1、 GUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS JUNE 2010 CORRIGENDA/EDITORIALS 1 September 2010 CORRIGENDA/EDITORIALS 6 March 2012 CORRIGENDA/EDITORIALS 1 September 2012 CORRIGENDA/EDITORIALS 1 June 2013 CORRIGENDA/EDITORIALS 1 February 2014 CORRIGENDA/EDITORIALS 1 June 2
2、014 CORRIGENDA/EDITORIALS 1 January 2015 CORRIGENDA/EDITORIALS 1 January 2016 CORRIGENDA/EDITORIALS 22 February 2016 Page No. Paragraph Comments Foreword iii - In first paragraph, “the ABS Guide for Building and Classing Membrane Tank LNG Vessels” to read “Part 5C, Chapter 12 of the ABS Rules for Bu
3、ilding and Classing Steel Vessels”. iii - In first paragraph, “ABS Guide for Building and Classing Floating Production Installations” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. iii Reference Note In first paragraph, “FPI Guide” to read “FPI Rules”. C
4、hapter 1 Conditions of Classification Section 1 Scope and Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures) 2 1-1/5.1 Revise to read, “the symbol null A1, followed by Offshore Liquefied Gas Terminal and the appropriate notation
5、for the intended service listed below.”. 3 1-1/7.1 Reference “ABS Guide for Building and Classing Floating Production Installations (FPI Guide)” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. 3 1-1/7.5 Reference “2-2/3” to read “2-2/5”. 4 1-1/11.1 In PCI
6、, “Instititue” to read “Institute”. 5 1-1/11.3 Item vi) to read “FPI Rules ABS Rules for Building and Classing Floating Production Installations”. 5 1-1/11.3 Item vii) to read “Facilities Rules ABS Rules for Building and Classing Facilities on Offshore Installations”. 5 1-1/11.3 Delete reference “LN
7、GC Guide ABS Guide for Building and Classing Membrane Tank LNG Vessels”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 1 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 2 Design Considerations Section 1 Classification of Floating Offsho
8、re Liquefied Gas Terminals 9 2-1/3.3 Reference “4-3-5/15 of the Steel Vessel Rules” to read “Section 2 of the ABS Guide for Dynamic Positioning Systems”. 10 2-1/3.9 In second paragraph, reference “3-5/7.4” to read “3-5/7.5”. 10 2-1/3.9.2 In third paragraph, “FPI Guide” to read “FPI Rules”. 10 2-1/3.
9、9.2 In last paragraph, “FPI Guide” to read “FPI Rules”. 11 2-1/3.13 (was 2-1/3.11) Add new Paragraph to reference OHCM notation, as follows: “3.11 Hull Construction Monitoring Program Floating Liquefied Gas Terminals designed and reviewed to the FLGT Guide are to comply with the requirements of the
10、Offshore Hull Construction Monitoring Program in Chapter 3, Appendix 6 of this Guide and have the notation OHCM.” 12 2-1/11 In Item ii), “FPI Guide” to read “FPI Rules”. 12 2-1/11 In Item iii), “Facilities Guide” to read “Facilities Rules”. 12 2-1/11 In Item ix), “FPI Guide” to read “FPI Rules”. 15
11、2-1/13.1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 16 2-1/13.1.4 In second bullet, reference “2-2/1” to read “2-2/1.1.1”. 16 2-1/13.3 In last bullet, “FPI Guide” to read “FPI Rules”. 21 2-1/15 In last paragraph, “FPI Guide” to read “FPI Rules”. (2 places) Chapter 2 Design Considerations
12、 Section 2 Design of Floating Offshore Liquefied Gas Terminals 22 2-2/1.1 In first paragraph, reference “2-2/1” to read “2-2/1.1.1”. 22 2-2/1.1 In first paragraph, “FPI Guide” to read “FPI Rules”. 23 2-2/1.1.3 Reference “Part 3, Chapter 4” to read “Part 3, Chapter 4 of the FPI Rules”. 25 2-2/3 (was
