1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 01 32 (November 2009)-Preparing Activity: USACE SupersedingUFGS-03 01 32 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated October 2009*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 01 32CONCRETE REHABILI
2、TATION FOR CIVIL WORKS11/09PART 1 GENERAL1.1 RELATED SECTIONS1.1.1 Formwork1.1.2 Reinforcing Steel1.1.3 Field-Molded Sealants1.1.4 Compression Seals1.1.5 Concrete1.1.6 Shotcrete1.1.7 Preplaced-Aggregate Concrete1.1.8 Precast Concrete1.1.9 Disposal of Waste Materials1.2 UNIT PRICES1.2.1 Concrete Remo
3、val1.2.1.1 Payment1.2.1.2 Measurement1.2.1.3 Unit of Measure1.2.2 Concrete Removal (Alternate)1.2.2.1 Payment1.2.2.2 Measurement1.2.2.3 Unit of Measure1.2.3 Drilling and Grouting Dowels and Anchors1.2.3.1 Payment1.2.3.2 Measurement1.2.3.3 Unit of Measure1.2.4 Dowels and Anchors1.2.5 Concrete1.2.5.1
4、Payment1.2.5.2 Measurement1.2.5.3 Unit of Measure1.2.6 Mortar1.2.6.1 Payment1.2.6.2 Measurement1.2.6.3 Unit of Measure1.2.7 Grout1.2.7.1 PaymentSECTION 03 01 32 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2.7.2 Measurement1.2.7.3 Unit of
5、Measure1.2.8 Precast Concrete Units1.2.8.1 Payment1.2.8.2 Measurement1.2.8.3 Unit of Measure1.2.9 Overlays1.2.9.1 Payment1.2.9.2 Measurement1.2.9.3 Unit of Measure1.2.10 Crack Injection1.2.10.1 Payment1.2.10.2 Measurement1.2.10.3 Unit of Measure1.2.11 Crack or Joint Sealing1.2.12 Notch and Seal Crac
6、k Filling1.2.12.1 Payment1.2.12.2 Measurement1.2.12.3 Unit of Measure1.2.13 Mechanical Anchoring of Cracks1.2.13.1 Payment1.2.13.2 Unit of Measure1.2.14 Crack Stitching1.2.14.1 Payment1.2.14.2 Measurement1.2.14.3 Unit of Measure1.2.15 Drilling and Plugging Cracks1.2.15.1 Payment1.2.15.2 Measurement1
7、.2.15.3 Unit of Measure1.2.16 Gravity Crack Filling1.2.16.1 Payment1.2.16.2 Measurement1.2.16.3 Unit of Measure1.2.17 Measurement Procedures1.2.17.1 Concrete Removal1.2.17.2 Measurement of Vertical Concrete Removal1.2.17.3 Measurement of Horizontal Concrete Removal1.2.17.4 Measurements of Concrete1.
8、3 REFERENCES1.4 DEFINITIONS1.4.1 Concrete1.4.2 Mortar1.4.3 Grout1.4.4 Cement-Based Material1.4.5 Polymer-Modifier1.4.6 Polymer-Modified Material1.4.7 Epoxy Resin Binder1.4.8 Epoxy Concrete1.4.9 Epoxy Mortar1.4.10 Non-Pressure Epoxy Grout1.4.11 Epoxy Injection Adhesive1.4.12 Rapid-Hardening Repair Ma
9、terial1.4.13 Non-Structural Cracks1.4.14 Structural Cracks1.5 SYSTEM DESCRIPTION1.5.1 Design Requirements1.5.2 Repair Material Performance Requirements1.6 SUBMITTALSSECTION 03 01 32 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.7 QUALITY AS
10、SURANCE1.7.1 Qualifications1.7.1.1 Contractor Qualifications1.7.1.2 Worker Qualifications1.7.1.3 Blasting Personnel Qualifications1.7.1.4 Quality Control Personnel Qualifications1.7.2 Regulatory Requirements1.7.3 Pre-Construction Conference1.7.4 Repair Material Mixture Proportioning1.7.5 Test Report
11、s1.7.5.1 Epoxy Resin Binder1.7.5.2 Epoxy Resin Grout1.7.5.3 Cement-Based Concrete and Cement-Based Mortar1.7.5.4 Polymer-Modified Concrete and Polymer-Modified Mortar1.7.6 Field Samples1.7.6.1 Concrete Removal1.7.6.2 Joint and Crack Sealing1.7.6.3 Precast Unit Assembly Test1.7.6.4 Sample Repair Pane
