ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf
《ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf》由会员分享,可在线阅读,更多相关《ITU-T M 725-1988 RESTORATION CONTROL POINT《恢复控制点》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION)45G134 - TELECOMMUNICATIONSTANDARDIZATION SECTOROF ITU-!).4%.!.#% ).4%2.!4)/.!,G0G04%,%0(/.%G0G0#)2#5)432%34/2!4)/.G0G0#/.42/,G0G00/).4)45G134G0G0RecommendationG0G0- (Extract from the “LUEG0“OOK)NOTES1 ITU-T Recommendation M.725 was published in Fascicle IV.1 of
2、 the Blue Book. This file is an extract fromthe Blue Book. While the presentation and layout of the text might be slightly different from the Blue Book version, thecontents of the file are identical to the Blue Book version and copyright conditions remain unchanged (see below).2 In this Recommendati
3、on, the expression “Administration” is used for conciseness to indicate both atelecommunication administration and a recognized operating agency. ITU 1988, 1993All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, electronic ormechanical, includi
4、ng photocopying and microfilm, without permission in writing from the ITU.Fascicle IV.1 - Rec. M.725 1Recommendation M.725Fascicle IV.1 - Rec. M.725RESTORATION CONTROL POINT1 Definition of restoration control point (RCP)The restoration control point (RCP) is an element within the general maintenance
5、 organization for theinternational telecommunication services. It initiates and coordinates service restoration activities in case of failures orplanned outages of transmission systems in accordance with plans and ad hoc arrangements agreed by the technicalservices of the Administrations concerned.S
6、ince two or more RCPs are involved in agreed restoration plans, it is practical to nominate one RCP as theOverall RCP which then initiates and controls implementation of the plan. The additional responsibilities and functionsof an Overall RCP are given in 3 below.2 Responsibilities and functionsThe
7、restoration control point (RCP) is responsible for the following set of functions:2.1 Initiating the implementation of a restoration plan and ad hoc arrangements with the other stations involvedwithin its Administrations boundaries.2.2 Monitoring the implementation of the restoration plan.2.3 Coordi
8、nating the restoration activities of the repeater stations and other stations involved within itsAdministrations boundaries.2.4 Liaising with restoration control points of other Administrations as necessary and agreeing the times of eventswith them.2.5 Exchanging information with the network managem
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM7251988RESTORATIONCONTROLPOINT 恢复 控制 PDF

链接地址:http://www.mydoc123.com/p-799949.html