NAVY MIL-S-23895-1964 SHACKLE BOMB MARK 8 MOD 5《MARK 8 MOD 5炸弹束缚》.pdf
《NAVY MIL-S-23895-1964 SHACKLE BOMB MARK 8 MOD 5《MARK 8 MOD 5炸弹束缚》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-S-23895-1964 SHACKLE BOMB MARK 8 MOD 5《MARK 8 MOD 5炸弹束缚》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、15 JANUARY 1964 MILI TAlX SPECIFIC AT1 OF1 - # i -_ -_ - SHACYZZ, BOHB, YAREwing tests specified in Specification mL-T-77/13. a. Physical characteristics h. Manual operation . c. Lag or time sf release determination . Performance under icing conditions e. Life test f. Shock test g. Vibration test h.
2、 Static test (as modified by 4.6.4) i . (1.6.1 Bomb shackle static tes The conipleteiy assembled bomb shackle shall he subjected to the fkllowing ultimate loads, each load to be applf ed separately in the direction noted: 3 f Y d 2P ,000 pminds Vertically down 12,Wc pounds Vertically up Fi, 50R poun
3、ds Lmgi t:idinal ly forward 8 5“ pounds Longitudinally aft 4.6.5 Ilmk ultimate loati test - The hmk shall be attached to the test fjxture speciPied in 4*51 and siibjected to a vertlcally down laad to destriictinn. The. hook shall not fail below the ultimate load rf 131CP.fi pounflc. 4.e.0, IIonk dyn
4、amic load test - The hook shall be attached to the test fixiture as describedin45J.The hook shall be subjected tr 25,OW dynamic loading cycles with loads beginning at 2,250 p3unds, increasing to 7,750 pgunds and rediiced to 2,250 pniiritis during each cycle. be 180or 3600 cycles per minute. The load
5、-time curve shall be equivalent to that produced by the Sonntag fatigue testing machine. fail below 25,ciOC cycles. The cyclic ratesball The hook shall not Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-S-23895 10 m 9999906 0303905 T - _ MIL-W-
6、23895 EP) 4.7 Re.iections - 4.7.i Quality conformance inspection lot sample - The failure of any Inspection lot sample to pass the inspections outlined in this *specification shall cause tentative rejection of all shackles or .hooks represented by that sample, subject to retest as hereinafter provid
7、ed. 4.7.2 Individual re.iection; - The failure of any shackle, any hook, any piece, sub-assembly, or assembly of same to pass the individual inspections outlined in 4.4.1 shall cause its tentative rejection, subject to retest as hereinafter provided, 4.7.3 Balvaaed pieces - Any piece(s) from a rejec
8、ted shackle may be salvaged for use providing each salvaged piece is inspected, and is found to he in complete compliance with the requirements of this specification and the applicable drawings, 4.8 ReinsDection - 4.8.1 Inspection lot samples - first retest - In the event any sample representing an
9、inspection lot fails to pass the inspection outlined herein, the contractor shall have the opportunity of reworking the entire affected lot and resubmitting to retest twice as many samples, selected at random. inspection, the lot represented thereby shall be considered acceptable. Should any of thes
10、e samples fail, the entire lot represented thereby shall be rejected. Should all of these samples pass the required 4.8.2 Inspection lot samiles - second retest - If, in the contractors opinion, the failure of the retest samples is due to a remed- iable defect, the contractor may, at the discretion
11、of the Naval inspector, be offered the opportunity of reworking the entire affected lot and re- submitting to a second retest three times as many samples, selected at random, as originally submitted-for the lot. Should all of these samples pass the required tests, the lot represented thereby shall b
12、e considered acceptable. Should any of these samples fail, the entire lot represented thereby shall be finally rejected. 8. - . .-. .- . . . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-23875 LO 7777706 0303706 L = I JI I L-s - 2 3 Q n 5 (VE
13、 P )- 4,s. 3 Tnsnection suhseauent to deliverv - Anv r)r all shackles may be subject to inspection for conformance with the requirements of tk-if? speci ficatinri and applicable drawings after deliverv tn the Gwernment. 5, PREPARATI OX FOR DELIVERY 5.1 Preservati on and wickad RE: - 5.1.1 Level A -
14、The bomb shackle shall he preservei1 and packaged in accordance with Specification hlIL-P-f936, Level A, shall conform to Specification hlII.-P-16, llethod III. The packaging methnd 5.1,2 Level C - Preservation and packaging shall conform tr, Specification. MIL-P-7938, Level C. 5.2 Packinq - 9.2.1 L
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILS238951964SHACKLEBOMBMARK8MOD5MARK8MOD5 炸弹 束缚 PDF

链接地址:http://www.mydoc123.com/p-981601.html