ARMY MIL-C-71133 (2)-1998 CARTRIDGE IGNITION M985 LOADING ASSEMBLING AND PACKING《M985点火炮弹的装载 组装及包装》.pdf
《ARMY MIL-C-71133 (2)-1998 CARTRIDGE IGNITION M985 LOADING ASSEMBLING AND PACKING《M985点火炮弹的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-71133 (2)-1998 CARTRIDGE IGNITION M985 LOADING ASSEMBLING AND PACKING《M985点火炮弹的装载 组装及包装》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、I I I 1 INCH-POTJND MIL-(2-71133 (AR) AMENDMENT 2 05 JUNE 1998 SUPERSEDING AMENDMENT 1 05 DECEMBER 1995 MILITARY SPECIFICATION CARTRIDGE, IGNITION, M985 LOADING, ASSEMBLING AND PACKING This amendment forms a part of MIL-C-71133 (AR), dated Armament Research, Development and Engineering Center, and i
2、s available for use by all Departments and Agencies of the Department of Defense. . 26 May 1992, and is approved for use by the U.S. Army PAGE 2 Delete: “INSPECTION EQUIPMENT DRAWINGS 9278622 - Envelope Drawing for Leak Testing of Ignition Cartridges“. PAGE 3 3.4.1, line 2: Delete: “8.85“ and substi
3、cute: tll.OOtt. 3.4.2, at end of sentence: Delete: “4.5.2.2“ and substitute: “4.5.2.1“ . 3.5: Delete in its entirety. PAGE 4 3.8: Delete in its entirety. 1 of 6 AMSC N/A FSC 1315 DISTFUBDTION STATEMEWT A. Approved for public release; distribution is mimited. Provided by IHSNot for ResaleNo reproduct
4、ion or networking permitted without license from IHS-,-,-MIL-C-71133 (AR) AMENDMENT 2 PAGE 7 TABLE I: Delete: “Static pressure (b) . 25 . 3.8 . 4.5.7“. PAGE 8 TABLE I, under Shell, Shotgun, Primed, 12 Gauge Assy.: Delete: “Sensitivity test . 20 (a) . 3.4.1/3.4.2 . 4.5.2“ and substitute: “Sensitivity
5、 test . 700 (a) . 3.4.1/3.4.2 . 4.5.2“. Delete: “Cartridge, Ignition, xM985 Assembly“ and substitute: “Cartridge, Ignition, M985 Assembly“. Delete “Leak test . 50 (b) . 3.5 . 4.5.3“. NOTES: Delete Note (a) in its entirety andsubstitute: “(a) Primers for the first article and be from the intended fir
6、st production lot and thereby negating the necessity of testing the primers from that production lot.“ PAGE 12 4.4.2.1, Critical 1: Delete in its entirety. Add Major 105 as follows: “105 Sensitivity non-function . (a) . 3.4.1 . . . Test/4.5.2“. PAGE 14 4.4.2.3, Major 104: Delete in its entirety. 2 P
7、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - MIL-C-3LL33 (2) 999990b 2073bLL b84 8 I MIL-C-71133 (AR) AMENDMENT 2 PAGE 16 4.4.3.2.1: Delete in its entirety and substitute: “4.4.3.2.1 Sensitivity test. Beginning with the first article (primers fo
8、r the first article can be from the intended first production lot, thereby negating the necessity of testing the primers from the first production lot), and from the first production lot produced, and continuing until three (3) consecutive lots have complied with 3.4.1 and 3.4.2, a sample of 700 pri
9、mers shall be selected and be subjected to this test. If the sum of the average critical height (H average) and five (5) times the .standard deviation(s) multiplied by the weight of the ball exceeds the maximum requirement, or if the sum of the average critical height (H average) less two (2)times t
10、he . standard deviation(s) multiplied by the weight of the ball exceeds the minimum requirement, the inspection lot shall be rejected. I 4.4.3.2.1.1: Delete in its entirety. PAGE 17 4.4.3.2.2: Delete in its entirety. 4.4.3.2.2.1: Delete in its entirety. PAGE 18 4.4.3.5: Delete in its entirety. PAGE
11、19 4.5.2.1: Delete in its entirety and substitute: “4.5.2.1 Sensitivity test. The sample of 700 primers shall be divided into 14 groups of 50 primers each and tested in the following manner: The first group (50) of primers shall be tested by dropping a steel ball 15/16 inch in diameter and weighing
12、1.94 + ounces on the firing pin of the test fixture from a height of nine (9) inches. (The height of drop shall be measured as the height from the top of the firing pin to the bottom of the ball.) The primers that fire, misfire, hangfire, or squib shall be recorded. successively increasing heights o
13、f one (1) inch, using a new group of 50 primers at each different height, until a height is reached at which all primers in the group being tested fire. .O2 This procedure shall be repeated at 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-C-7
14、LL33 (2) W 9999906 2033bL2 SI0 e MIL-C-71133 (AR) AMENDMENT 2 PAGE 19 (cont) The test fixture shall then be set to a height of eight (8) inches and the above procedure repeated at successively decreasing heights of one (1) inch, using a new group of 50 primers at each different height, until a heigh
15、t is reached at which all primers in the group being tested fail to fire. Acceptance or rejection of the lot shall be determined from calculations based on recorded data. The recorded test data shall be used in the calculation of “H average“ and ls“ as follows: H average = A plus B plus C S = I time
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC7113321998CARTRIDGEIGNITIONM985LOADINGASSEMBLINGANDPACKINGM985 点火 炮弹 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442256.html