1、 Guide for Hull Survey for New Construction GUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION AUGUST 2007 (Updated February 2014 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2007 American Bureau of Shipping ABS Plaza 16855 Northchase
2、Drive Houston, TX 77060 USA Updates February 2014 consolidation includes: July 2011 version plus Corrigenda/Editorials July 2011 consolidation includes: July 2010 version plus Notice No. 2 and Corrigenda/Editorials July 2010 consolidation includes: August 2007 version plus Notice No. 1 ABSGUIDE FOR
3、HULL SURVEY FOR NEW CONSTRUCTION .2007 iii Foreword Foreword This Guide contains requirements obtained from IACS Unified Requirement, UR Z23 “Hull Survey for New Construction”. For the convenience of the users, the various cross-references to the relevant ABS Rules and Guides are provided in additio
4、n to those for IACS documents. These IACS documents, UR, UI (Unified Interpretation) and Recommendation, are available from www.iacs.org.uk. (1 July 2010) The July 2010 update to this Guide incorporates the latest requirements of IACS UI SC234, UI LL76, and UI MPC96, regarding initial statutory surv
5、eys at new construction. Updates to IACS UR Z23 are also incorporated. The effective date of this Guide is 1 January 2008 and it is applicable for vessels contracted for construction on or after 1 January 2008. iv ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 Table of Contents GUIDE FOR HULL S
6、URVEY FOR NEW CONSTRUCTION CONTENTS 1 Scope . 1 2 Definitions . 1 2.1 Hull Structure . 1 2.2 Documents . 1 2.3 Survey Methods . 1 3 Applications 2 3.1 Vessel Types 2 3.2 Statutory Items . 2 3.3 Equipment, Fittings and Appendages 2 3.4 Installation and Testing 2 3.5 Locations of Construction 2 4 Qual
7、ification and Monitoring of Personnel 2 5 Survey of the Hull Structure 3 5.1 Items to be Surveyed . 3 5.2 Evidence of Survey of Materials and Equipment . 3 6 Review of the Construction Facility 3 7 Newbuilding Survey Planning . 4 7.1 Kick-off Meeting . 4 7.2 Administration and Statutory Requirements
8、 4 7.3 Update of Meeting Record . 4 7.4 Shipbuilding Quality Standards 4 7.5 Attendance by Other Parties 4 7.6 Series Ship Production 4 8 Examination and Test Plan for Newbuilding Activities . 4 9 Proof of the Consistency of Surveys 5 9.1 Compliance with Newbuilding Survey Planning . 5 9.2 Audit . 5
9、 10 Ship Construction File . 5 10.1 Responsibility . 5 10.2 Documents to be Included . 5 ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 v 11 Initial Statutory Surveys at New Construction . 23 11.1 Scope . 23 11.2 Definitions Used in the Survey Tables . 23 11.3 Application 23 11.4 Interpretation
10、 of the Survey Requirements 23 11.5 Qualification and Monitoring of Personnel . 24 11.6 Inspection and Test Plan for New Building Activities . 24 11.7 Product and Type Approval Certificates 24 11.8 Proof of the Consistency of Surveys 24 TABLE 1 6 APPENDIX 1 Survey Tables for Initial Statutory Survey
11、s at New Construction . 25 1 Description 25 TABLE 1 Safety Equipment (1 July 2010) . 26 TABLE 2 Load Line (1 July 2010) 39 TABLE 3 MARPOL Annex 1 (1 July 2010) 42 APPENDIX 2 Shipyard Review Record . 48 1 Details of Any Management Systems . 48 2 Construction Facilities . 48 2.1 Building Berth (B) or
12、Dock (D) . 48 2.2 Outfitting Quays . 48 2.3 Main Fabrication and Erection Facilities 49 3 Shipyard Control of Qualified Welders 50 4 Feature of Construction Procedure . 50 5 Quality Control System . 51 6 Measures for Safety and Health . 51 7 Control System of Nondestructive Examination (NDE) 52 8 Qu
13、ality Control on Production Line . 53 8.1 Preventive Measures for Misuse of Materials 53 8.2 Shot Blasting/Primer Coating 53 8.3 Marking and Cutting (Assembly Work) 54 8.4 Bending and Strain Free 54 8.5 Control of Welding Procedure . 54 8.6 Treatment of Serious Non-conformities . 55 8.7 Hydrostatic
14、and Watertight Tests 55 This Page Intentionally Left Blank ABSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 1 Guide for Hull Survey for New Construction 1 Scope The scope of this Guide includes the following: i) Examination of the parts of the vessel covered by the Rules and by applicable statuto
15、ry regulations for hull construction, to obtain appropriate evidence that they have been built in compliance with the Rules and regulations, taking account of the relevant approved drawings. ii) Appraisal of the manufacturing, construction, control and qualification procedures, including welding con
16、sumables, weld procedures, weld connections and assemblies, with indication of relevant approval tests. iii) Witnessing inspections and tests as required in the Rules applicable for ship construction, including materials, welding and assembling, specifying the items to be examined and/or tested and
17、how (e.g., by hydrostatic, hose or leak testing, nondestructive examination, verification of geometry) and by whom. Appraisal of materials and equipment used for ship construction and their inspection at works is not included in this Guide. Details of requirements for hull and machinery steel forgin
18、gs and castings and for normal and higher strength hull structural steel are given in Section 2-1-6, Section 2-1-5 and Sections 2-1-2 and 2-1-3, respectively, of the ABS Rules for Materials and Welding (Part 2). Acceptance of these items is verified through the survey process carried out at the manu
19、facturers works and the issuing of the appropriate certificates. 2 Definitions 2.1 Hull Structure The hull structure is defined as follows: i) Hull envelope including all internal and external structures ii) Superstructures, deckhouses and casings iii) Welded foundations (e.g., main engine seatings)
20、 iv) Hatch coamings, bulwarks v) All penetrations fitted and welded into bulkheads, decks and shell vi) The fittings of all connections to decks, bulkheads and shell, such as air pipes and ship side valves all ILLC 1966, as amended, items vii) Welded attachments to shell, decks and primary members (
21、e.g., crane pedestals, bitts and bollards), but only as regards their interaction on the hull structure 2.2 Documents Reference to documents also includes electronic transmission or storage. 2.3 Survey Methods Definition of survey methods which the Surveyor is directly involved in: Patrol, Review an
22、d Witness: 2.3.1 Patrol (1 July 2010) Patrol is the act of checking on an independent and unscheduled basis that the applicable processes, activities and associated documentation of the shipbuilding functions identified in Table 1 continue to conform to classification and statutory requirements. 2 A
23、BSGUIDE FOR HULL SURVEY FOR NEW CONSTRUCTION .2007 2.3.2 Review (1 July 2010) Review is the act of examining documents in order to determine traceability and identification and to confirm that processes continue to conform to classification and statutory requirements. 2.3.3 Witness Witness is attend
24、ance of scheduled survey items as defined within the shipbuilding functions. 3 Applications 3.1 Vessel Types This Guide covers the survey of all new construction of steel vessels intended for classification and for international voyages except for: i) Those defined in SOLAS I/3 ii) High speed craft
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS1572007GUIDEFORHULLSURVEYFORNEWCONSTRUCTION 建筑物 船体 调查 指南 PDF

链接地址:http://www.mydoc123.com/p-400635.html