NAVY MIL-STD-7080-1994 SELECTION AND INSTALLATION OF AIRCRAFT ELECTRIC EQUIPMENT《飞机电气设备的选择和安装》.pdf
《NAVY MIL-STD-7080-1994 SELECTION AND INSTALLATION OF AIRCRAFT ELECTRIC EQUIPMENT《飞机电气设备的选择和安装》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-7080-1994 SELECTION AND INSTALLATION OF AIRCRAFT ELECTRIC EQUIPMENT《飞机电气设备的选择和安装》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、 _ INCH-POUND IMIL-STD-708031 May 1994SUPERSEDING “MIL-E-7080BAmendment 428 February 1992MIL-E-7080B6 June 1962MILITARY STANDARDSELECTION AND INSTALLATIONOF AIRCRAFTELECTRIC EQUIPMENTAMSC N/A FSG 16GPDISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.Provided by IHSNot
2、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-7080FORWARD1. This military standard is approved for use by all Departments and Agencies of theDepartment of Defense.2. Beneficial comments (recommendations, additions, deletions) and any pertinentdata which may b
3、e of use in improving this document should be addressed to: Naval AirWarfare Center Aircraft Division (SY60), Patuxent River, Maryland 20670-5304 by usingthe self-addressed Standardization Document Improvement Proposal (DD Form 1426)appearing at the end of this document or by letter.iiProvided by IH
4、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- .MIL-STD-7080CONTENTS1. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5、. . . . . . . . . . . . . . . . . . . .2. APPLICABLE DOCUMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.12.23.3.13.23.33.43.53.63.73.83.93.103.113.123.133.143.153.16Government documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.1.1 Sp
6、ecifications, standards and handbooks. . . . . . . . . . . . . . . . . . . .2.1.2 Other Government documents, drawings, andpublications. . . . . . .Order ofprecedence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . .
7、 . . . . . . . . . . . . . . . . . . . . .Constant input speed ac generator. . . . . . . . . . . . . . . . . . . . . . . . . . . .Constant speed drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Converter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8、 . . . . . . . . . . . . . . . .Cycloconverter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Dc generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .De-link . . . . . . . . . . . . . . . . . . . . . . . . . . .
9、. . . . . . . . . . . . . . . . . . . . . . . .Differential faultprotection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Electric equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Integrated drive generator. . . . . . . . . . . . . . . . .
10、. . . . . . . . . . . . . . . . .Inserter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Main bus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Power controller. . . . . . . . . . . . . . . . . . .
11、 . . . . . . . . . . . . . . . . . . . . . . .Powersource. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Utilization equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Utilization equipment terminals. . . . . . . . . . . .
12、. . . . . . . . . . . . . . . . . .Variable input speed ac generator. . . . . . . . . . . . . . . . . . . . . . . . . . . .4. GENERAL REQUIREMENTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.14.24.34.44.5Materials, parts andprocesses. . . . . . . . . . . . . . . . . . .
13、 . . . . . . . . . . . .4.1.1 Selection. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.1.2 Metals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.1.3 Non-metals. . . . . . . . . . . . . . . . . . . . . . . . . . .
14、. . . . . . . . . . . . . . .4.1.4 Finishes, coatings andsealants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.1.5 Workmanship. . . . . . . . . . . . . . . . . . . . . . . . . . . .
15、 . . . . . . . . . . . .Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.2.1 Government-furnished. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.2.2 Contractor-furnished. . . . . . . . . . . . . . . . . . . . . . . . . .
16、. . . . . . . . .Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Identification ofequipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Grounding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17、 . . . . . . . . .4.5.1 Grounding receptacles. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.5.2 Fuel nozzle grounding. ,. . . . . . . . . . . . . . . . . . . . . . . . . . . .4.5.3 Static ground . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18、1111111344444444445555555555555666666667777Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-STD-70804.5.4 Current returns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ”.”.” . 74.5.5 Internally grounded equipment. . . . . . . . . . . .
19、 . . . . . . . . . . . . . . . 74.5.6 Switchgear ewes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74.5.7 Bonding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .”.”-” -“”- 84.6 Electromagnetic compatibility. . . . . . . . . . . . . . . . . . . . . . . . .
20、 . . . . . . 84.6.1 Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . .”.”-.”.” “” 84.7 Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . ” . ” ” . . ”.”. “-”.” 84.7.1 Mounting hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84.7.2 Mountingho
21、les. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84.7.3 Safetying . . . . . . . . . . . . . . . . . . . . . . . . .” “” 84.7.4 Shock-mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94.8 Location. . . . . . . . . . . . . . . . . .
22、 . . . . . . o.”.”.0”.o” “. 94.8.1 Clearance. . . . . . . . . . . . . . . . . . . . . . ” . . ” . . . . ” ”.”. “.”- 94.8.2 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94.8.3 Physical protection . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23、. . . . . . . . . 94.8.4 Environment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.8.5 Vulnerability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.8.6 Power panels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 . . . . . . . . . 104.9 Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.9.1 Power feeder size . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104.9.2 Overcurrent protecttin . . . . . . . . . . . . . . . . . . .
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD70801994SELECTIONANDINSTALLATIONOFAIRCRAFTELECTRICEQUIPMENT 飞机 电气设备 选择 安装 PDF

链接地址:http://www.mydoc123.com/p-982465.html