SSPC QP 1-2012 Standard Procedure for Evaluating the Qualifications of Industrial Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Me.pdf
《SSPC QP 1-2012 Standard Procedure for Evaluating the Qualifications of Industrial Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Me.pdf》由会员分享,可在线阅读,更多相关《SSPC QP 1-2012 Standard Procedure for Evaluating the Qualifications of Industrial Marine Painting Contractors (Field Application to Complex Industrial Steel Structures and Other Me.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、SSPC-QP 1March 1, 2012Editorial Revision March 16, 20151SSPC: The Society for Protective CoatingsQualification Procedure No. 1Standard Procedure for Evaluating theQualifications of Industrial/Marine Painting Contractors(Field Application to Complex Industrial Steel Structures and Other Metal Compone
2、nts)1. Scope1.1 This procedure describes a method for evaluating the primary qualifications of industrial/marine painting contractors and defines a minimum standard for qualification.1.2 The purpose of this procedure is to determine whether a contractor:a. Has a corporate organization that clearly d
3、efines the authority and responsibilities of positions typically required for operation of an industrial/marine coating contracting firm;b. Employs qualified management and utilizes qualified craft personnel and other workers;c. Has established and implemented a quality manage-ment system meeting re
4、quirements of Sections 3.3.2 and 3.3.3;d. Has established and implemented a written worker safety and health program meeting requirements of Section 3.4.1 and 3.4.2 and any project-specific requirements; e. Has established and implemented environmental protection procedures meeting requirements of S
5、ection 3.4.3 and any project-specific requirements; f. Demonstrates knowledge of industry technical stan-dards and good painting practice. 1.3 This procedure encompasses the field application of protective coatings for corrosion control in the industrial, marine, highway, municipal, military and oth
6、er sectors where steel structures and other metal components are protected. Specialty applications, such as thermal spray metallizing, coating and surfacing of concrete, bituminous products, galva-nizing, and handling, managing and containing of hazardous materials and debris are not covered by the
7、requirements of this standard procedure. SSPC has developed additional contractor qualification procedures to evaluate firms who perform thermal spray metallizing (QP 6), install polymer coat-ings and surfacings over concrete (QP 8) and who perform hazardous paint removal, such as deleading of indus
8、trial struc-tures prior to protective coating application (QP 2). 1.4 This procedure encompasses surface preparation and coating application and related operations conducted on steel or other metal structures in the field, or maintenance coating of structural steel or other metal components in laydo
9、wn areas. AISC 420-10/SSPC-QP 3 “Certification Standard for Shop Application of Complex Protective Coating Systems,” covers coating operations on newly fabricated steel performed exclu-sively at a fixed shop facility. See Section 6 of this standard procedure.2. Description2.1 DEFINITIONS:Auditor: 1)
10、 The person or persons performing audits on behalf of the qualifying agency. 2) The person(s) possessing the necessary technical and quality system auditing skills to review contractor submittals, conduct on-site audits of appli-cants, and report findings to the qualifying agencys program administra
11、tor in compliance with the requirements of this procedure and the written requirements of the formal audit program.Complex Structure: Industrial steel or other metal struc-tures containing a variety of shapes and configurations, such as metal producing and rolling mills, ships and other marine vesse
12、ls and structures; bridges and towers; processing facili-ties, including chemical and petrochemical processing plants and distribution facilities; pulp and paper mills; power genera-tion plants and substations, food and beverage plants and terminals, water processing and waste treatment facilities;
13、storage tanks, and other industrial and marine steel or other metal structures. Complex structures also include any other metal components affixed to the structure such as truss beams and support structures, etc. Contractor: A firm whose business is providing surface preparation and coating applicat
14、ion and related services for corrosion control in the industrial and marine sectors.Environmental, Health and Safety Manager: A quali-fied employee designated by executive management who is responsible for management, maintenance, and enforce-ment of the contracting companys plans for compliance wit
15、h applicable safety, health and environmental regulations (see Section 3.3.1.3).Field Application: Surface preparation and application of coatings to steel or other metal structures in the field such as tanks, ships, or bridges or maintenance coating of structural components or equipment located in
16、a laydown area. Loss Control: Multidisciplinary approach in which human, engineering, and risk management practices are employed to reduce the frequency or severity of losses. SSPC-QP 1March 1, 2012Editorial Revision March 16, 20152Procedure: The written sequence of steps taken to carry out a partic
17、ular course of action. Qualification: The procedure by which written assurance is given that a contractor conforms to the prescribed set of conditions or requirements of this standard procedure.Qualifying Agency: An organization (e.g., certifying agency or facility owner) responsible for sponsorship
18、 or operation of a program to ensure uniform compliance with the provisions of a standard.Quality Control Inspectors: Persons designated to perform quality control inspections in the field in accordance with any contract requirements and the contractors quality program (see Section 3.3.1.2).Quality
19、Control Supervisor: A qualified employee designated by executive management who is responsible for implementation and maintenance of the firms quality manage-ment system for coating and lining operations (see Section 3.3.1.1). 2.2 TYPES OF STRUCTURES: Complex structures and components encompass a wi
20、de range of structural steel and other metal types and configurations. Although the required evaluation functions are similar for all complex structures, the specific skills (e.g., rigging or pollution controls) are frequently quite different for painting a bridge or painting a process facility or a
21、n ocean-going vessel.Some examples of industrial/marine structures for which specific skills are often associated are listed below: Marine/splash zone: These include structures prox-imate to and remote from both coastal and inland shorelines: Proximate includes waterfront structures, locks, dams, sh
22、ip hulls, flight decks, tanks and voids, bulkheads, piers, pilings, etc. Remote includes offshore platforms and struc-tures, etc. Bridges and towers Metal and manufacturing facilities Chemical and processing facilities: These include chemical and petrochemical plants, pulp and paper mills, food and
23、beverage plants, and water and waste treatment facilities and related storage and distribu-tion facilities. Power generation and distribution facilities2.3 FUNCTIONS TO BE EVALUATED: The procedure identifies four functional areas to be evaluated: Management Procedures; Technical Capabilities; Job Qu
24、ality Monitoring; and Safety, Health and Environmental Compliance. General requirements for each of these function areas are presented in Section 3.2.4 EVALUATION PLANNING: The qualifying agency must develop criteria and/or rating plans to evaluate each contractor against this standard. The qualifyi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SSPCQP12012STANDARDPROCEDUREFOREVALUATINGTHEQUALIFICATIONSOFINDUSTRIALMARINEPAINTINGCONTRACTORSFIELDAPPLICATIONTOCOMPLEXINDUSTRIALSTEELSTRUCTURESANDOTHERMEPDF

链接地址:http://www.mydoc123.com/p-1054499.html