1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 75 00 (May 2012)-Preparing Activity: NASA SupersedingNASA-01 75 00 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 01 75 00STARTING AND ADJUSTING05/12PART 1 GENERAL1.1 SUMMARY1.2 SUBMITTA
2、LS1.2.1 Preconstruction and Pre-Testing Requirements1.2.2 Shop Drawings and Diagrams1.2.3 Product and Design Data1.2.4 Tests Required1.2.4.1 Factory Tests1.2.4.2 Functional Field Test1.2.4.3 Final Acceptance Test1.2.4.4 Test ProceduresPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents
3、 -SECTION 01 75 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 75 00 (May 2012)-Preparing Activity: NASA SupersedingNASA-01 75 00 (October 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONS*SECTION 01 75 00
4、STARTING AND ADJUSTING05/12*NOTE: This guide specification covers the requirements for system testing and acceptance.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this
5、guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggest
6、ions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 SUMMARYRequirements of this Section apply to, and are a component part of, each section of the specifications.1.2 SUBMITTALS*NOTE: Review Submittal Desc
7、ription (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires
8、 Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the SECTION 01 75 00 Page 2Provided by IHSNot for ResaleNo reproduction or netwo
9、rking permitted without license from IHS-,-,-submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the ap
10、proving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes fol
11、lowing the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G
12、“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:*NOTE: Edit th
13、e following Submittals to fit the requirements of the project.*SD-01 Preconstruction SubmittalsVerification of Prior Experience; G; G, _Documentation of Manufacturers Prior Experience; G; G, _Quality Control Plan; G; G, _Manufacturers Sample Warranty; G; G, _Operation and Maintenance Data; G; G, _Pr
14、ovide Evidence; G; G, _SD-02 Shop Drawings Drawings, Diagrams and Schedules; G; G, _ Diagrams and Instructions; G; G, _ Coordination Drawings; G; G, _ SD-03 Product DataCatalog Cuts; G; G, _SECTION 01 75 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
15、om IHS-,-,-Samples of Warranty Language; G; G, _SD-05 Design DataDesign Calculations; G; G, _SD-06 Test ReportsFactory Tests; G; G, _Functional Field Test; G; G, _Final Acceptance Test,; G; G, _Test Procedures; G; G, _SD-07 Certificates Qualification of Manufacturer; G; G, _ Qualification of Applica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS0175002012STARTINGANDADJUSTINGPDF