13、2-2/1.3) In first paragraph, reference “2-2/3” to read “2-2/5”. 26 2-2/7 (was 2-2/5) In last paragraph, “FPI Guide” to read “FPI Rules”. (2 places) 26 2-2/7.1.1 Renumber 5.1.1(d) through 5.1.1(g) as 7.1.1(d) through 7.1.1(g). 26 2-2/7.1.2(b) Reference “5C-8-4/9” to read “5C-8-4/19”. 26 2-2/7.1.2(b)
14、Reference “5C-8-4/9.1” to read “5C-8-4/19.1.2”. 26 2-2/7.1.2(c) Reference “5C-8-4/10” to read “5C-8-4/20”. 27 2-2/7.1.4(a)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.4(b)ii) Reference “5C-8-1/11” to read “5C-8-1/11 (ABS)”. 27 2-2/7.1.5(b) (was 2-2/5.1.5(b) In second paragraph, de
15、lete reference “and 2-1/3.11”. 30 2-2/9.7 (was 2-2/7.7) Reference “Section 4.3 of NFPA 59A” to read “Section 7.4.3 of NFPA 59A”. 2 ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Comments Chapter 2 Design Co
16、nsiderations Section 2 Design of Floating Offshore Liquefied Gas Terminals 31 2-2/9.9 (was 2-2/7.9) In first paragraph, “Facilities Guide” to read “Facilities Rules”. 31 2-2/11.1 In first paragraph, reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 31 2-2/11.1 In first paragraph, reference “2
17、-2/3” to read “2-2/5”. 31 2-2/11.1 In fourth paragraph, “dependant” to read “dependent”. 32 2-2/11.1 In fifth paragraph, reference “2-2/3” to read “2-2/5”. 32 2-2/11.1.1 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 32 2-2/11.1.1 Reference “NFPA 59, A Standard for the Production
18、, Storage and Handling of Liquefied Natural Gas (LNG) 2001” to read “NFPA 59A, Standard for the Production, Storage and Handling of Liquefied Natural Gas (LNG) 2013”. 33 2-2/11.1.2 In second paragraph, “3-3/17 of the Facilities Guide” to read “3-3/9 of the Facilities Rules”. 33 2-2/11.1.2 In second
19、paragraph, “ABS Guide” to read “ABS Rules”. 34 2-2/11.13 In last line, “FPI Guide” to read “FPI Rules”. 35 2-2/13.5 Reference “2-2/3” to read “2-2/5”. 35 2-2/13.7 Reference “5C-8-3/8” to read “5C-8-3/8 and 5C-8-5/10.1”. 35 2-2/13.9 Reference “Facilities Guide” to read “Facilities Rules”. (2 places)
20、35 2-2/15 In second paragraph, reference “5C-8-1/3.17” to read “5C-8-1/2.24”. 35 2-2/15 In second paragraph, reference “Chapter 7, Section 7.6 of NFPA 59A” to read “Chapter 7, Section 10.7 of NFPA 59A”. 35 2-2/15 In third paragraph, “Facilities Guide” to read “Facilities Rules”. 36 2-2/17 Reference
21、“Facilities Guide” to read “Facilities Rules”. (2 places) 36 2-2/19 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 37 2-2/21 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.3.1 Reference “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.3.2 Re
22、ference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.5 Reference “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.5 Reference “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 38 2-2/23.7 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 38 2-2/23.7 Refer
23、ence “NFPA 59A Chapter 9” to read “NFPA 59A Chapter 12”. 39 2-2/23.9 In second paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.11 In first paragraph, “Facilities Guide” to read “Facilities Rules”. 39 2-2/23.15.1 In first paragraph, reference “Section 9.2 of NFPA 59A” to read “Sec
24、tion 12.3 of NFPA 59A”. 39 2-2/23.15.1 In second paragraph, reference “5C-8-5/6” to read “5C-8-5/5”. 40 2-2/25 Reference “FPI Guide” to read “FPI Rules”. ABSGUIDE FOR BUILDING AND CLASSING FLOATING OFFSHORE LIQUEFIED GAS TERMINALS .2010 3 Corrigenda/Editorials 22 February 2016 Page No. Paragraph Com
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS169CORR2016GUIDEFORBUILDINGANDCLASSINGFLOATINGOFFSHORELIQUEFIEDGASTERMINALSPDF

链接地址:http://www.mydoc123.com/p-400669.html