ARMY MIL-P-60628-1966 PROJECTILE 152MM SLUG PROOFING METAL PARTS ASSEMBLY《152 mm防撞弹用金属部件的组装》.pdf
《ARMY MIL-P-60628-1966 PROJECTILE 152MM SLUG PROOFING METAL PARTS ASSEMBLY《152 mm防撞弹用金属部件的组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60628-1966 PROJECTILE 152MM SLUG PROOFING METAL PARTS ASSEMBLY《152 mm防撞弹用金属部件的组装》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 1. SCOPE MILITARY SPECIFICATION Projectile, l52MM, Slug, Proofing Metal Parts Assembly MIL-P-O(MJ) 30 November i966 1.1 Th,s specification is the applicable detai- specification for Projectile l52MM, Slug, Proofing, Metal Pasts Assembly. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the is
2、sue in effect on date of invitation for bids or request for proposal, farm a part of this specification to the exbent specified herein. SPECIFLCATIONS Military MIL-A-2550 - Ammunition and Special Weapons, General MIL- P- 10025 MIL-R-11073 Specification for Inert Ammunition Components, General Specif
3、ication for - PackZng and Marking for Domestic Shipment of - Rotating Band Blanks, Sintered Iron STANDARDS Federal Federal Test Method Standard No. 151 - Metal; Test Methods Military MIL-STD-105 . - Sampling Procedures and Tables for Inspection by MIL-STD-109 MIL-STD-129 MIL-STD-639 MIL-STD-1235 Att
4、ributes - Quality Assurance Terms and Definitions - Masking for Shipment and Storage - Surface Roughness Values Preferred for Army Ordnance Material - Single and Multilevel Continuous Sampling Psocedures and Tables for Inspection by Attributes ;HIS DWUMENT CONTAINS id PAGES. - - - Provided by IHSNot
5、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60628 13 9777706 03L)0196 5 = MIL-P-o (MU) DPAWINGS Munitions Command - Projectile 152MM, Slug-Proofing Metal Parts Assembly - Pallet for Fixed and Semi-fixed Projectiles - Inspection Equipment List for Projectile
6、15m, Slug-Proofing Metal Parts Assembly Fi0535958 F-8889328 IEL-10535958 (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.)
7、3. REQUIRFMENTS 3.1 General.- Materials, parts and assemblies shall comply with the requirements specified on the applicable drawings, referenced specifications and the following: 3.2 First article sample.- Requirements for submission of first article sample by the contractor shall be as specified i
8、n the contract. 3.3 Heat treatment or stress relief of Projectile Body.- The heat treatment or stress relief applied shall be uniform throughout each lot of components and shall be so conducted as to produce in any component the mechanical properties specified on the applicable drawings. 3.3.1 Hot f
9、orged-heat treat method of manufacture (if applicable). - Projectile body forgings manufactured by this method shall be subjected to heat treatment to attain required mechanical properties. forgings shall consist of heating above the critical temperature, not to exceed i600 degrees Fahrenheit (F), f
10、ollowed by an oil quench. piece shall be tempered without delay at a temperature above TOO degrees F., suitable to produce required mechanical properties. furnace, the projectile forging to a temperature of not more than TOO degrees F., after which cooling may be accelerated by water spray or simila
11、r means. The heat treatment of After quenching, the After removal from tempering shall be slowly cooled in air (forced air permitted) 3.3.2 Cold shaping method of manufacture (if applicable).- Cold shaping of projectile bodies shall be so accomplished as to produce the mechanical properties specifie
12、d. TOO degrees F., minimum, following the final forming operation during which time plastic flow takes place. The minimum soak time at or above minimum temperature shall be established which will produce mechanical properties specified by the applicable drawing. The projectile body shall be stress r
13、elieved at a temperature of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60628 13 m 7797706 0340177 7 m MIL- P- 60628 (MU) 3.4 Band seat.- Prior to application of rotating band blank, the band seat of the body shall be clean and free of oi
14、l, grease, dirt, rust, and other foreign matter. band seat after knurling. Shot or sandblasting shall not be permitted for cleaning the 3.5 Protective coating.- Protective coating shall be in accordance with the applicable drawings and the specifications referenced thereon. 3.6 Workmanship.- The req
15、uirements for workmanship are as specified on the applicable drawings, referenced specifications and the following: 3.6.1 Metal defects.- All components shall be free from cracks, splits, seams, laps, cold shuts, inclusions or any similar defect. 3.6.2 - Burr.- No component shall have a burr which m
16、ight interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.6.3 Foreign matter.- All parts and assemblies shall be free of chips, dirt, grease, oil, rust or other foreign matter. 4. QUALITY ASSURANCE PROvSIONS 4-1 Responsibility for inspecti
17、on. - Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government
18、. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.1.1 Quality Assurance terms and definitions. - Reference shall be made to MIL-STD-109
19、 to define terms used. 4.1.2 4.2 First article smmle. Inspection.- Inspection shall be in accordance with MIL-A-2550. 3 _- :Ar =. - .- . E *. .c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60628 13 m 7777706 034019 7 M m-p-60628 (MU) 4.2.1
20、Initial production sample.- At the beginning of regular production, a sample shall be submitted in accordance with contract requirements and shall consist of i5 slug proofing metal parts assemblies as follows: 5 Slug proofing metal parts assemblies, complete, including paint 5 Slug proofing metal pa
21、rts assemblies, complete, except paint 7 each bodies, prior to banding, including rotating seat 5 each rotating band blanks The sample shall be manufactured in the same manner, using the same materials, equipment, processes and procedures as will be used in regular production. parts and materials, i
22、ncluding packaging and packing shall be the same as used in regular production and shall be obtained from the same source of supply. at source, the sample shall be inspected for all the requirements of the drawings and specifications at a Government laboratory or such other facility specified in the
23、 contract. All 4.2.1.1 Examination and test. - After inspecti on and provisional acceptance 4.2.1.2 Initial production sample failure.- Failure of the sample to comply with the requirements of the drawings and specifications shall result in sample disapproval, 4.3 inspection provisions. 4.3.1 - Lot.
24、 4.3.1.1 Submission of product.- The product shall be submitted in accordance with MIL-STD-105 or MIL-STD-1235, as applicable. 4.3.1.2 Forging lots.- Forging lots shall contain bodies from not more 4.3.1.3. Cold shaping lots. - Cold shaping lots shall contain bodies from 4.3.1.4 Heat treatment lots.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP606281966PROJECTILE152MMSLUGPROOFINGMETALPARTSASSEMBLY152MM 防撞弹用 金属 部件 组装 PDF

链接地址:http://www.mydoc123.com/p-446688.html