1、09-11 23 10 00 - 1 SECTION 23 10 00 FACILITY FUEL SYSTEMS PART 1 GENERAL: SPEC WRITER NOTES: 1. Delete between /_/ if not applicable to project and delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Revise as necessary to conform to local and state regul
2、ations. 3. References to pressure are gage pressure unless otherwise noted. 4. This spec does not cover heated burner fuel storage. 5. VA National CAD Standard for underground oil storage tanks, 30,000 litres (8000 gallons) and above: 15606-1.DWG 1.1 DESCRIPTION: SPEC WRITER NOTE: Verify that the co
3、ntract drawings show complete info on the tank locations, capacities, piping arrangement. A. Diesel fuel oil and unheated burner fuel oil tanks, piping, and accessories located outside, underground or aboveground as shown on contract drawings. Refer to contract drawings for type of fuel and for tank
4、 capacities. B. Tank fluid level monitoring and alarm systems. C. Leak detection system for tanks and underground piping. D. Fuel oil quality maintenance system (water and particulate removal). 1.2 RELATED WORK: A. Underground steam and condensate piping for tank heaters: Section 33 63 00, STEAM ENE
5、RGY DISTRIBUTION. B. Excavation and backfill for underground tanks and piping: Section 31 20 00, EARTH MOVING and Section 31 20 11, EARTH MOVING (SHORT FORM) . C. Concrete ballast foundations and concrete pads: Section 03 30 00, CAST-IN-PLACE CONCRETE. D. Sidewalk doors for underground tank manway e
6、nclosures: Section 05 50 00, METAL FABRICATIONS. E. Platforms, stairs, ladders and railings for aboveground tanks: Section 05 50 00, METAL FABRICATIONS. F. Sealing of pipe penetrations: Section 07 92 00, JOINT SEALANTS. G. Primer and finish painting: Section 09 91 00, PAINTING. Provided by IHSNot fo
7、r ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 23 10 00 - 2 H. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS. I. Section 23 05 11, COMMON WORK RESULTS FOR HVAC AND STEAM GENERATION. J. Field insulation of heated oil piping and abov
8、eground tanks and aboveground oil piping: Section 23 07 11, HVAC, PLUMBING, AND BOILER PLANT INSULATION. K. Steam and condensate carrier piping within tanks and access manholes: Section 23 21 11, BOILER PLANT PIPING SYSTEMS. L. Fuel oil pumps for boiler plant: Section 23 50 11, BOILER PLANT MECHANIC
9、AL EQUIPMENT. M. Fuel oil pumps for engine generators: Section 26 32 13, ENGINE GENERATORS. N. Underground conduit systems for tank fluid level monitors and tank and piping leak detectors: Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION. /O. Where soil resistivity is less than 4000 ohm-cm: Sec
10、tion 26 42 00, CATHODIC PROTECTION). / 1.3 QUALITY ASSURANCE: A. Approval by Contracting Officer is required of products or services of proposed manufacturers, suppliers and installers, and will be based on Contractors certification that: 1. Manufacturers regularly and currently manufacture tanks, t
11、ank and piping accessories, tank fluid level monitoring and leak detection systems, fuel quality management systems. 2. Manufacturers of steel tanks participate in the Quality Assurance Program of the Steel Tank Institute (STI). 3. The design and size of each item of equipment provided for this proj
12、ect is of current production and has been in satisfactory operation on at least three installations for approximately three years. Current models of fluid level and leak detection systems with less than three years service experience are acceptable if similar previous models from the same manufactur
13、er have at least three years service experience. B. Apply and install materials, equipment and specialties in accordance with manufacturers written instructions. Conflicts between the manufacturers instructions and the contract drawings and specifications shall be referred to the Resident Engineer (
14、RE)/Contracting Officers Technical Representative (COTR) for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 23 10 00 - 3 resolution. Provide copies of installation instructions to the RE/COTR two weeks prior to commencing installation of any i
15、tem. C. All equipment shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components or overall assembly. D. Tanks, Secondary Containment Systems for Piping, Plastic Piping and Containment Systems, Tank Level Monitoring Systems, Leak D
16、etection Systems, Fuel Quality Management Systems, Cathodic Protection Systems: Authorized manufacturers representatives shall provide on-site training of installers and supervision of the installation and testing of the equipment and systems to assure conformance to written instructions of manufact
17、urers. E. Tank and piping installation contractor shall be certified as acceptable by local and state pollution control authorities. F. Entire installation shall conform to requirements of local and state pollution control authorities. G. Pipe Welding: Conform to requirements of ASME B31.1. Welders
18、shall show evidence of qualification. Welders shall utilize a stamp to identify their work. Unqualified personnel will be rejected. H. Assembly of Glass Fiber Reinforced Plastic Piping: Installation personnel shall have been trained, tested and certified under a procedure approved by the manufacture
19、r of the piping. Proof of certification, in writing, shall be provided to the RE/COTR. I. Where specified codes or standards conflict, consult the RE/COTR. J. Label of Conformance (definition): Labels of accredited testing laboratories showing conformance to the standards specified. K. Equipment and
20、 materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a safe, complete and fully operational system which conforms to contract requirements and in which no item is subject to conditions beyond its design capabilit
21、ies. 1.4 SUBMITTALS: A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Underground Tanks: 1. Drawings of tanks, anchoring devices, heating coils (if required), tank manholes, tank manhole enclosures, access doors for the tank manhole enclosures and all acces
22、sories. Include overall dimensions Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 23 10 00 - 4 and dimensional locations and sizes of all anchoring devices, pipe connections, access openings. 2. Manufacturers installation instructions describi
23、ng recommended foundation, bedding and backfill material, support and anchoring devices, and method of installation. 3. Weight of entire tank assemblies, empty and flooded. 4. Certification of compliance with specified standards. 5. Certification that steel tank manufacturer participates in the Stee
24、l Tank Institute (STI) Quality Assurance Program. 6. Data certifying that tanks are designed for surcharge loads of backfill, traffic and other construction. 7. Design and construction of tanks, secondary containment, pipe connections, manholes, anchoring devices, access doors for tank manhole enclo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2310002011FACILITYFUELSYSTEMSPDF