NAVY MIL-STD-1323-239 A-1988 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB GENERAL PURPOSE 500 LB MK 82 MOD 2 (THERMALLY PROTECTED) AND BOMB BDU-45 B INERT LOADED (THERMALLY PROTECTED)623.pdf
《NAVY MIL-STD-1323-239 A-1988 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB GENERAL PURPOSE 500 LB MK 82 MOD 2 (THERMALLY PROTECTED) AND BOMB BDU-45 B INERT LOADED (THERMALLY PROTECTED)623.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-STD-1323-239 A-1988 UNIT LOAD FOR UNDERWAY REPLENISHMENT BOMB GENERAL PURPOSE 500 LB MK 82 MOD 2 (THERMALLY PROTECTED) AND BOMB BDU-45 B INERT LOADED (THERMALLY PROTECTED)623.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-STD-1323 -237A 1 = 7777733 0073484 1 s - 37- 0 p MILITARY STANDARD M IL-ST D-132 3 -2 39A (NAVY) 11 JANUARY 1988 M1L-STD-1323-231 _ UNIT LOAD FOR UNDERWAY REPLENISHMENT BOM6,GENERAL PURPOSE: 500 LB MK 82 MOD 2 (THERMALLY PROTECTED) 29 JUNE 198l AND BMBrBDU-45/B, INERT LOADED, (THERMALLY PROTECTE
2、D) ON PALLET, LOADING AND STORAGE (MHU-l22/E, DL 623AS100, AND MHU-l22A/E, DL 623AS200) LIK 82 MOD 2 BOU-4518 UNIT LOAD DATA DODICIMALC NO. E488 Fol9 NUMBER OF BOMBS PER UNIT LOAD. GROSS WEIGHT OF ONE CONTAINER 485 LBS WEIGHT OF BOMB PALLET 170 LBS WEIGHT OF STEEL STRAPPING. 13 LES GROSS WEIGHT OF U
3、NIT LOAD . 3.093 L8S WEIGHT OF BOTTOM FRA ME 108 LBS CUBE 36.1 CU FT BOMB,GP, 500 LB, MK 82 MOD 2 (THERMALLY PROTECTED) 30003-4902353 . . DO NOT USE FOR SHIPPING WEIGHT DO NOT STACK MORE THAN 6 UNIT LOADS HIGH IN STORAGE VICATION (MK 82 MOD 2 ONLY) WT . CLASS A CG. . CLASS X-A MSC NO, - N/A APPROVED
4、 FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED NOTES: L. UNLESS OTHERWISE SPECIFIED. DIHEWSIONS ARE IN INCHES. CLARIFIED STRAPPING PROCEDURE ADDED EXTRA TAIL, STRAP. ITEM 6. TO PREMMT RO- 2. FOR CROSS REFERENCE TO ASSOCIATED TRUCKLOADIWG. TATIOI OF OUT OF TOLER- CONTAIIIERLOADING AND CARLOADING MILI
5、TARY STANDARDS. ANCE BOMBS I . REFER TO INDEX TO STANDARDS MIL-HDBK-236 (NAVY). EV TOA I SYSCOM TR REVISION DESCRIPTION DATE APPROVAL I FSC 8140 THIS UNIT LOAD IS AUTHORIZED AND RELEASED FOR SHIPPING,HANDLING SIORAGE ANC TRANSFER-AT SEA. Ir MAY ALSO EL USEE FOR REQUIREMENTS FOR CONSTRUCTION OF THIS
6、UNIT LOAD SHALL CONSIST OF THIS DOCUMENT AND THE LATEST ISSUE DOMEjTIC SHIFMWAIN CGMPLIAkCE WITH COT REGULATIONS. OF MIL-STD-1323 (NAVY). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- NIL-STD-lt323 -239A 83 99999LL O073485 3 MIL-STD-1323-239A (NAV
7、Y) PALLETIZING PROCEDURE (A) POSITION THE LONGITUDINAL STRAPPING, ITEM q. UNDER THE NOTCHED SECTIONS OF THE BOTTOM FRAME. (BI PLACE THREE BOMBS ON THE BOTTOM FRAME. ITEM 1. WITH THE FORWARD END OF THE BOMBS ON THE FORWARD END OF THE FRAME. OF THE LUGS SHOULD BE PARALLEL TO THE LONGITUDINAL AXIS OF T
8、HE BOMB. POSITION, THEY WILL FIT ON THE OUTSIDE OF THE CENTER HAT SECTIONS ANO THE BOMBS MUST BE TURNE0 SO THAT THE LUGS WILL BE IN THE 5 OR 7 OCLOCK POSITION. POSITION THE INTERMEDIATE FRAME. ITEM 2. ON ?HE FIRST ROW OF EMBS. VERTICAL TO THE CENTER HAT SECTIONS OF THE BOTTOM FRAME. SEE VIEW B-B. PO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILSTD1323239A1988UNITLOADFORUNDERWAYREPLENISHMENTBOMBGENERALPURPOSE500LBMK82MOD2THERMALLYPROTECTEDANDBOMBBDU45BINERTLOADEDTHERMALLYPROTECTED623PDF

链接地址:http://www.mydoc123.com/p-982147.html