ARMY MIL-C-62135 A-1976 CRANE MATERIAL HANDLING (BASIC AND REBUILD)《物料搬运(基本和重建)起重机》.pdf
《ARMY MIL-C-62135 A-1976 CRANE MATERIAL HANDLING (BASIC AND REBUILD)《物料搬运(基本和重建)起重机》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-62135 A-1976 CRANE MATERIAL HANDLING (BASIC AND REBUILD)《物料搬运(基本和重建)起重机》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、flIL-C-bZ135A 39 7797706 0288744 L m MIL-C-62135A4AT) 21 May 1976 SuPERsEDfNG MIL-C-62135(AT) 27 October 1970 MILITARY SPECIFICATION CRANE: MATERULHANDLING This specification is approved for use by all Depariment and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification cover
2、s a revolving type crane having a lifting casy of not less than 2,500 pounds at its maxmum reach. 2. APPLICABLE DOCUMENTS 2,l !he following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the ex- tent specified herein. SPE
3、C IF ICATIONS Federal RR -W -410 - Wire Rope and Strand. Mlitary MIL-V-173 - Varnish, Misture-and-Fungus-Resistant (For the Treatment of Communications, Electronic, and Associated Electrical Equipnent) . and Blank. MIL-P-514 - Plates; Identification, Transportation-Data MIL-W-83420 - Wire Rope, Flex
4、ible for Aircraft Control. t Beneficial comments ( recomnrrndations, additims, deletions) and any pertinent data which may be of use in improving this document should be addressed to: U.S. Arnly Tank-Automotive Materiel Readiness Command by ushg the self-addresse no cost ta the Government, Failure s
5、f the contracWr ta pranptly correct defects shall be came for suspension of acceptance of cranes until corrective action has been acccmplished, 4.2.3 Crane Disposition. Upon canplction of inspection and acceptance of the firetprcduction crane, the crane ehall remain at the manufacturing facil- ity 8
6、8 a production sample. The contractor shall service and maintain the crane Quriilg this period while in storage. At the discretion of the contracting officer, tho crane siay be raleased for shipmmt, 4.2.4 Final Approval and Acceptance. Final approval and acceptance by ths Gcmrnmrit of the first prod
7、uction crane shall be withheld until the initial Er Mjor Deficiencies, A major deficiency (see 6.8) ia recurring when the am defect occurs more than once in the BW sample or when the defect occura in two successive mnples, A wJor defect my be consiered recurring when the historical inspection record
8、e reflect such EI condition, Re- curring mjor deficiencies shall be cauBe for the entire lot or lots to be in- sgectcd for tho recurring deficiencies. The deficiencies shall be corrected when founl, 4,4,1,5 Recurring Minor Deficiencies. A minor deficiency (see 6.8) is recurring when it occurs mre th
9、an twice in the sample or when the defect occur6 in four successive samples. Recurring minor deficiencies shall be cause for the entire lot or lots 4x1 be inspected for recurring deficiency, Correction of all daficienciee ahall be accomplished prior to acceptance, TABLE I - CLACCI%ICATION OF QUALITY
10、 DEFeCTS Skfect Method of . Defects Inspcc t ion MJar AQL l,* Defective 201 Electric hzick, Cargo: 8 Ton, 4x4, M520 for reference purposes: “6.5 Mission Statement, One mission shall consist of 100 miles of operation under these corditions of load, speed, terrain, and environment with special functio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC62135A1976CRANEMATERIALHANDLINGBASICANDREBUILD 物料 搬运 基本 重建 起重机 PDF

链接地址:http://www.mydoc123.com/p-441969.html