1、05-11 23 11 23 - 1 SECTION 23 11 23 FACILITY NATURAL-GAS PIPING SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Where the scope of work includes installation of a gas meter, ensure t
2、ie-in with the building metering system, if any, at the VA facility. Use section 25 25 10 for guidance. PART 1 - GENERAL 1.1 DESCRIPTION Fuel gas systems, including piping, equipment and all necessary accessories as designated in this section. Fuel gas piping for central boiler plants is not include
3、d. 1.2 RELATED WORK A. Section 07 84 00, FIRESTOPPING: Penetrations in rated enclosures. B. Section 09 91 00, PAINTING: Preparation and finish painting and identification of piping systems. C. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING. D. Section 22 05 23, GENERAL DUTY VALVES FOR PLUMBING P
4、IPING E. Section 23 07 11, HVAC and BOILER PLANT INSULATION: Pipe Insulation. F. Section 23 21 11, BOILER PLANT PIPING SYSTEMS: Fuel Gas Piping For Boiler Plants. G. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training. H. Sectio
5、n 23 51 00 BREECHINGS, CHIMEYS, and STACKS I. Section 25 10 10 ADVANCED UTILITY METERING SYSTEM J. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS 1.3 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Manufacturers Literature and Data: 1. Pipe
6、 felt material shall be fibrous glass mat as specified in Appendix Section A2.1 of AWWA C203. 2. Adhesive-thermoplastic Resin Coating: Fed. Spec. L-C-530, Type I 3. Thermosetting Epoxy Coating: Fed. Spec. L-C-530, Type II 4. Field-applied plastic tape material used on pipe joints and for repairing d
7、amaged areas of shop-applied coatings, Fed. Spec. L-T-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 11 23 - 4 1512, Type I, 10 mils nominal thickness for pipe joints, and Type II, 20 mils nominal thickness for coating repairs. C. Holiday I
8、nspections: Procedure for holiday inspection: Holiday Inspection shall be conducted on all coatings to determine the presence and number of discontinuities in those coatings referenced in 2.6/B - 1, 2, 3, and 4 using a Tinker end entry, threaded ends, UL-listed for natural or LP gas shut off service
9、 when used on those services. B. Gas Vent Cocks: Type 701: Bronze body, tee handle, rated for 205 kPa at 38C (30 psi at 100F), ground plug, rated for tight shut-off on fuel gas service. 2.5 WATERPROOFING A. Provide at points where pipes pass through membrane waterproofed floors or walls in contact w
10、ith earth. B. Floors: Provide cast iron stack sleeve with flashing device and a underdeck clamp. After stack is passed through sleeve, provide a waterproofed caulked joint at top hub. C. Walls: See detail shown on drawings. 2.6 STRAINERS A. Provide on high pressure side of pressure reducing valves,
11、on inlet side of indicating and control instruments and equipment subject to sediment damage and where shown on drawings. Strainer element shall be removable without disconnection of piping. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 11
12、 23 - 6 B. Gas Lines: “Y“ type with removable mesh lined brass strainer sleeve. C. Body: Smaller than 80 mm (3 inches), brass or bronze; 80 mm (3 inches) and larger, cast iron or semi-steel. 2.7 DIELECTRIC FITTINGS Provide dielectric couplings or unions between ferrous and non-ferrous pipe. 2.8 GAS
13、EQUIPMENT CONNECTORS Flexible connectors with teflon core, interlocked galvanized steel protective casing, AGA certified design. PART 3 - EXECUTION 3.1 INSTALLATION A. General: Comply with the International Fuel Gas Code and the following: 1. Install branch piping for fuel gas and connect to all fix
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2311232011FACILITYNATURALGASPIPINGPDF