NAVY DOD-STD-2185-1986 REQUIREMENTS FOR REPAIR AND STRAIGHTENING OF BRONZE NAVAL SHIP PROPELLERS《铜海军船推进器修复及矫正要求》.pdf
《NAVY DOD-STD-2185-1986 REQUIREMENTS FOR REPAIR AND STRAIGHTENING OF BRONZE NAVAL SHIP PROPELLERS《铜海军船推进器修复及矫正要求》.pdf》由会员分享,可在线阅读,更多相关《NAVY DOD-STD-2185-1986 REQUIREMENTS FOR REPAIR AND STRAIGHTENING OF BRONZE NAVAL SHIP PROPELLERS《铜海军船推进器修复及矫正要求》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、NOTE: DOD-STD-2185 has been redesignated as a Standard Practice. The cover pagehas been changed for Administrative reasons. There are no other changes tothis Document.DOD-STD-2185(SH)28 OCTOBER 1986SUPERSEDINGNAVSEA 0991-LP-023-300215 July 1982(See 6.4)AMSC N/A FSC 2010DISTRIBUTION STATEMENT A. Appr
2、oved for public release; distribution isunlimited.DEPARTMENT OF DEFENSESTANDARD PRACTICEREQUIREMENTS FOR REPAIR AND STRAIGHTENINGOF BRONZE NAVAL SHIP PROPELLERSProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-00D-STD-2185(SH)28 October 1986DEPARTMENTOF
3、TRS NAVYNAVAL SEA SYSTEMS COH?IANDWashington,DC 20362-5101.Requirementsfor Repair and Straighteningof Bronze Navel Ship Propellers1. TIIisKilitary Standard is approved for use by the Naval Sea SystemsCommand,Departmentof the Navy, and is available for use by all Departmentsand Agenciesof the Departm
4、entof Defense.2. Beneficialcomments (recommendations,additions,deletions)and any pertinentdata which may be of use in improving this document should be addressedto:Commander,Naval Sea Systems Commend, SI?A5523, Departmentof the Navy,Washington,DC 20362-5101by using the self-addressedStandardizationD
5、ocumentImprovementPropoeal (DD Form 1426) appearing at the end of this document orby letter. iiProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-000-S20-2185(SH)28 October 1986FORSWOSO1. This standard contains informationand requirementsfor the repair of
6、“_liioiiZe-Naval SM-Ppropellers.“- “ “ -.-./-and CaacingInspectionand Sepair for Machinery, PipingandPreaaureVeaaels in Ships of the United StatesNW y.2.1.2 Dther Government publication. Itrefollowingother Cevernmentpublicationsform a part of this standard to the extent specified herein. ,.Provided
7、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-OOD-STD-2185(St)28 October 1986PUBLICATIONSNAVAL SEA SYSTEMSKNAND (NAVSEA)0900-LP-003-8000- Metals, Surface InspectionAcceptanceStandards.O944-LP-OO7-4O1O- Marine Propellers.(Cepies of specifications,standards,and
8、 publicationsrequiredby con-tractorsin connectionwith specific acquisition functionsshould be obtainedfrom the contractingactivityor as directed by the contractingofficer.)2.2 Other publication. The follotingdocuments form a part of this stan-dard co the extent apeclfiedherein. Unle8a otherwise spec
9、ified,the iasuea ofthe dncumentawhich are OeD adnpted shall be those listed in the issue of theOeDISS specified in the solicitation. lheiasuea of documents which have notbeen adopted shall be those in effect on the date of the cited.MDISS.AKERICAN BURSAU OP SHIPPING (AM)Guidance Manual for Bronze an
10、d StainlesaSteel PropellerCaacimg.(Applicationfor coplea should be addreaaed tn the American Bureau ofshipping,65 Broadway, New York, NY 10006. )AKSRICAN WELDING SOCIETY (AWS)A2.6 - Symbols for Welding and NondestructiveTestingIncludingBrazing. (DoD adopted)A3.0 - StandardWelding Terms and Definitio
11、nsIncludingTerms For Brazing, Seldering,Therm82 Spraying,and Thermal Cutting. (DOD adopted)A3.7 - Specificationfor Capper and Coppar AUoy BareWelding Rods and Electrodes. (OOD adopted)A.5.27- Specificationfor Capper and Copper Alloy Soda fnrCmyfuel GM Weldfq.M .0 - StandardHethoda for MechanicalTest
12、ing of Welds.(OeD adopted)(Applicationfor copies should be addtesaed to the AmericanWeldingSnciety, Inc., 550 NW l.eJeuneRoad, P.o. Box 351040, mad, Pf.33135.)(Noegovernmentatandardaare generally available for referencefremlibrariea. I?ieyare also distributed among nongovernmentatandardabediea andus
