《ARMY UFGS-02 01 50-2010 OPERATION MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS《土壤蒸汽提取(SVE)系统操作 维护和程序监控》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-02 01 50-2010 OPERATION MAINTENANCE AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS《土壤蒸汽提取(SVE)系统操作 维护和程序监控》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-02 01 50 (May 2010)-Preparing Activity: USACE SupersedingUFGS-02 01 50 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 02 - EXISTING CONDITIONSSECTION 02 01 50OPERATION, M
2、AINTENANCE, AND PROCESS MONITORING FOR SOIL VAPOR EXTRACTION(SVE) SYSTEMS05/10PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT1.1.1 Unit Pricing1.1.2 Training1.1.3 Disposal and Replacement of Vapor Phase Activated Carbon1.1.4 Pneumatic Flow Meter Testing1.1.5 Completion Testing1.2 REFERENCES1.3 PROJECT DES
3、CRIPTION1.3.1 Chemical Testing1.3.2 Assistance in Preparing O these costs are typically covered by Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL. Unit pricing should also be considered for replacement of granular activated carbon (GAC), if GAC vapor stream treatment will be required.These par
4、agraphs should be coordinated with Sections 43 13 13.13 VAPOR PHASE ACTIVATED CARBON ADSORPTION UNITS, 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL, and 43 11 00 FANS/BLOWERS/PUMPS; OFF-GAS.The bid sheet should include separate, optional items for tasks such as: training, pneumatic flow meter testin
5、g, and completion testing.*Measurement shall be based on completion of contract requirements. Payment will be at the respective contract prices in the bidding schedule.SECTION 02 01 50 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1 Unit
6、Pricing*NOTE: Incentives for the Contractor to complete remedial action in a timely manner should be incorporated into the pricing structure, if possible. Unit pricing alternatives for payment include: hours of operation, volume of air extracted, and mass of contaminants removed.Although pricing by
7、mass of contaminants removed creates incentive, mass of contaminants removed is more difficult to accurately measure than time or air volumes. Also there is typically a high degree of uncertainty in predicting mass removal rates, which will make it difficult for bidders to assign reasonable prices w
8、hen preparing bids.Another performance based payment option is to make periodic payments to the Contractor based on the degree of reduction in contaminant levels. For example, partial payment to the Contractor is made based on the percentage reduction in contaminant levels. However this type of paym
9、ent scheme should be used with caution, since removal rates typically decrease as contaminant levels decrease; e.g., it may take 3 times as long to go from 25 to 10 mg/kg as it takes to go from 100 to 25 mg/kg.Lump sum pricing, with performance requirements (see paragraph Operation of the SVE System
10、), is generally recommended for Operations, Maintenance and Process Monitoring. Under this pricing structure, the Contractor receives periodic payments (e.g., monthly) so long as performance requirements are being met. If performance requirements are not met, then the Contracting Officer may withhol
11、d payment until the Contractor demonstrates that performance requirements are being met.If it is expected that large volumes of condensate will be generated, and that treatment or offsite disposal will be required; then a separate paragraph should be added to cover treatment and disposal of condensa
12、te. A unit pricing structure would be appropriate to pay for treatment or offsite disposal of condensate.*Compensation shall be a lump sum price for Operation of the SVE System, Maintenance, and Process Monitoring. Costs for Contaminated Material Storage and Disposal shall also be included in this p
13、rice. Costs for replacement adsorption media for the vapor stream treatment system is covered under a separate paragraph and is not included in this price. Physical and chemical testing performed in the field, and sampling shall be included in this price. Costs for laboratory analysis of samples is
14、covered in Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL and is not included in this price.SECTION 02 01 50 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.2 Training*NOTE: If it is expected that close out of the site will be complet
15、ed within the period of the contract, then Training should be listed as an optional item on the bid sheet.*Compensation shall be a lump sum price for Training.1.1.3 Disposal and Replacement of Vapor Phase Activated Carbon*NOTE: This paragraph should be deleted if any of the following conditions appl
16、y: vapor steam treatment will not be required; the vapor stream treatment system does not use activated carbon; or payment for activated carbon is covered under a separate Section. *Compensation for disposal of spent vapor phase activated carbon shall be by the contract unit price schedule for each
17、_ kg pound, based on the dry weight of the spent activated carbon _. Compensation for replacement of spent vapor phase activated carbon shall be by the contract unit price schedule for each _kg pound, based on invoices from the supplier of the replacement activated carbon _.1.1.4 Pneumatic Flow Mete
18、r Testing*NOTE: This paragraph should be deleted if pneumatic flow meter testing will not be required. If this paragraph is retained, the bid sheet should include a separate, optional item for pneumatic flow meter testing.*Compensation for pneumatic flow meter testing shall be by the contract unit p
19、rice schedule on a per well basis. Physical and chemical testing performed in the field, and sampling shall be included in this price. Costs for laboratory analysis of samples is covered in Section 01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL, and is not included in this price.1.1.5 Completion Testi
20、ng*NOTE: Completion testing is defined as testing that is performed determine if regulatory requirements have been met, so that the SVE system can be permanently shut down.This paragraph should be deleted if completion testing will not be included in the contract. If this paragraph is retained, the
21、bid sheet should include a separate, optional item for completion testing.SECTION 02 01 50 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*Compensation shall be a lump sum price for Completion Testing. Physical and chemical testing performed i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS0201502010OPERATIONMAINTENANCEANDPROCESSMONITORINGFORSOILVAPOREXTRACTIONSVESYSTEMS 土壤 蒸汽 提取 SVE

链接地址:http://www.mydoc123.com/p-449515.html