ARMY UFGS-03 11 19 00 10-2012 INSULATING CONCRETE FORMING.pdf
《ARMY UFGS-03 11 19 00 10-2012 INSULATING CONCRETE FORMING.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 11 19 00 10-2012 INSULATING CONCRETE FORMING.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 11 19.00 10 (February 2012)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 11 19.00 10INSULATING CONCRETE FORMING02/12PART 1
2、 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 ICF Manufacturer Qualification1.3.2 Installer Qualification1.3.3 Pre-Installation Meetings1.3.4 Mock-Ups1.4 DELIVERY, STORAGE, AND HANDLING1.5 FIELD/SITE CONDITIONS1.6 SUSTAINABLE DESIGN REQUIREMENTS1.6.1 Local/Regional Materials1.6.2 En
3、vironmental Data1.6.3 Plastic IdentificationPART 2 PRODUCTS2.1 SYSTEM DESCRIPTION2.1.1 Design Requirements2.1.2 Performance Requirements2.2 MANUFACTURED UNITS2.2.1 Description2.2.2 Performance/Design Criteria2.3 MATERIALS2.3.1 Expanded Polystyrene (EPS)2.3.2 Cross Ties and Fastening Strips2.4 ACCESS
4、ORIES2.4.1 Bracing, Scaffolding, and Wall Alignment2.4.2 Door and Window Bucks2.4.3 Waterproofing2.4.4 FastenersPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATIONSECTION 03 11 19.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 INSTALLATIO
5、N3.4 CONCRETE PLACEMENT3.5 FIELD QUALITY CONTROL3.6 CLEANING3.7 PROTECTION- End of Section Table of Contents -SECTION 03 11 19.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 11 19.00 10 (February 2
6、012)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2012*SECTION 03 11 19.00 10INSULATING CONCRETE FORMING02/12*NOTE: This guide specification covers the requirements for Insulating Concrete Forming (ICF).Adhere to UFC 1-300-02
7、 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s
8、) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GE
9、NERAL*NOTE: This guide specification will normally be used in conjunction with the following Sections as applicable to the project:Section 03 15 00.00 10 CONCRETE ACCESSORIESSection 03 20 00.00 10 CONCRETE REINFORCINGSection 03 30 00.00 10 CAST-IN-PLACE CONCRETESection 03 30 00 CAST-IN-PLACE CONCRET
10、E ICFs are used as stay-in-place forms for structural concrete, load-bearing and nonload-bearing walls, below grade and above grade walls. The forms remain in place after placement and curing of concrete and must be protected by approved interior and exterior finish materials.*SECTION 03 11 19.00 10
11、 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and liste
12、d in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to up
13、date the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The public
14、ations are referred to within the text by the basic designation only.AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)ACI 117 (2010) Specifications for Tolerances for Concrete Construction and Materials and CommentaryACI 301 (2010) Specifications for Structural ConcreteACI 305R (2010) Specification fo
15、r Hot Weather ConcretingACI 306R (2010) Cold Weather ConcretingACI 318 (2011; Errata 2011) Building Code Requirements for Structural Concrete and CommentaryACI 347 (2004; Errata 2008) Guide to Formwork for ConcreteASTM INTERNATIONAL (ASTM)ASTM C177 (2010) Standard Test Method for Steady-State Heat F
16、lux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate ApparatusASTM C203 (2005a) Breaking Load and Flexural Properties of Block-Type Thermal InsulationASTM C518 (2010) Steady-State Thermal Transmission SECTION 03 11 19.00 10 Page 4Provided by IHSNot for ResaleNo repr
17、oduction or networking permitted without license from IHS-,-,-Properties by Means of the Heat Flow Meter ApparatusASTM C578 (2011a) Standard Specification for Rigid, Cellular Polystyrene Thermal InsulationASTM D1621 (2010) Compressive Properties of Rigid Cellular PlasticsASTM D1622 (2008) Apparent D
18、ensity of Rigid Cellular PlasticsASTM D1761 (2006) Standard Test Methods for Mechanical Fasteners in WoodASTM D1972 (1997; R 2005) Standard Practice for Generic Marking of Plastic ProductsASTM E119 (2011a) Standard Test Methods for Fire Tests of Building Construction and MaterialsASTM E2129 (2010) S
19、tandard Practice for Data Collection for Sustainability Assessment of Building ProductsASTM E2634 (2011) Standard Specification for Flat Wall Insulating Concrete Form (ICF) SystemsASTM E84 (2011b) Standard Test Method for Surface Burning Characteristics of Building MaterialsASTM E90 (2009) Standard
20、Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and ElementsU.S. GREEN BUILDING COUNCIL (USGBC)LEED (2002; R 2005) Leadership in Energy and Environmental Design(tm) Green Building Rating System for New Construction (LEED-NC)1.2 SUBMITTALS*NOTE: Revie
21、w submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or cri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS03111900102012INSULATINGCONCRETEFORMINGPDF

链接地址:http://www.mydoc123.com/p-449541.html