13、ing Federal agenciea.)thiscake2.3 Order of precedence. In the event of a conflict between the taxt ofstandard and the referencescited herein. the text of thie standardshallprecedence.3. DEFINITIONS3.1 General cept as notedher%ioVFLM$PS Q.PmePclatureaq definiS!O.Ea.shall conform to AWS A2.b and AWS A
14、Z.0”.I2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-CX30-STO-2 185( SH)28 October 19863.2 Oefinitions. IIIefollowingdefinitions are applicableto this standard:(a) Acceptable. AcceptableBhall mean complieswith or conforms tothe applicablestandardor s
15、pecification.(b) Activity. h activity is the physical plant of an organizationperformingwork in accordancewith a contract specificationwhich referencesthis document.(c) Approved (approval). Approved (or approval)shall mean thatthe item under considerationhas been approvedby NAVSP.Aorits authorizedre
16、presentative. Unlessotherwise specified,aPPrOWl or approvedas used herein shall be by the authorizedrepresentative.(d) NAVSEA authorizedrepresentative. Ihe NAVSSAauthorizedrepre-sentative shall be the Government representativespecificallyauthorized co approve equipment,materials,or procedureswithin
17、the ecope of this standard for NAVSSAand who is listedas follows:(1) Naval ShipyardCommanders.(2) Supervisorsof Shipbuilding(SUPSHIP).(3) CommandingOfficer,Naval Ship SystemsEngineeringStation (NAVSSES).(6) Naval Ship Sepair FacilitiesCommander.(5) Delegated representativesof these authorities.(6) R
18、epresentativesspecificallyauthorizedby NAVSEAon a case by case basis.(e) Cavitationerosion. Cavitationerosion 1s erosion reeulcingfrom the rapid formationand collapse of water vapor bubbleson metal surfacesduring high relativemotion of che propellerwhich results in a porous, spongy, and pittedmetal
19、surface.Metal surface areas with heavily concentratedporosity,andconcentratedporosityassociatedwith cavitatederoded areas,are to be interpretedand treatedas part of the cavitationerosion effect.(f) Propellerdefinitions.(1) Pressure foce. me pressure or aft face-ofthepropellerblade is che blade surfa
20、ce that is usuallyadjacent to the aft end of the hub. The aft end of .the hub is readilyidentified by the small end ofthe taper bore and reduced hub outside diameter.(2) Suction face. The suction or forward face (sometimesreferred to as the back) is the blade surface that isusually adjacent to the f
21、orward end of the hub. Theforward end of the hub 18 readily identifiedby thelarge end of che taper bore, a large hub outside dia-meter and in ne?t cases a bore recess in the forwardface to receive the shaft sleeve, gland ring, and seal.(-.3Provided by IHSNot for ResaleNo reproduction or networking p
22、ermitted without license from IHS-,-DOD-STO-2185(SH)2however, forprocedurequalified on teet place thickneaa 1-1/2 inches orgreater, the procedure is qualifiedfor all thickneeaea.(c) The qualificationteat aeaembly shall be of sufficientsize toparmit removal and testing of two tranavareetensile apecim
23、eos(see AWS S4.0), four side bend specimens (see AWS S4.0) adwe tranaveraemacrospecimens. The acceptancecriteria shallbe in accordancewith FIIL-STD-248except that the tensilespecimensehell meet the strength requirementsof table Iherein for the material qualified. Send specimen failuremaynot necessar
24、ilydisqualify a vald procedura. Send specimenfailure shall be reported to NAVSSA for consideration.(d) tic weld proced.reaqualified with a 600 degreea Fahrenheit (“F)preheat qualify for repair welding at a minimum of 300”F preheat./6IProvided by IHSNot for ResaleNo reproduction or networking permitt
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYDODSTD21851986REQUIREMENTSFORREPAIRANDSTRAIGHTENINGOFBRONZENAVALSHIPPROPELLERS 海军 推进器 修复 矫正 要求 PDF

链接地址:http://www.mydoc123.com/p-976753.html