BS EN 62382-2013 Control systems in the process industry Electrical and instrumentation loop check《加工工业中的控制系统 电气和测量仪表回路检查》.pdf
《BS EN 62382-2013 Control systems in the process industry Electrical and instrumentation loop check《加工工业中的控制系统 电气和测量仪表回路检查》.pdf》由会员分享,可在线阅读,更多相关《BS EN 62382-2013 Control systems in the process industry Electrical and instrumentation loop check《加工工业中的控制系统 电气和测量仪表回路检查》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationControl systems in the process industry Electrical and instrumentation loop checkBS EN 62382:2013National forewordThis British Standard is the UK implementation of EN 62382:2013.
2、 It is identical to IEC 62382:2012. It supersedes BS EN 62382:2007 which is withdrawn.The UK participation in its preparation was entrusted to Technical CommitteeAMT/7, Industrial communications: process measurement and control, including fieldbus.A list of organizations represented on this committe
3、e can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions of acontract. Users are responsible for its correct application. The British Standards Institution 2013Published by BSI Standards Limited 2013ISBN 978 0 580 72587 6ICS 25.040.40Comp
4、liance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of the StandardsPolicy and Strategy Committee on 31 March 2013.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 62382:2013EUROPEAN ST
5、ANDARD EN 62382 NORME EUROPENNE EUROPISCHE NORM March 2013 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Avenue Marnix 17, B - 1000 Brussels 2013 CENELEC - All rights
6、 of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62382:2013 E ICS 25.040.40 Supersedes EN 62382:2007 English version Control systems in the process industry - Electrical and instrumentation loop check (IEC 62382:2012) Systmes de commande pour les proc
7、ds industriels - Contrle de boucle des circuits lectriques et des appareillages (CEI 62382:2012) Leittechnische Systeme in der verfahrenstechnischen Industrie - PLT-Stellenprfung (IEC 62382:2012) This European Standard was approved by CENELEC on 2012-12-13. CENELEC members are bound to comply with t
8、he CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Manageme
9、nt Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the sam
10、e status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lit
11、huania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 62382:2013EN 62382:2013 - 2 - Foreword The text of document 65E/271/FDIS, future edition 2 of IEC 62382, prepared by SC 65E “Devices and
12、 integration in enterprise systems“ of IEC/TC 65 “Industrial-process measurement, control and automation“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 62382:2013. The following dates are fixed: latest date by which the document has to be implemented at national level
13、by publication of an identical national standard or by endorsement (dop) 2013-09-13 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2015-12-13 This document supersedes EN 62382:2007. EN 62382:2013 includes the following significant technical chang
14、es with respect to EN 62382:2007: - The definition of the documents mentioned in the standards is in accordance with EN 62708 1): Documents for electrical and instrumentation projects in the process industry. - Subclause 6.3 has been revised. Attention is drawn to the possibility that some of the el
15、ements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 62382:2012 was approved by CENELEC as a European Standard without any modificatio
16、n. 1)Under consideration. BS EN 62382:2013- 3 - EN 62382:2013 Annex ZA (normative) Normative references to international publications with their corresponding European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its
17、 application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD appli
18、es. Publication Year Title EN/HD Year IEC 61131 Series Programmable controllers EN 61131 Series IEC 62337 - Commissioning of electrical, instrumentation and control systems in the process industry - Specific phases and milestones EN 62337 - IEC 62424 - Representation of process control engineering -
19、 Requests in P it is the last systematic check before mechanical completion to ensure that: all E all instrumentation and equipment is delivered according to the design specifications if not already verified during FAT or quality check during equipment receiving; installation has occurred in accorda
20、nce to engineering documents, applicable codes and local regulations; loop functionality is correct. This provides that: in a project, the quality check for E the base for the commissioning phase which consists of the following phases: a) cold commissioning phase during which functional testing of e
21、quipment and facilities, using test media such as water or inert substances, takes place; b) hot commissioning (chemical start-up) phase during which activities associated with the testing and operation of equipment using the actual process chemicals (initial start-up of process) are performed. The
22、main activities in the cold and hot commissioning phases are system verification tuning of loops and instruments and control schemes. 5 Loop check content 5.1 Included activities The loop check includes the following elements of a “single loop“ (sensor and/or actuator). Hardware components: the inst
23、alled instruments or components in the field or in their final destination; IEC 2057/06 BS EN 62382:2013 10 62382 IEC:2012 the equipment in E hard wired functionality between sensor and actuator loops (if applicable); the input and output (if applicable) cards of process control systems. The basic s
24、oftware components (including the graphic faceplates, base level alarms and switch points, basic interlocking and basic analogue control) to test the field devices. The loop check uses the basic graphics/faceplates of the control system (see Figure 2). Note that primary inputs and outputs may be con
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN623822013CONTROLSYSTEMSINTHEPROCESSINDUSTRYELECTRICALANDINSTRUMENTATIONLOOPCHECK 加工工业 中的 控制系统 电气

链接地址:http://www.mydoc123.com/p-578437.html