BS PD ISO TS 16901-2015 Guidance on performing risk assessment in the design of onshore LNG installations including the ship shore interface《包括船 岸上支持接口的陆上液化天然气装置风险评估设计执行指南》.pdf
《BS PD ISO TS 16901-2015 Guidance on performing risk assessment in the design of onshore LNG installations including the ship shore interface《包括船 岸上支持接口的陆上液化天然气装置风险评估设计执行指南》.pdf》由会员分享,可在线阅读,更多相关《BS PD ISO TS 16901-2015 Guidance on performing risk assessment in the design of onshore LNG installations including the ship shore interface《包括船 岸上支持接口的陆上液化天然气装置风险评估设计执行指南》.pdf(68页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards Publication Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface PD ISO/TS 16901:2015National foreword This Published Document is the UK implementation of ISO/TS 16901:2015. The UK participation in its preparation was entr
2、usted to Technical Committee PSE/17, Materials and equipment for petroleum, petrochemical and natural gas industries. A list of organizations represented on this committee can be obtained on request to its secretary. This publication does not purport to include all the necessary provisions of a cont
3、ract. Users are responsible for its correct application. The British Standards Institution 2015. Published by BSI Standards Limited 2015 ISBN 978 0 580 82717 4 ICS 75.180.01 Compliance with a British Standard cannot confer immunity from legal obligations. This Published Document was published under
4、the authority of the Standards Policy and Strategy Committee on 31 March 2015. Amendments/corrigenda issued since publication Date Text affected PUBLISHED DOCUMENT PD ISO/TS 16901:2015 ISO 2015 Guidance on performing risk assessment in the design of onshore LNG installations including the ship/ shor
5、e interface Guide pour lvaluation des risques dans la conception dinstallations terrestres pour le GNL en incluant linterface terre/navire TECHNICAL SPECIFICATION ISO/TS 16901 Reference number ISO/TS 16901:2015(E) First edition 2015-03-01 ISO/TS 16901:2015(E)ii ISO 2015 All rights reserved COPYRIGHT
6、 PROTECTED DOCUMENT ISO 2015 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission
7、. Permission can be requested from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland PD ISO/TS 16901
8、:2015 ISO/TS 16901:2015(E)Foreword v 1 Scope . 1 2 Normative references 1 3 T erms and definitions . 1 4 Abbreviations. 6 5 Safety Risk Management 7 5.1 Decision support framework for risk management 7 5.2 Prescriptive safety or risk performance . 8 5.3 Risk assessment in relation to project develop
9、ment . 9 6 Risk 11 6.1 What is risk .11 6.2 Safety philosophy and risk criteria .11 6.3 Risk control strategy .11 6.4 ALARP 12 6.5 Ways to express risk to people .13 6.5.1 General.13 6.5.2 Risk contours (RC) 13 6.5.3 Risk transects (RT) . .14 6.5.4 Individual risk (IR) 14 6.5.5 Potential loss of lif
10、e (PLL) .14 6.5.6 Fatal accident rate (FAR)14 6.5.7 Cost to avert a fatality (CAF) .14 6.5.8 F/N curves (FN) .14 6.6 Uncertainties in QRA.15 7 Methodologies 15 7.1 Main steps of risk assessment 15 7.2 Qualitative risk analysis .15 7.2.1 HAZID .15 7.2.2 Failure mode and effect analysis (FMEA) 17 7.2.
11、3 Risk matrix .17 7.2.4 Bow-tie 18 7.2.5 HAZOP 19 7.2.6 SIL analysis 21 7.3 Quantitative analysis: consequence and impact assessment .21 7.3.1 Consequence assessment 21 7.3.2 Impact assessment 23 7.4 Quantitative analysis: frequency assessment 24 7.4.1 General.24 7.4.2 Failure data 24 7.4.3 Consensu
12、s data .25 7.4.4 FAULT tree 25 7.4.5 Event tree analysis (ETA) 25 7.4.6 Exceedance curves based on probabilistic simulations 25 7.5 Risk assessments (consequence*frequency) .26 7.5.1 Risk assessment tools .26 7.5.2 Ad hoc developed risk assessment tools 27 7.5.3 Proprietary risk assessment tools .27
13、 8 Accident scenarios .28 8.1 Overview accident scenarios .28 8.2 LNG import facilities including SIMOPS .28 8.3 LNG export facilities 31 8.4 Chain of events following release scenarios .32 ISO 2015 All rights reserved iii Contents Page PD ISO/TS 16901:2015 ISO/TS 16901:2015(E)9 Standard presentatio
14、n of risk 34 Annex A (informative) Impact criteria 36 Bibliography .57 iv ISO 2015 All rights reserved PD ISO/TS 16901:2015 ISO/TS 16901:2015(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of p
15、reparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental,
16、in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. The procedures used to develop this document and those intended for its further maintenance are described in the ISO/
17、IEC Directives, Part 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. This document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives). Attention is drawn to the possibilit
18、y that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of pate
19、nt declarations received (see www.iso.org/patents). Any trade name used in this document is information given for the convenience of users and does not constitute an endorsement. For an explanation on the meaning of ISO specific terms and expressions related to conformity assessment, as well as info
20、rmation about ISOs adherence to the WTO principles in the Technical Barriers to Trade (TBT) see the following URL: Foreword - Supplementary information. The committee responsible for this document is ISO/TC 67, Materials, equipment and offshore structures for petroleum, petrochemical and natural gas
21、 industries. ISO 2015 All rights reserved v PD ISO/TS 16901:2015 Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface 1 Scope This Technical Specification provides a common approach and guidance to those undertaking assessment of the ma
22、jor safety hazards as part of the planning, design, and operation of LNG facilities onshore and at shoreline using risk-based methods and standards, to enable a safe design and operation of LNG facilities. The environmental risks associated with an LNG release are not addressed in this Technical Spe
23、cification. This Technical Specification is aimed to be applied both to export and import terminals, but can be applicable to other facilities such as satellite and peak shaving plants. It applies to all facilities inside the perimeter of the terminal and all hazardous materials including LNG and as
24、sociated products: LPG, pressurised natural gas, odorizers, and other flammable or hazardous products handled within the terminal. The navigation risks and LNG tanker intrinsic operation risks are recognised, but they are not in the scope of this Technical Specification. Hazards arising from interfa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSPDISOTS169012015GUIDANCEONPERFORMINGRISKASSESSMENTINTHEDESIGNOFONSHORELNGINSTALLATIONSINCLUDINGTHESHIPSHOREINTERFACE

链接地址:http://www.mydoc123.com/p-398935.html