NASA NACA-TM-952-1940 Standards for discharge measurement with standardized nozzles and orifices《标准化喷嘴和孔口的流量测量的标准》.pdf
《NASA NACA-TM-952-1940 Standards for discharge measurement with standardized nozzles and orifices《标准化喷嘴和孔口的流量测量的标准》.pdf》由会员分享,可在线阅读,更多相关《NASA NACA-TM-952-1940 Standards for discharge measurement with standardized nozzles and orifices《标准化喷嘴和孔口的流量测量的标准》.pdf(120页珍藏版)》请在麦多课文档分享上搜索。
1、TECHNICAL MEMORANDUMSNATIONAL ADVISORY COMMITTEE FOR AERONAUTICS7No. 952University of MarylandGlenn L. Martin L_o!t_-_it,_L_ol a ySTANDARDS FOR EISCHARGE M2ASUREMENT WITHSTANAR.DIZE_ NOZZLES AND ORIFICESGerman Industrial Standard 1952Fourth EditionVDI-Verlag. G.m.b.H., Berlin, 1937mWashingtonSeotemb
2、er 1940Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-zLProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-IPREFACE TO THE _._IRD EDITI0_*The third edition of the Stand_rds has been _c,vi,odon the basis
3、 of new knowledge which h_%s been collectedthrough application of the first two editions to practice,The construction of the Standards is now clearly di-vided into definitions of standardized de_:ign?_ of throt-tlin devices and their standardized installations, andguiding information which is to be
4、considered v:hen devi_-tions from the standardized ma_ufacture or the standard-ized installation occur. Throu O.f upto m = ?.64. These investi,_atio!_s have shown ths, t thedi_char 0._5 are lower than ._iv?nin the first and second editions, and thst the basic tol-erance for m is to be increased for
5、high values of m.Figure 2, Data Sheet i. shows the desi;_n of the standardnozzle for m 0.45, and Data Sh_et 5 _ives the new ,AiT-charge coefficients 2 ,-74_.%,072A“0Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo repro
6、duction or networking permitted without license from IHS-,-,- VTA_ DA,DSC. SUPPLEMENTARY I:IFORMATION ON THE S _“ _ I. Effect of differences from the stand,telinstallationII. Throttling device_ at the inlet andoutlet of pipesIII. Throttling devices at r_tios of y,ros_uresabove the critics,IV. Thrott
7、lln_ devices with constant dizc:sr_ecoefficients at low t_lues of theReynolds numberV. Gener_,l inform;Ltion on the ccnuectiu_ linesand the differentia,1 pre_flure 3:_5 the profile of thai noz_:l_ i_ to beturned out, as shov, n in =_izure 2, Data Sh_t. 0.7, _, 150 r.n. the cc!_-_ei,_ distinctlyb_:ok
8、en, For such _on-sharp edges, the :lisch_.rge coeffi-cient must be increased (Data Sheet 5, figs. 24b), and i_-creases in the tolerance (Data Sheet 5, fi_;. 24f) _:.ust bemade if there is any doubt of the o_rfecti_n _f the cd_esharpness.The upstream face should be smooth. _t le:_st n_ar th_upstream
9、edge of the orifice.18. The orifice diameter is to be :c_:_urn(l_ihh _.,tol-erance of 0.001 d.The elate thickness sheud be equ:_l _o or Ic_ thanO.ID and the length of the cylindrical _str_am D_rt sho_.idbe equ:_tl to or le_,_ than O.02D. Thr aboutmm - if the condensate loots on the side ere u_,d. A_
10、._result of this requirement and that in fi_ure I, Data Shc_,t,.J1 - that the width of the pre_,sure top _-.O._ZD - only annu-lar chambers are applicable for sta_dardize_ ;te_m m(_,_,_.r_-merit in _ipes of small dlar:eter.With a anular chambers, the pressure tee slit ,_hould beas narrow as possible
11、in order to egu:,lize the, prc_,suresatisfactorily. (Tote, however, the effect of s_rf_,cetension if the slot is too nc,rro_v. )_.i. In making the throttlln_I devices, they :_a:.;besplit up into parts, as shown in figure_s _,to IS of Dat:tSheet i, in order to facilitate manufacture, inteichan_,-abil
12、ity, etc. The materials of the throttling devices :_n,_tbe so chosen that they :viii not wear r,o_dl_._-“ P_rtic,_!ar-I_T with orifices, care _houid be t_en when zhioiu_ an,%installin_ th_t the sharp upstream edge is _ot d:%maged.Lil_ewi:_e, with nozzles the discharqe _d_e :_hould not be,dama_o,d. (
13、See, what is said about the orotec_iv,;, rir_, inpara_raph 14. )23. The mountin_ rings which hold the orifi_,m ol:_.,tcor the nozzle must have rounded ,_orners on the u!)_treamside (fi_s. 5 to IS, Date, Sheet .) and their inside di_,_me-ters should not be smaller than the pipe di:_m_tcr. It ispermi_
14、sible, however: to mc_ke the mountinz rin!r_ ?; _,crcc_.tlar_er than the pipe diameter :-ith sta:_dard oriCic 0.3 and within 2 perc_nt for m “beconsidered more nearly smooth as the _ia_:_ter _ncrenses.Quantitative roughness tony only be e_timated. As a _uid 0.5. no data can be _iv_n.30. The nece_z_r
15、y str_ight lengths of _oio_s u_tre.umaud downstream from the throt_lin_ devic_ ?re_ in :_ener_.l,shorter the smaller the ratio of :.teas. Con_cquently, inmany cases where a ,qufficiently !on;:_ str;oiqht length ofpipe is not ave.liable, the choice. _ of :_ _,_ler ratio ofareas will b_ _ help, in_:of
16、_r P_s the re_it_nt increase, indiffereutial prezs_re will allow.31. It is not _,ermissible to inzt_! r_ throttlin_ d_-vice close downstream from an cxp:tudin_ _,_red_., piecn. _ithorlfice_, a _trai _ _n_, section of pipe of cc_asta_:.t :_i_,_metermust be between _uch a oiece and t“.e orifice, of ,_
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASANACATM9521940STANDARDSFORDISCHARGEMEASUREMENTWITHSTANDARDIZEDNOZZLESANDORIFICES 标准化 喷嘴 孔口 流量 测量 标准

链接地址:http://www.mydoc123.com/p-836172.html