ASTM D4296-1983(2004) Standard Practice for Sampling Pitch《硬沥青的采样》.pdf
《ASTM D4296-1983(2004) Standard Practice for Sampling Pitch《硬沥青的采样》.pdf》由会员分享,可在线阅读,更多相关《ASTM D4296-1983(2004) Standard Practice for Sampling Pitch《硬沥青的采样》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 4296 83 (Reapproved 2004)An American National StandardStandard Practice forSampling Pitch1This standard is issued under the fixed designation D 4296; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last r
2、evision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers procedures for sampling pitch atpoints of manufacture, storage, and delivery.1.2 This standard does no
3、t purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. Specific warningstatements are given in
4、 Section 11.2. Terminology2.1 Definitions:2.1.1 bulk samplea large sample, either from one place ormade up of several incremental samples of the same material.2.1.2 composite samplea thoroughly mixed gross sample.2.1.3 gross samplea large sample made up of severalportions (increments) of a mass of m
5、aterial.2.1.4 incrementa portion of a material to be combinedwith other portions of the same material to provide a largersample which will represent the whole material.2.1.5 representative samplea part of a homogeneous ma-terial, or a part of the composited and mixed portions of amaterial, which car
6、ries all the true properties and physicalcharacteristics of the whole material.2.1.6 samplea part taken as representative of a wholematerial.3. Summary of Practice3.1 Samples of liquid pitches are taken from process lines,storage, and shipment containers in increments required toprepare a representa
7、tive sample for testing.3.2 Samples of solid pitches are taken from loading sys-tems, storage, and shipment containers in increments requiredto prepare a representative sample for testing.4. Significance and Use4.1 Sampling is as important as testing. If the sampling isimproperly done, the sample of
8、 the material will be in error,and the analysis will not represent the true properties of thematerial, and it may be impossible or impracticable to takeanother sample; whereas, if the sample is properly taken andthe analysis is in error, another analysis can readily be made ofthe original sample.4.2
9、 Samples may be taken for either of the following twopurposes:4.2.1 To represent as nearly as possible an average of thebulk of the materials sampled, or4.2.2 To ascertain the maximum variation in characteristicswhich the material possesses.4.3 A good sampling plan has the following characteristics:
10、4.3.1 It protects the consumer against the acceptance of abad batch of material.4.3.2 It protects the producer against the rejection of a goodbatch of material.4.3.3 It gives long-range protection to the consumer.4.3.4 It encourages the producer to keep his process incontrol.4.3.5 It minimizes the c
11、ost of sampling, inspection oftesting, and administration.4.3.6 It provides information concerning the quality of theproduct.4.4 Sampling IntegrityWhen one takes a sample, one isattempting to represent a batch or lot of material with thatsample. Different forms of pitch, and pitch in different types
12、 ofcontainers, need to have different sampling plans and appro-priate sampling equipment. Each sampling plan should bedesigned so that it accomplishes its objective, which is toascertain the characteristics or quality of a batch or lot ofmaterial.5. Selection of Samples5.1 Pitches shall be sampled b
13、y the producer at the point ofmanufacture or storage, and at such time as to allow the testscontrolling acceptance or rejection of quality, as specified bythe consumer, to be made in advance of a shipment.1This practice is under the jurisdiction of ASTM Committee D02 on PetroleumProducts and Lubrica
14、nts and is the direct responsibility of Subcommittee D02.05 onProperties of Fuels, Petroleum Coke and Carbon Material.Current edition approved Nov. 1, 2004. Published November 2004. Originallyapproved in 1983. Last previous edition approved in 1999 as D 4296 83 (1999).1Copyright ASTM International,
15、100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.2 Samples of pitches shall be taken by the consumer fromthe shipment containers immediately upon delivery and receiptand tests controlling acceptance or rejection of quality, asdescribed by the consumers specificat
16、ions, shall be made assoon as possible.6. Size of Samples6.1 The sample size of liquid materials shall be as follows:6.1.1 From process lines, 1 L (1 qt).6.1.2 From bulk storage, 1 L (1 qt) or 1-L aliquot ofcomposite sample.6.1.3 From bulk shipment containers, 1 L (1 qt) or 1-Laliquot of composite s
17、ample.6.1.4 From barrels or drums, 0.5 L (1 pt) or 0.5-L aliquot ofcomposite sample.6.2 The sample size of solid materials shall be as follows:6.2.1 From storage area, 4 L (1 gal) or 4-L aliquot ofcomposite sample.6.2.2 From bulk shipment containers, 4 L (1 gal) aliquot ofcomposite sample.6.2.3 From
18、 barrels or drums, 0.5-L (1 pt) or 0.5-L aliquot ofcomposite sample.7. Collection of Gross Sample7.1 A collection of gross sample represents a lot or batch ofmaterial and is composed of a number of increments.7.1.1 Collect the increments regularly and systematically, sothat the entire quantity of pi
19、tch sampled will be representedproportionately in the gross sample, and with such frequencythat a gross sample of the required amount will be collected.8. Size of Increments8.1 To collect samples, use a shovel or specially designedtool or mechanical means for taking equal portions or incre-ments. Wh
20、en samples are collected from the surface of loadedshipments, the gross sample shall consist of nine increments ofapproximately equal quantity. When sampling from piles,conveyer belts, and so forth, the gross sample shall consist ofnot less than 25 nor more than 50 increments of approximatelyequal q
21、uantity.9. Protection and Preservation of Samples9.1 Sample containers shall be new or reusable containerswhich can be thoroughly cleaned with a solvent and wiped drywith a clean dry cloth.9.2 Care shall be taken to prevent the sample from becom-ing contaminated. Immediately after filling, hot liqui
22、d samplecontainers shall be positively covered, but not tightly sealed.Containers of solid materials shall be tightly and positivelysealed.9.3 While sampling during inclement weather, attentionshall be paid to prevent water from dropping into the hot liquidsample or samples of solid materials.9.4 Im
23、mediately after filling and sealing, the samplingcontainers shall be properly marked for identification with asuitable pencil on the container itself, not on the lid.10. Apparatus10.1 Sampling Equipment for Liquid Materials:10.1.1 If so equipped, pipe lines and storage tanks may besampled from valve
24、s installed in the lines or up the side of thetanks. A typical tank valve is shown in Fig. 1, and suitable linevalves are illustrated in Fig. 2 and Fig. 3.10.1.2 For sampling tank trucks, a pipe connection withattached sample valve similar to the one shown in Fig. 2 maybe inserted between the outlet
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD429619832004STANDARDPRACTICEFORSAMPLINGPITCH 硬沥青 采样 PDF

链接地址:http://www.mydoc123.com/p-516746.html