12、ls1.8 DELIVERY, STORAGE, AND HANDLING1.8.1 Packing, Shipping, Handling, and Unloading1.8.2 Epoxy-Resin Materials1.8.3 Polymer Materials1.8.4 Chemical Admixtures1.8.5 Waste Management and Disposal1.9 PROJECT/SITE CONDITIONS1.9.1 Environmental Requirements1.9.2 Existing Conditions1.9.2.1 Concrete Test
13、 Data1.9.2.2 Concrete Core(s)1.9.2.3 Embedded Materials1.10 SEQUENCING AND SCHEDULINGPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cement-Based Materials2.1.1.1 Rapid-Hardening Repair Material2.1.1.2 Ultra-fine Cement2.1.2 Admixtures2.1.3 Aggregate2.1.4 Water2.1.5 Fiber Reinforcement2.1.6 Polymer Materials2.1.6
14、.1 Polymer Modifier for Concrete or Mortar2.1.6.2 Polyurethane Injection Adhesive2.1.6.3 Polyester Resin Grout2.1.6.4 Latex Bonding Compound2.1.6.5 High Molecular Weight Methacrylate (HMWM) Sealer2.1.7 Epoxy Resin Materials2.1.7.1 Epoxy Resin Binder for Concrete and Mortar2.1.7.2 Non-Pressure Epoxy
15、Grout2.1.7.3 Epoxy Injection Adhesive2.1.7.4 Crack Surface Sealer for Injection Grouting2.1.7.5 Epoxy Bonding Agent2.1.8 Bond Breaker2.1.9 Field-Molded Sealants and Primer2.1.10 High-Strength Steel Bars2.1.11 Compression Seals and LubricantSECTION 03 01 32 Page 3Provided by IHSNot for ResaleNo repro
16、duction or networking permitted without license from IHS-,-,-2.1.12 Epoxy-Coated Steel Bars2.1.13 Anchors2.1.14 Dowels2.1.15 Anchor Head2.1.16 Mechanical Anchors2.2 EQUIPMENT2.2.1 Cement-Based Concrete Mixing Equipment2.2.2 Polymer-Modified Concrete Mixing Equipment2.2.3 Epoxy Mixing Equipment2.2.4
17、Grout Mixing Equipment2.2.5 Joint and Crack Cleaning and Sealing Equipment2.2.6 Drilling Equipment2.2.7 Vehicle-Mounted Breakers2.2.8 Hand-Held Breaker2.2.9 Hydromilling Equipment2.2.10 Rotary Milling Equipment2.2.10.1 Horizontal Surfaces2.2.10.2 Vertical Surfaces2.3 ACCESSORIES2.3.1 Stitching stapl
18、es2.3.2 Neoprene Bearing Pads for Precast Units2.3.3 Plastic Shims2.3.4 Expansion Joint Filler Strips, Premolded2.4 MIXTURE PROPORTIONING2.4.1 Cement-Based Concrete2.4.2 Fiber-Reinforced Concrete2.4.3 Dry-Pack Mortar2.4.4 Polymer-Modified Mortar2.4.5 Polymer-Modified Concrete2.4.6 Precast Concrete U
19、nits2.4.7 Cement-Based Grout2.4.8 Ultra-fine Cement GroutPART 3 EXECUTION3.1 PROTECTION3.1.1 Protection of Existing Features3.1.2 Protection of Personnel3.2 REMOVAL OF EXISTING CONCRETE3.2.1 General3.2.1.1 Determination of Removal Limits3.2.1.2 Perimeter Saw Cut3.2.1.3 Preliminary Surface Cleaning3.
20、2.1.4 Reinforcing Steel3.2.1.5 Shallow Repairs3.2.2 Cutting3.2.2.1 General3.2.2.2 Abrasive-Water-Jet Cutting3.2.2.3 Diamond-Blade Cutting3.2.2.4 Diamond-Wire Cutting3.2.2.5 Stitch Drilling3.2.3 Impacting3.2.3.1 Vehicle-Mounted Breaker3.2.3.2 Hand-Held Breaker3.2.4 Milling3.2.4.1 Hydromilling3.2.4.2
21、Rotary Head Milling3.2.5 Presplitting3.2.5.1 Expansive AgentsSECTION 03 01 32 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.5.2 Mechanical Presplitting3.2.6 Controlled Blasting3.2.6.1 General3.2.6.2 Safety3.2.6.3 Procedure3.2.6.4 Preblast
22、ing and Postblasting Inspections3.2.6.5 Vibration Monitoring3.3 ANCHORING AND REINFORCING3.3.1 Drilling and Grouting Dowels and Anchors3.3.2 Drilling and Installing Mechanical Anchors3.3.3 Installating Reinforcement3.4 MIXING MATERIALS3.5 SURFACE PREPARATION3.5.1 General3.5.2 Cleaning3.5.3 Waste Wat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0301322009CONCRETEREHABILITATIONFORCIVILWORKS 土建 工程 混凝土 复原 PDF

链接地址:http://www.mydoc123.com/p-449539.html