure andrisk attitude.DISCUSSIONEstimated project returns are multiplied by a certainty equivalent factor (CEF) to determine the certainty equivalent amou
19、nt a decision maker findsequally acceptable to the estimated project returns.code of accounts, na hierarchical, company-specific system for cost accounting, control, and management.Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), nalso known as “Superfund,”CERCLAprescr
20、ibes actions and regulatory requirements for reducing risks to human health and the environment resulting fromreleases or threatened releases of hazardous substances into the environment.condition indexdescriptive or numeric rating used to represent the “condition” of the rated asset as of a stated
21、point in time.DISCUSSIONExamples of condition indices include quantitative scores (scale of 0-100; 0-10; 0-5) based upon statistically sampled data and associated deficiencycurves or defined descriptors (good fair poor).constant dollars, ndollars of uniform purchasing power exclusive of general infl
22、ation or deflation.DISCUSSIONConstant dollars are tied to a reference year.construction contingency, nthe funds added to estimated and known costs in case of cost overruns during construction.construction documents, nmaterials that convey the physical, aesthetic, technical, performance, and administ
23、rative require-ments necessary to initiate a contract for construction of the proposed project.contingency, nin construction design planning and estimating, a sum of money that is provided to cover the occurrence ofunintended departures from the planned scope of work.DISCUSSIONE833 132Acontingency i
24、s used in the absence of precise knowledge, and estimated, to be of ones knowledge, to ensure that a financial buffer is available withina budget. Contingencies assist in mitigating the effects of unplanned events and other risks that are normally not directly controllable within a projectplan.contr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME8332013RED8186STANDARDTERMINOLOGYOFBUILDINGECONOMICSPDF

链接地址:http://www.mydoc123.com/p-533631.html