NAVY MIL-V-21701 B-1969 VALVE CHECK OXYGEN MASK INLET《吸进氧气面罩连检验阀》.pdf
《NAVY MIL-V-21701 B-1969 VALVE CHECK OXYGEN MASK INLET《吸进氧气面罩连检验阀》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-V-21701 B-1969 VALVE CHECK OXYGEN MASK INLET《吸进氧气面罩连检验阀》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-V-21703B 16 777770b 0372033 I! 1 1 ,; 3IIL-V-21OlB SUPERSEDING 21 December 1964 26 MARCH 1969 hlI L- V- 2 1 7 O 1 A (ASG) MILITARY SPECIFICATION VALVE, CHECK, OXYGEN MASK, INLET This specification is mandatory for use by all Depart- ments and Agencies of the Department of Defense. 1. SCOPE 1.1
2、 This spccification covers one type ofoxygen misk inlet cli 2. APPLICABLE DOCUMENTS ck valve. 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of the specification to the extent specified herein. SPECIFIC ATIONS Federal BB-A-1034
3、Air , Compressed, for Breathing Purposes BB- N- 41 1 PPP-B-566 Boxes, Folding, Paperboard Nitro gen PPP- B-601 Box, Wood, Cleated-P1prood PPP- B-636 Box, Fiberboard PPP- B-676 Boxes, Setup Military hIIL- P- 116 Preservation, Methods of MI G M- 6 482 Mask Assemblies, Oxygen, Pressure Breathing M 11,-
4、 17- 2 2 1 9 1 Films , Transparent , Flexible, Hcnt Sealable , for lhcl. THIS DOCUbAHkdT .I 7 - -*- - f . . ,;_ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-iITL-V- 2 170 1B SPECIFICATIONS of improper size, location, sequence; or method of applica
5、tion; markings not the same on the interior and ex*erior containers. Any non-conforming coinponent ; any coinponent missing, damaged, or otherwise defective. Inadequate application of the components such as incomplete closure of the unit package, intermediate package, container flaps, loose strappin
6、gs, etc. ; bulging or distortion of the con- tainers. Number per container is more or less than required; gross or net weight exceeds the require- ments. 4.7.2 Leakage - The test fixture (4.6.3) shall be assembled as shown on Figure 1 and installed in test stand shown on Figure 4. Adjust control val
7、ve to prodwe a suction of 1 inch of water on the inlet side of the valve and maintain this condition for a minimum period of 2 minutes. During this period, the leakage through the valve shall be read on the manometer and the valve shall pass the requirements specified in 3.5.1. The test procedure sh
8、all then be repeated utilizing requirements specified in 3.5.1. suction of 13 inches of. water and the valve shall pass the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b MIL-V-237OLB lb M 97q77Ob 0372027 =* MIL-V-2170 1B 4.7.2.1 Upon completion o
9、f test procedures, i permissible leakage limits are exceeded, the valve shall be rinsed in distilled water and then dried thoroughly using clean dry air to remove any lint that may be on the valve seat. The leakage test procedure shall then be repeated. 4.7.3 Pressure drop - The test fixture (4. 6.
10、3) shall be assembled as shown on Figure 1 and installed in test stand shown on Figure 5. Adjust control valve so that a pressure of 10 inches of water shall be applied to the inlet side of the valve and to produce a flow of 50 liters per ininute through the valve in the tiormal direction of flow. T
11、hese conditions shall be maintained for a iiiinimum period of 2 minutes. During this period, the pressure drop through the valve shall be read on the manometer and the valve shall pass the requirements specified in 3.5.2. 4.7.4 Altitude operation - Valves shall be installed in oxygen masks conformin
12、g to MIL-M-6482. The masks shall be worn by 5 subjects and they shall be subjected to simulated flight conditions from sea level to 43,000 feet altitude. During this test, the valves shall pass the requirements specified in 3.5.3. 4.7.5 Low temperature operation - A valve shall be installed in the t
13、est fixture (4.6.3) as shown on Figure 1. The test fixture and valve shall then be placed in a test chamber and conditioned at a temperature of -20 +5“ F for 3 hours. After conditioning, and while still at this temperature, the valve shall be these test procedures, the valve shall be returned to roo
14、m temperature and shall then be subjected to and pass the requirements of the leakage test. subjected to and pass the requirements of the leakage test. Upon completion of 4.7.6 High temperature operation - A valve shall be installed in the test fixture (4* 6.3) as shown on Figure 1. The test fixture
15、 and valve shall then be placed in a test chamber and conditioned at a temperature of +I60 f5 F for 3 hours. After conditioning, and while still at this temperature, the valve shall be subjected to and pass the requirements of the leakage test. Upon completion of these test procedures, the valve sha
16、ll be returned to room temperature and shall then be subjected to and pass the requirements of the leakage test. 4.7.7 Ozone-resistance - The test slabs submitted for qualification . shall be tested for ozone resistance. The test apparatus shall be in accordance with ASTM 3lei.hod No. D1149. The tes
17、t slab;? shall be elongated 20 percent, placed in an ozone-free aliiiosphere for 24 hours, then placed in the ozone chamber. The cliniinbci- sh:ill IJC ndjiisted to 100 I2“ F and to give an exposure of ozone concentra- tim o 13) 10 I)ni.ts by voluine of ozonc! per niillion parts by voluiiio of air,
18、lhc ;iii*-ozwi vttlocty iii Ilil! clininbcr sliall be nt lcasl 2 foc1 pcr iiwond, he mntcrial sliall l)c! i*q)osd to tlicsc condilions loi* ci0 minutes. Uic lest slabs shall then hc osnmiticd iiiiclci. 10s 1ii:ignification and shall pass the requirements specified in 3.5. ci. Provided by IHSNot for
19、ResaleNo reproduction or networking permitted without license from IHS-,-,-L -. - _- MIL-V-23703B 3b 9999706 0392028 T MILV-21701B 5. PREPARATION FOR DELIVERY . 5.1 Packaging - Packaging shall be Level A or C, as specified in the contract or order (see 6.2). 5.1.1 Level A - Unless otherwise specifie
20、d, each valve shall be pre- served aid packaged in accordance with MIL-P-116, Method IC-3. shall be cleaned in accordance with Process C-1 except that cleaning by immersion in solvent shall be prohibited. Immediately after cleaning, the valve shall be sealed within a transparent film bag, minimum fi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILV21701B1969VALVECHECKOXYGENMASKINLET 吸进 氧气 面罩 检验 PDF

链接地址:http://www.mydoc123.com/p-983035.html