ARMY UFGS-02 56 14-2010 CLAY BARRIER LAYER《粘土障碍层》.pdf
《ARMY UFGS-02 56 14-2010 CLAY BARRIER LAYER《粘土障碍层》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 56 14-2010 CLAY BARRIER LAYER《粘土障碍层》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 56 14 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 56 14 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 56 14CLAY BA
2、RRIER LAYER02/10PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SUBMITTAL REQUIREMENTS1.4 SUBMITTALSPART 2 PRODUCTS2.1 CLAY2.2 EQUIPMENT2.2.1 Compaction Equipment2.2.2 Scarification Equipment2.2.3 Steel Wheeled Rollers2.2.4 Hand Operated TampersPART 3 EXECUTION3.1 BORROW SOURCE ASSESSMENT3.1.1 Classi
3、fication Testing3.1.2 Compaction Testing3.1.3 Hydraulic Conductivity Testing3.1.4 Acceptable Zone Development3.1.5 Chemical Contamination Testing3.1.6 Commercial Testing Laboratory3.2 INSTALLATION3.2.1 Clay Placement3.2.2 Moisture Control3.2.3 Compaction3.2.4 Scarification3.2.5 Repair of Voids3.3 CO
4、NSTRUCTION TOLERANCES3.4 CONSTRUCTION TESTS3.4.1 Clay Material Tests3.4.2 Moisture Content and Density Tests of Clay3.4.2.1 Rapid TestsSECTION 02 56 14 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.2.2 Nuclear Density and Moisture Content
5、 Tests3.4.2.3 Test Results3.4.3 Hydraulic Conductivity Tests of Clay3.4.4 Quality Assurance Samples3.5 PROTECTION3.5.1 Moisture Content3.5.2 Erosion3.5.3 Freezing and Desiccation3.5.4 Retests- End of Section Table of Contents -SECTION 02 56 14 Page 2Provided by IHSNot for ResaleNo reproduction or ne
6、tworking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-02 56 14 (February 2010)-Preparing Activity: USACE SupersedingUFGS-02 56 14 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 02 56 14CLAY BARRIER LAYE
7、R02/10*NOTE: This guide specification covers the requirements for construction of a clay barrier layer to isolate contaminated material from the environment.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable i
8、tems(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of
9、technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: Delete this paragraph when work is covered by a lump-sum contract price. W
10、eight measurement may be used to supplement volume measurement surveys if significant subgrade settlement (landfill cover applications) is anticipated.*Measurement and payment for the clay barrier layer shall be based on the unit price schedule for each cubic m cubic yard of clay in place. This unit
11、 price shall include the cost for development of the clay borrow source, cost of clay, excavation, hauling, equipment, placement, testing, SECTION 02 56 14 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-and other incidental work required to co
12、nstruct the clay barrier layer.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the
13、Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be
14、 deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM
15、INTERNATIONAL (ASTM)ASTM D 1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) SieveASTM D 1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone MethodASTM D 1557 (2009) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using M
16、odified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)ASTM D 1587 (2008) Thin-Walled Tube Sampling of Soils for Geotechnical PurposesASTM D 2167 (2008) Density and Unit Weight of Soil in Place by the Rubber Balloon MethodASTM D 2216 (2005) Laboratory Determination of Water (Moisture) Content of Soil and
17、Rock by MassASTM D 2488 (2009a) Description and Identification of Soils (Visual-Manual Procedure)ASTM D 3740 (2008) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and ConstructionSECTION 02 56 14 Page 4Provided by IHSNot for
18、ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM D 422 (1963; R 2007) Particle-Size Analysis of SoilsASTM D 4220 (1995; R 2007) Preserving and Transporting Soil SamplesASTM D 4318 (2005) Liquid Limit, Plastic Limit, and Plasticity Index of SoilsASTM D 5084 (2003) Measu
19、rement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall PermeameterASTM D 6938 (2008a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)ASTM D 698 (2007e1) Laboratory Compaction Characteristics of So
20、il Using Standard Effort (12,400 ft-lbf/cu. ft. (600 kN-m/cu. m.)1.3 SUBMITTAL REQUIREMENTSSubmit Materials Handling Plan describing the following: processing and placement of the clay; type, model number, weight and critical dimensions of equipment to be used for soil processing, compaction, scarif
21、ication, and smooth rolling; method of protecting clay from changes in moisture content and freezing after placement. The following shall also be submitted:a. Borrow Source Assessment Report at least 15 _ days prior to clay placement. No clay shall be placed until the Borrow Source Assessment Report
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0256142010CLAYBARRIERLAYER 粘土 障碍 PDF

链接地址:http://www.mydoc123.com/p-449528.html