1、Designation: A1055/A1055M 08a1Standard Specification forZinc and Epoxy Dual-Coated Steel Reinforcing Bars1This standard is issued under the fixed designation A1055/A1055M; the number immediately following the designation indicates theyear of original adoption or, in the case of revision, the year of
2、 last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTETable 2 was editorially corrected in March 2010.1. Scope1.1 This specification covers deformed and plain steelreinforcing ba
3、rs with a dual coating of zinc alloy and an epoxycoating. The zinc-alloy layer is applied by the thermal spraycoating method (metallizing) followed by an epoxy coatingapplied by the electrostatic spray method.NOTE 1The coating applicator is identified throughout this specifica-tion as the manufactur
4、er.1.2 Requirements of the zinc coating are contained in Table1.1.3 Requirements for fusion-bonded powder coatings arecontained in Annex A1.1.4 Guidelines for construction practices at the job-site arepresented in Appendix X1.1.5 This specification is applicable for orders in eitherinch-pound or SI
5、units.1.6 The values stated in either inch-pound units or SI unitsare to be regarded as standard. Within the text, the SI units areshown in brackets. The values stated in each system are notexact equivalents; therefore, each system must be used inde-pendently of the other, except as specifically not
6、ed in Table 2.Combining values from the two systems may result in noncon-formance with this specification.1.7 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety an
7、d health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2A615/A615M Specification for Deformed and PlainCarbon-Steel Bars for Concrete ReinforcementA706/A706M Specification for Low-Alloy Steel Deformedand Plain Bars for Con
8、crete ReinforcementA775/A775M Specification for Epoxy-Coated Steel Rein-forcing BarsA944 Test Method for Comparing Bond Strength of SteelReinforcing Bars to Concrete Using Beam-End SpecimensA996/A996M Specification for Rail-Steel and Axle-SteelDeformed Bars for Concrete ReinforcementB117 Practice fo
9、r Operating Salt Spray (Fog) ApparatusB833 Specification for Zinc and Zinc Alloy Wire for Ther-mal Spraying (Metallizing) for the Corrosion Protection ofSteelD4060 Test Method for Abrasion Resistance of OrganicCoatings by the Taber AbraserE29 Practice for Using Significant Digits in Test Data toDete
10、rmine Conformance with SpecificationsE527 Practice for Numbering Metals and Alloys in theUnified Numbering System (UNS)G8 Test Methods for Cathodic Disbonding of PipelineCoatingsG14 Test Method for Impact Resistance of Pipeline Coat-ings (Falling Weight Test)G20 Test Method for Chemical Resistance o
11、f PipelineCoatingsG62 Test Methods for Holiday Detection in Pipeline Coat-ings2.2 American Welding Society:3ANSI/AWS A5.33 Specification for Solid and CeramicWires and Ceramic Rods for Thermal SprayingAWS C2.23M/C2.23 Specification for the Application ofThermal Spray Coatings (Metallizing) of Alumin
12、um,Zinc, and Their Alloys and Composites for the CorrosionProtection for SteelAWS C2.25/C2.25M Specification for Thermal SprayFeedstockSolid and Composite Wire and Ceramic Rods2.3 NACE International Standard:4RP-287 Field Measurement of Surface Profile of Abrasive1This specification is under the jur
13、isdiction of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is the direct responsibility of SubcommitteeA01.05 on Steel Reinforcement.Current edition approved Oct. 1, 2008. Published November 2008. Originallyapproved in 2008. Last previous edition approved in 2008 as A1055 08. DO
14、I:10.1520/A1055_A1055M-08A.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Welding S
15、ociety (AWS), 550 NW LeJeune Rd.,Miami, FL 33126, http:/www.aws.org.4Available from National Association of Corrosion Engineers (NACE), 1440South Creek Dr., Houston, TX 77084-4906, http:/www.nace.org.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,
16、 United States.Blast-Cleaned Steel Surface Using a Replica Tape2.4 Society for Protective Coatings Specifications:5SSPC-PA 2 Measurement of Dry Coating Thickness withMagnetic GagesSSPC-SP 10 Near-White Blast CleaningSSPC-VIS 1 Pictorial Surface Preparation standards forPainting Steel Surfaces2.5 Con
17、crete Reinforcing Steel Institute:6Voluntary Certification Program for Fusion Bonded EpoxyCoating Applicator Plants2.6 American Concrete Institute Standard:7ACI 301 Specifications for Structural Concrete3. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 disbonding, nloss of adhes
18、ion between the fusion-bonded powder coating and the zinc-coated steel reinforcingbar.3.1.2 fusion-bonded powder coating, na product contain-ing pigments, thermosetting resins, cross-linking agents, andother additives, which is applied in the form of a powder ontoa clean, heated metallic substrate a
19、nd fused to form a continu-ous barrier coating.3.1.3 holiday, na discontinuity in a coating that is notdiscernible to a person with normal or corrected vision.3.1.4 patching material, na liquid two-part, epoxy coat-ing used to repair damaged or uncoated areas.3.1.5 thermal spray coating (metallizing
20、), na zinc andzinc alloy, or both, wire used in depositing a metallized layerof zinc by thermal spraying (metallizing) using oxy-fuel orelectric-arc thermal spraying which is applied onto a clean,heated metallic substrate to form a continuous coating.3.1.6 wetting agent, na material that lowers the
21、surfacetension of water allowing it to penetrate more effectively intosmall discontinuities in the coating giving a more accurateindication of the holiday count.4. Ordering Information4.1 It shall be the responsibility of the purchaser to specifyall requirements that are necessary for the coated ste
22、el rein-forcing bars under this specification. Such requirements to beconsidered include but are not limited to the following:4.1.1 Reinforcing bar specification and year of issue,4.1.2 Quantity of bars,4.1.3 Size and grade of bars,4.1.4 Requirements for the zinc coating (5.2),4.1.5 Requirements for
23、 the powder coating and provision oftest data (5.3 and 5.4),4.1.6 Requirements for patching material (5.5),4.1.7 Quantity of patching material,4.1.8 Specific requirements for test frequency (9.1),4.1.9 Whether a report on tests performed on the coatedsteel reinforcing bars being furnished is require
24、d (8.4.1 andSection 14),5Available from Society for Protective Coatings (SSPC), 40 24th St., 6th Floor,Pittsburgh, PA 15222-4656, http:/www.sspc.org.6Available from Concrete Reinforcing Steel Institute (CRSI), 933 North PlumGrove Rd., Schaumburg, IL 60173-4767, http:/www.crsi.org.7Available from Ame
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMA1055A1055M2008AE1STANDARDSPECIFICATIONFORZINCANDEPOXYDUALCOATEDSTEELREINFORCINGBARS 环氧双 涂层 钢筋 标准规范

链接地址:http://www.mydoc123.com/p-457377.html