1、05-11 22 07 11 - 1 SECTION 22 07 11 PLUMBING INSULATION SPEC WRITER NOTE: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. References to pressures in this Section are gage pressure unless otherwise
2、noted. 2. Designer Note: This specification has links connected to 0ther documents in VA “Technical Information Library (TIL).” These links provide the designer with easy access to these documents while editing this specification. These links must be deleted before the specification is finalized for
3、 a particular project. To delete these links make sure macros are installed on your system, and if not do the following: Click on Tools. Go to Macro and click on Security. Check the Medium Security Level. Close the specification, if open. Open the specification (again) and follow the prompts on the
4、screen. Click on Enable Macros when first prompt appears. Delete the links only if specification is ready to be included in the project. PART 1 - GENERAL 1.1 DESCRIPTION A. Field applied insulation for thermal efficiency and condensation control for 1. Plumbing piping and equipment. /2. Re-insulatio
5、n of plumbing piping and equipment after asbestos abatement./ B. Definitions 1. ASJ: All service jacket, white finish facing or jacket. 2. Air conditioned space: Space having air temperature and/or humidity controlled by mechanical equipment. 3. Cold: Equipment or piping handling media at design tem
6、perature of 16 degrees C (60 degrees F) or below. 4. Concealed: Piping above ceilings and in chases, /interstitial space, / and pipe spaces. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 22 07 11 - 2 5. Exposed: Piping and equipment exposed t
7、o view in finished areas including mechanical equipment rooms or exposed to outdoor weather. Shafts, chases, /interstitial spaces, / unfinished attics, crawl spaces and pipe basements are not considered finished areas. 6. FSK: Foil-scrim-kraft facing. 7. Hot: Plumbing equipment or piping handling me
8、dia above 41 degrees C (105 degrees F). 8. Density: kg/m3 - kilograms per cubic meter (Pcf - pounds per cubic foot). 9. Thermal conductance: Heat flow rate through materials. a. Flat surface: Watts per square meter (BTU per hour per square foot). b. Pipe or Cylinder: Watts per square meter (BTU per
9、hour per linear foot). 10. Thermal Conductivity (k): Watt per meter, per degree C (BTU per inch thickness, per hour, per square foot, per degree F temperature difference). 11. Vapor Retarder (Vapor Barrier): A material which retards the transmission (migration) of water vapor. Performance of the vap
10、or retarder is rated in terms of permeance (perms). For the purpose of this specification, vapor retarders shall have a maximum published permeance of 0.1 perms and vapor barriers shall have a maximum published permeance of 0.001 perms. 12. R: Pump recirculation. 13. CW: Cold water. 14. SW: Soft wat
11、er. 15. HW: Hot water. 16. PVDC: Polyvinylidene chloride vapor retarder jacketing, white. 1.2 RELATED WORK / A. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT: Insulation containing asbestos material /. / B. Section 02 82 13.13, GLOVEBAG ASBESTOS ABATEMENT: Insulation containing asbestos material
12、/. C. Section 07 84 00, FIRESTOPPING: Mineral fiber and bond breaker behind sealant. / D. Section 11 41 21, WALK-IN COOLERS AND FREEZERS: Insulation used in refrigerators and freezers /. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 22 07 11
13、- 3 E. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING: General mechanical requirements and items, which are common to more than one section of Division 22. F. Section 22 05 19, METERS AND GAGES FOR PLUMBING PIPING and Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING: Hot and cold water
14、piping. G. Section 26 32 13, ENGINE GENERATORS: Exhaust stacks and muffler. H. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS. Requirements for commissioning, systems readiness checklists, and training. 1.3 QUALITY ASSURANCE A. Refer to article QUALITY ASSURANCE, in Section 22 05 11, COMMON WOR
15、K RESULTS FOR PLUMBING. B. Criteria: 1. Comply with NFPA 90A, particularly paragraphs 4.3.3.1 through 4.3.3.6, 4.3.10.2.6, and 5.4.6.4, parts of which are quoted as follows: 4.3.3.1 Pipe insulation and coverings, vapor retarder facings, adhesives, fasteners, tapes, unless otherwise provided for in 4
16、.3.3.1.12 or 4.3.3.1.2, shall have, in the form in which they are used, a maximum flame spread index of 25 without evidence of continued progressive combustion and a maximum smoke developed index of 50 when tested in accordance with NFPA 255, Standard Method of Test of Surface Burning Characteristic
17、s of Building Materials. 4.3.3.1.1 Where these products are to be applied with adhesives, they shall be tested with such adhesives applied, or the adhesives used shall have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when in the final dry state. (See 4.2.4.2.) 4.3.3.
18、3 Pipe insulation and coverings shall not flame, glow, smolder, or smoke when tested in accordance with a similar test for pipe covering, ASTM C 411, Standard Test Method for Hot-Surface Performance of High-Temperature Thermal Insulation, at the temperature to which they are exposed in service. 4.3.
19、3.3.1 In no case shall the test temperature be below 121C (250F). 4.3.10.2.6.3 Nonferrous fire sprinkler piping shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 1.5 m (5 ft) or less when tested
20、 in accordance with UL 1887, Standard for Safety Fire Test of Plastic Sprinkler Pipe for Visible Flame and Smoke Characteristics. 4.3.10.2.6.7 Smoke detectors shall not be required to meet the provisions of this section. 2. Test methods: ASTM E84, UL 723, or NFPA 255. Provided by IHSNot for ResaleNo
21、 reproduction or networking permitted without license from IHS-,-,-05-11 22 07 11 - 4 3. Specified k factors are at 24 degrees C (75 degrees F) mean temperature unless stated otherwise. Where optional thermal insulation material is used, select thickness to provide thermal conductance no greater tha
22、n that for the specified material. For pipe, use insulation manufacturers published heat flow tables. For domestic hot water supply and return, run out insulation and condensation control insulation, no thickness adjustment need be made. 4. All materials shall be compatible and suitable for service
23、temperature, and shall not contribute to corrosion or otherwise attack surface to which applied in either the wet or dry state. /C. Every package or standard container of insulation or accessories delivered to the job site for use must have a manufacturers stamp or label giving the name of the manuf
24、acturer and description of the material. / 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Shop Drawings: 1. All information, clearly presented, shall be included to determine compliance with drawings and specifications and ASTM, federal and
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2207112011PLUMBINGINSULATIONPDF