NAVY MIL-T-60116-1964 THRUSTER CARTRIDGE ACTUATED M20A1 METAL PARTS ASSEMBLY《M20A1金属零件集合发动弹药筒推进器》.pdf
《NAVY MIL-T-60116-1964 THRUSTER CARTRIDGE ACTUATED M20A1 METAL PARTS ASSEMBLY《M20A1金属零件集合发动弹药筒推进器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-60116-1964 THRUSTER CARTRIDGE ACTUATED M20A1 METAL PARTS ASSEMBLY《M20A1金属零件集合发动弹药筒推进器》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T - 6 O 1 16- ) 17 June 1964 SUPERSEDING FA-PD-MI-2350, Rev. 3 23 November 1962 MILITARY S PEC IFICAT ION THRUSTER, CARTRIDGE ACTUATED METAL PARTS ASSEMBLY 1. SCOPE M20A1 . 1.1 This specification covers Thruster, Cartridge Actuated, M20A1, Metal Parts Assembly. tion with other propellant actuate
2、d devices in aircrew emergency escape systems. The assembly will ultimately be loaded and used in conjunc- 2. APPLICABLE DOCUMENTS 2.1 The following documents .of the issue in effect on date of invitation for bid8 or request for proposals, form a part of this specification to the extent specified he
3、rein. SPECIFICATIONS Mil it,ary MIL-A-2550 MIL-1-45208 - Inspection System Requirements. - Amminition and Special Weapons, General Specificat ion for STANDARDS Military MSL-STD-105 - Sampling Procedures and Tables for Inspection by MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-413 -
4、Visual Inspection Guide for Rubber O-Rings MIL-STD-639 - Surface Roughness Values Preferred for Army Ordnance Attributes Materiel DRAWINGS Munit ions Comnand F10533858 C8797741 - Thruster, Cartridge Actuated, M20A1, Metal Parts - Container, AmmunitLon, Fiber M347 for Thruster, Assembly Cartridge Act
5、utd, U20A1 or E15A3 r - - THIS DOCUMENT ONTAINS 2 y PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-60116 (MU) - - DRAWINGS, Coat. C8797742 IEL-10533858- Inspection Equipment List for Thruster, Cartridge - Box, Packing, Ammunition for Th
6、ruster, Cartridge Actuated M20A1 or M5A3 in Fiber Container B347. Actuated M20A1 (Copies of specifications, standards and drawings required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer,) 3. REQ
7、UIREMENTS 3.1 General - Materials, parts and assemblies shall comply with the requirements specified on the applfcable drawings, referenced specifications and the following: 3.2 Initial production sample - Uniesc otherwise directed by the contract- ing officer, an initial production sample shall be
8、required. 3.3 Material - The contractor shall be responsible for selecting from the classification list contained in the raw material specification, the surface and physical condition of the raw .material intended for use in manufacture. 3.4 Physical Properties - Physical properties required by the
9、drawing shall be uniform throughout the part within specified tolerances. for all alloy steel parts shall be achieved by quenching and tempering. Requirements 3,5 Hydrostatic messure - The body and head shall withstand a constant infernal pressure of 8000 pounds per square inch (psi) minimum, for 15
10、 seconds, mtlnimum, without application of any external load and shall show no evidence of leakage or mechanical failure (see 6.1). 3.6 Structural strength - The assembled thruster shall withstand a static tensile force of 2000 pounds, minimum for 15 seconds, minimum, between mount- ing points witho
11、ut unlocking and without mechanical failure (see 6.1). 3.7 Metal parts assembly - Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. 3.7.1 The head and body assembly and the retainer guide and sleeve assem- bly shall be assembled ha
12、nd tight. 3.7.2 Trunnion rotation - Upon completion of assembly, the trunnion shall be free to rotate 360 degrees. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-60116 (MU) - 3.7.3 End sleeve rotation - Upon completion of assembly and after
13、struc- tural strength test, the end sleeve shall be free to rotate 360 degrees in a clockwise direction. 3.8 Protective finish - Protective finish shall be in accordance with the applicable specifications and drawings and shall apply to all surfaces of the component regardless of contour configurati
14、on. 3.9 Residual mapnetism - The metal parts assembly shall not deflect the indicator of the compass more than 3 degrees in either direction when passed in front of the compass at a distance of 6 inches. Workmanship - The requirements for workmanship are as specified on 3.10 the applicable drawings,
15、 referenced specifications and the following: Metal defects - All components shall be free from cracks, splits, cold shuts, inclusions, porosity or any similar defect. 3.10.2 Burr - No part shall have a burr which might interfere with the 3.10.1 assembly or function of the item or which might be inj
16、urious to personnel handling the item. 3.10.3 Foreinn matter - No part or assembly shall contain chips, dtrt, grease, rust, corrosion or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplie
17、r is responsible for the performance of all inspection requirements specified herein. fied, the supplier may utilize his own facilities or any comercial labora: tory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specification where
18、 such inspections are deemed necessary to assure prescribed requirements. Excep! as otherwise speci- supplies and services conform to 4.1.1 Quality assurance terms and definitions - Reference is made to Standard MIL-STD-109 to define quality assurance terms used, 4.1.2 Inspection - Inspection shall
19、be in accordance with Specifications MIL-A-2550 and MIL-1-45208, except as specified herein. 4.2 Initial production sample.- At the beginning of regular production, the contractor shall submit an initial production sample to a Government approved facility for evaluation. The sample shall consist of
20、5 metal parts assemblies, 10 sets of parts and fifty shear pins fran the same lot of shear pins tested by the contractor. The samples shall be subjected to the tests in 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-b0LLb 13 77777Ob 0335721-
21、b I 4.3.3. Specification MIL-1-45208. manner, using the same materials, equipment, processes and procedures as used in regular production. All parts and materials, including packaging and pack- ing, must be the same as used in regular production and shall be obtained from the same source of supply.
22、The contractor shall inspect the sample in accord- ance with his inspection system and other inspection requirements of Specifica- tion MIL-1-45208. After inspection and provisional acceptance at source, the initial production sample shall be inspected at: the Government approved facility for all re
23、quirements of the drawings and specifications, reserves the right to require new initial production samples until such time as an acceptable sample is submitted. Test procedures shall be in accordance with 4.4, except as prwided in The sample shall be manufactured in the same The Government 4.3 Insp
24、ection provisions 4.3.1 Drawing D10521615 covering a detail of Drawing F10533858. CRITICAL . None defined NAJOR 101. 102 103 104 . 105. 106 . 107 b 108. 109 110. 11 0 112. 113. 114. 115 Pitch diameter of external thread, min. Major diameter-of external thread, min. Pitch diameter of internal thread,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT601161964THRUSTERCARTRIDGEACTUATEDM20A1METALPARTSASSEMBLYM20A1 金属 零件 集合 动弹 药筒 推进器 PDF

链接地址:http://www.mydoc123.com/p-982759.html