ARMY UFGS-03 11 13 00 10-2010 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING.pdf
《ARMY UFGS-03 11 13 00 10-2010 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-03 11 13 00 10-2010 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 11 13.00 10 (August 2010)-Preparing Activity: USACE SupersedingUFGS-03 11 13.00 10 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 11 13.00 10STRUC
2、TURAL CAST-IN-PLACE CONCRETE FORMING08/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 FORM MATERIALS2.1.1 Forms For Class A Finish2.1.2 Forms For Class B Finish2.1.3 Forms For Class C Finish2.1.4 Forms For
3、Class D Finish2.1.5 Retain-In-Place Metal Forms2.1.6 Pan-Form Units2.1.7 Form Ties2.1.8 Form Releasing Agents2.1.9 Fiber Voids2.2 FIBER VOID RETAINERS2.2.1 Polystyrene Rigid Insulation2.2.2 Precast ConcretePART 3 EXECUTION3.1 INSTALLATION3.1.1 Formwork3.1.2 Fiber Voids3.1.3 Fiber Void Retainers3.2 C
4、HAMFERING3.3 COATING3.4 FORM REMOVAL3.4.1 Formwork Not Supporting Weight of Concrete3.4.2 Formwork Supporting Weight of Concrete3.4.3 Tunnel FormsSECTION 03 11 13.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5 INSPECTION- End of Sect
5、ion Table of Contents -SECTION 03 11 13.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-03 11 13.00 10 (August 2010)-Preparing Activity: USACE SupersedingUFGS-03 11 13.00 10 (May 2009)UNIFIED FACILITIE
6、S GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 03 11 13.00 10STRUCTURAL CAST-IN-PLACE CONCRETE FORMING08/10*NOTE: This guide specification covers the requirements for formwork for cast-in-place concrete and will be used with Section 03 31 00.00 10 CAST-IN-PLACE S
7、TRUCTURAL CONCRETE or Section 03 31 01.00 10 CAST-IN-PLACE CONCRETE FOR CIVIL WORKS. Formwork for architectural cast-in-place concrete is specified in Section 03 33 00 CAST-IN-PLACE ARCHITECTURAL CONCRETE.Edit this guide specification for project specific requirements by adding, deleting, or revisin
8、g text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technic
9、al proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to l
10、ist the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.SECTION 03 11 13.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking
11、 permitted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.Refer
12、ences not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to wit
13、hin the text by the basic designation only.ACI INTERNATIONAL (ACI)ACI 347 (2004) Guide to Formwork for ConcreteAMERICAN HARDBOARD ASSOCIATION (AHA)AHA A135.4 (1995; R 2004) Basic HardboardAPA - THE ENGINEERED WOOD ASSOCIATION (APA)APA PS 1 (1995) Voluntary Product Standard for Construction and Indus
14、trial PlywoodASTM INTERNATIONAL (ASTM)ASTM C 1074 (2004) Standard Practice for Estimating Concrete Strength by the Maturity MethodASTM C 1077 (2009b) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory EvaluationASTM C 31/C
15、31M (2009) Standard Practice for Making and Curing Concrete Test Specimens in the FieldASTM C 39/C 39M (2009a) Standard Test Method for Compressive Strength of Cylindrical Concrete SpecimensASTM C 578 (2009e1) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation1.2 SYSTEM DESCRI
16、PTIONThe design, engineering, and construction of the formwork is the responsibility of the Contractor. Design formwork in accordance with methodology of ACI 347 for anticipated loads, lateral pressures, and stresses, and capable of withstanding the pressures resulting from placement and vibration o
17、f concrete. Comply with the tolerances specified in Section 03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE 03 70 00 MASS CONCRETE 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE, paragraph SECTION 03 11 13.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
18、se from IHS-,-,-CONSTRUCTION TOLERANCES. However, for surfaces with an ACI Class A surface designation, limit the allowable deflection for facing material between studs, for studs between walers and walers between bracing to 0.0025 times the span. Design the formwork as a complete system with consid
19、eration given to the effects of cementitious materials and mixture additives such as fly ash, cement type, plasticizers, accelerators, retarders, air entrainment, and others. Monitor the adequacy of formwork design and construction prior to and during concrete placement as part of the Contractors ap
20、proved Quality Control Plan. Submit design analysis and calculations for form design and methodology used in the design. At least _ days either before fabrication on site or before delivery of prefabricated forms.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00
21、SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are alr
22、eady marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS03111300102010STRUCTURALCASTINPLACECONCRETEFORMINGPDF

链接地址:http://www.mydoc123.com/p-449540.html