NAVY MIL-C-14242 B-1967 CABLE ASSEMBLIES FUZE CONTROL《引信控制电缆组件》.pdf
《NAVY MIL-C-14242 B-1967 CABLE ASSEMBLIES FUZE CONTROL《引信控制电缆组件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-14242 B-1967 CABLE ASSEMBLIES FUZE CONTROL《引信控制电缆组件》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-14242B 13 797770b 0276071 5 3 y/ y!?,. 20 April 1967- S up ers e ding See Section 6 _I_c_c - -_ - - MIL-C-14242B (MU) MILITARY- SPECIFICATION FOR CABLE ASSEMBLIES, FUZE CONTROL 1. SCOPE 1.1 This specification covers the following electrical cable assemblies for bomb fuze control: M4 8 (T8) M4
2、9 (T15) Paper, Gummed (Sealing and Securing) Military MIL-B-117 - Bags and Sleeves, Interior Packaging MIL-A-2550 MIL-TA5422 MIL-1-45208 - Inspection System Requirements and Appendix A to - Ammunition and Special Weapons : General Specification for - Testing, Environmental, Aircraft Electronic Equip
3、ment MIL-1-45208 Quality Assurance System (see 6.4) STANDARDS MIL-STD-129 MIL-STD-202 MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance MIL-STD-1167 - Ammunition Data Card MIL-STD-1169 MIL-STD-1235 - Marking for Shipment and Storage - Test Methods for Electronic and Electrical Co
4、mponent Parts Tests for (Test 106 and Test 119) - Packaging, Packing and Marking for Shipment of Inert Ammunition Components - Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes THIS DOCUMENT CONTAINS /y PAGES. c . -. - / - -1 - _=_i _L_ - =L r i t - .- - -
5、-1- R -i-=- - _ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_I_.-.- ILs_ - flIL-C-Lq242B 13 = 79777Ob 0276072 7 MIL- C- 142 42B (MU) r DRAWINGS Army Materiel Command EPL-10965760 - Engineering Parts List - Cont Fuze Control M73C t - Cab1 embly -
6、EPL-7542941 EPL- 75 42 96 4 EPL-7542942 EPL-7542965 EPL- 75 42 96 6 EPL- 7 5 4 29 6 7 EFL-754 2 96 8 IEL-7542941 - Engineering Parts List - Contents - Cable Assembly - Fuze Control M48(T8) .- Engineering Parts List - Contents - Cable Assembly - Fuze Control M49(T15) - Engineering Parts List - Conten
7、ts - Cable Assembly - Fuze Control M50(T16) - Engineering Parts List - Contents - Cable Assembly - Fuze Control M71 (T26) - Engineering Parts List - Contents - Cable Assembly - Fuze Control M72 (T32) - Engineering Parts List - Contents - Cable Assembly - Fuze Control M73(T27) - Engineering Parts Lis
8、t - Contents - Cable Assembly - Fuze Control M7-4 (T28) - Index to List of Inspection Equipment for Cable Assembly M48(T8), M49(T15) , M71(T26) , M73(T27) , M74(T28, M72(T32) , M50(T16) ,M73C, (Copies of specifications, standards, drawings, and publications required by suppliers in connection with s
9、pecific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) 3. REQUIREMENTS 3.1 Samples. 3.1.1 First article approval sample. Prior to the start of regular produc- tion except where a new contract follows within 90 days production of acce
10、p- table material of identical design, the contractor shall manufacture and submit a sample of 300 cable assemblies and parts as shown in figure 1, using as far as possible the methods and processes proposed for quantity production. However, any deviation from these methods and processes shall be do
11、cumented and submitted with the first article approval sample. The sample shall conform to the require- ments of this specification. Additional samples that may be required because of failure of .the sample to meet the requirements of this specification shall be supplied by the contractor at his exp
12、ense. Until the first article approval sample is approved, further production will be at the risk of the contractor and the Government will not proceed with inspection for acceptance of the pro- duction lots until this approval has been obtained. 3.1.2 Supplemental samples. Prior approval of the pro
13、curing activity shall be required whenever there is a change in design, material, or process which affects safety, operability, or interchangeability as defined by the Classifi- cation of Defects. rest with the Government. The decision for requesting a supplemental sample shall 2 Provided by IHSNot
14、for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-14242B (MU) 3.1.3 Engineering control sample. Ten cable assemblies selected at random from each accepted lot or selected as specified by the Technical Agency shall be shipped within two working days to the Technical
15、 Agency designated by the procuring activity. 3.2 Materials, design and construction. The device shall be in accordance with this specification and the documents referenced in section 2. 3.3 Performance requirements. 3.3.1 Insulation resistance. The insulation resistance for any one con- ductor of t
16、he cable assembly shall be not less than 200 megohms when 500 volts direct current (dc) is applied between any conductor and all other conductors shorted together. 3.3.2 Continuity. The resistance of any one conductor of the cable assembly shall be not more than one ohm. 3.3.3 Pull. There shall be n
17、o mechanical or electrical failure of the cable assembly when a force of 30 pounds is applied to the plug tip while the plug is held by the ground contact. 3.3.4 Extreme temperature. The cable assembly when subjected to each of the extreme temperatures of -65OF(-54OC) and 16OoF(7l0C) for not less th
18、an four hours shall meet the-requiremenk of 3.3.2. and the insulation resistance shall be not less than 20 megohms. 3.3.5 Temperature cycling. The cable assembly after exposure to five temperature cycles between the limits of 16O0F(7I0C) and -65OF(-54OC) shall meet the requirements of 3.3.2 and the
19、insulaton resistance shall be not less than 20 megohms. 3.3.6 Salt spray. The cable assembly after exposure to salt spray for 50 hours shall meet the requirement of 3.3.2 and the insulation resistance -shall be not ,less than 20 megohms. 3.3.7 Humidity. The cable assembly after exposure to ten humid
20、ity cycles between the limits of 100F(380C) and 160F(710C) at a relative humidity greater than 95 percent shall meet the requirement of 3.3.2 and the insulation resistance shall be not less than 20 megohms. 3.3.8 Salt immersion. The cable assembly after the receptacle has been immersed in a salt sol
21、ution for a period of 24 hours shall meet the require- ment of 3.3.2 and the insulation resistance shall be not less than 20 megohms. 3.3.9 Accelerated aging. The cable assembly after exposure to 1,000 fifteen-minute cycles in a vacuum-steam-pressure chamber which simulates tropical conditions shall
22、 meet the requirement of 3.3.2 and the insulation resistance shall be not less than 20 megohms. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-c-
23、LWZB 13 939990b 0296075 2 m MIL- C- 142 42B (MU) a. Accepted, provided recommended changes are made by the contractor prior to the start of regular production. b, Rejected, and new samples for approval required for the tests failed. c. Rejected, and a complete new first article approval sample requi
24、red for approval. In all cases, the contractor shall comply with any required changes to the satisfaction of the Government in future production. I 4.3.1.1 Reinstitution of tests. Acceptance of the first article approval sample does not relieve the contractor from meeting all requirements of this sp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC14242B1967CABLEASSEMBLIESFUZECONTROL 引信 控制 电缆 组件 PDF

链接地址:http://www.mydoc123.com/p-977336.html