REG NASA-LLIS-1879-2008 Lessons Learned - Guidance for NASA Selection& Application of DC-DC Converters.pdf
《REG NASA-LLIS-1879-2008 Lessons Learned - Guidance for NASA Selection& Application of DC-DC Converters.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1879-2008 Lessons Learned - Guidance for NASA Selection& Application of DC-DC Converters.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1879Lesson Info:a71 Lesson Number: 1879a71 Lesson Date: 2008-07-14a71 Submitting Organization: JPLa71 Submitted by: David Oberhettingera71 POC Name: Linda Facto, Jeanette Plantea71 POC Email: Linda.J.Factojpl.nasa.gova71 POC Phone: 818-354-2195 (L. Facto), 301-614-5944 (J. Pla
2、nte)Subject: Guidance for NASA Selection avoid simply derating the device as a “black box.“ 8. Perform Worst Case Analysis (WCA) on DC-DC converters, analyzing not only the total radiation dose but also the enhanced low dose rate and displacement damage effects. 9. Review changes to the design or to
3、 vendor processes that occur after the device is flight qualified, and request an updated analysis or requalification if needed. 10. Verify product data sheet claims regarding device radiation hardness by analysis or test.Device Quality 11. Assure that a customer precap visual inspection is performe
4、d by a properly trained device Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-inspector as these frequently identify defects requiring rework. 12. Perform customer DPA on all non-Class K device lots because some defects occur after device lid sealin
5、g and screening.Device Procurement 13. Selection of a device vendor on the Qualified Manufacturers List is strongly recommended to achieve device quality 14. Because MIL-PRF-38534 has deficiencies even for Class K devices, employ a statement of work (SOW) or source control drawing (SCD) to add custo
6、mer precap visual inspection, capacitor and Schottky diode screening, and periodic MIL-PRF-38534 Group C (especially life test) testing. 15. Plan for converter procurement as long lead time (i.e., greater than 6-month) items because the desired converter will not typically be available from vendor i
7、nventory. 16. Seek to procure high quality devices. The total cost of lower quality, including upscreening and the cost and schedule impact of lot failures on the project, may greatly exceed the initial cost of the higher quality devices. 17. It is vital that the project plan and budget for a monito
8、ring team representing the design engineering, electronic parts engineering, quality assurance engineering, and reliability engineering functions throughout the procurement cycle to resolve issues related to device application or lot failures. Evidence of Recurrence Control Effectiveness: JPL has re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS18792008LESSONSLEARNEDGUIDANCEFORNASASELECTIONAPPLICATIONOFDCDCCONVERTERSPDF

链接地址:http://www.mydoc123.com/p-1019332.html