REG NASA-LLIS-1411-2004 Lessons Learned Actively Manage Flight Project Risks During the Mission Operations Phase (2000).pdf
《REG NASA-LLIS-1411-2004 Lessons Learned Actively Manage Flight Project Risks During the Mission Operations Phase (2000).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1411-2004 Lessons Learned Actively Manage Flight Project Risks During the Mission Operations Phase (2000).pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1411Lesson Info:a71 Lesson Number: 1411a71 Lesson Date: 2004-26a71 Submitting Organization: JPLa71 Submitted by: Allan LeeSubject: Actively Manage Flight Project Risks During the Mission Operations Phase (2000) Abstract: Cassini was one of the first major JPL missions to succe
2、ssfully conduct a risk management program during the Mission Operations and Data Analysis (MO&DA) phase. It was complicated by the distribution of the 500-person MOS Team across the U.S. and Europe, involving over 16 sub-teams, 9 time zones, and ITAR-mandated information exchange limitations. Define
3、 a formal risk management process early in MO&DA that will be tightly scoped to the operational phase of MO&DA. Also manage the human performance risks (fatigue, health, etc.) to mission ops. Select a flexible RM database tool.Description of Driving Event: Cassini is one of the first major JPL missi
4、ons to successfully conduct a risk management program during the Mission Operations and Data Analysis (MO&DA) phase, in addition to the normal system development program. When the risk management program was revived 3 years after the 1997 launch, the Mission Operations System (MOS) Team viewed it as
5、 a new and challenging practice. Implementation was complicated by the distribution of the 500-person MOS Team across the U.S. and Europe, involving over 16 sub-teams, 9 time zones, and information exchange limitations mandated by International Traffic in Arms Regulations (ITAR).Provided by IHSNot f
6、or ResaleNo reproduction or networking permitted without license from IHS-,-,-refer to D descriptionDTo plan the risk management process for MO&DA, training workshops and tutorials were held during 2000, and a risk management plan and schedule were issued in early 2001. Subsequent brainstorming sess
7、ions produced a Significant Risk List (SRL), risk items were sorted by mission phase, and they were documented in an on-line tool and categorized according to likelihood and impact. A Risk Team met quarterly to review the projects risk posture, add risk metrics to the on-line tool, and brief the MOS
8、 Team and NASA. The risk posture was a standard briefing topic at Cassini readiness reviews and monthly management reviews.A key to the success of this program was deferring wider participation until the risk management process was well established and understood by the JPL MOS Team. JPL did not sol
9、icit European Space Agency (ESA) and Instrument Team participation until late 2002, when the on-line tool, initial SRL, and risk performance metrics had already achieved a measure of acceptance at JPL. With these tools in place, changes in the project risk profile became easily visible to the MOS Te
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS14112004LESSONSLEARNEDACTIVELYMANAGEFLIGHTPROJECTRISKSDURINGTHEMISSIONOPERATIONSPHASE2000PDF

链接地址:http://www.mydoc123.com/p-1019050.html