ISA TR77 60 04-2013 Fossil Fuel Power Plant Human-Machine Interface - Electronic Screen Displays.pdf
《ISA TR77 60 04-2013 Fossil Fuel Power Plant Human-Machine Interface - Electronic Screen Displays.pdf》由会员分享,可在线阅读,更多相关《ISA TR77 60 04-2013 Fossil Fuel Power Plant Human-Machine Interface - Electronic Screen Displays.pdf(34页珍藏版)》请在麦多课文档分享上搜索。
1、 ISATR77.60.04-2013 Fossil Fuel Power Plant Human-Machine Interface Electronic Screen Displays Approved 26 November 2013 Copyright 2013 ISA. All rights reserved. ISATR77.60.04-2013 Fossil Fuel Power Plant Human-Machine Interface Electronic Screen Displays ISBN: 978-0-876640-53-1 Copyright 2013 by IS
2、A. All rights reserved. Not for resale. Printed in the United States of America. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior written permissi
3、on of the Publisher. ISA 67 Alexander Drive P.O. Box 12277 Research Triangle Park, NC 27709 www.isa.org 26 November 2013 3 ISA-TR77.60.04-2013 Preface This preface, as well as all footnotes and annexes, is included for informational purposes only and is not part of ISA-TR77.60.04-2013. The purpose o
4、f this Technical Report is to provide advice and guidance in the development of Electronic Screen Displays for use in conjunction with real-time distributed control systems used in utility fossil-fired power plants with boilers of 200,000 lb/hr or greater capacity. This document has been prepared as
5、 part of the service of the International Society of Automation (ISA) toward a goal of uniformity in the field of instrumentation. To be of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and a
6、sks that they be addressed to the Secretary, Standards and Practices Board; ISA; 67 Alexander Drive; P. O. Box 12277; Research Triangle Park, NC 27709; Telephone (919) 549-8411; Fax (919) 549-8288; Email: standardsisa.org. The ISA Standards and Practices Department is aware of the growing need for a
7、ttention to the metric system of units in general, and the International System of Units (SI) in particular, in the preparation of instrumentation standards. The Department is further aware of the benefits to USA users of ISA standards of incorporating suitable references to the SI (and the metric s
8、ystem) in their business and professional dealings with other countries. Toward this end, this Department will endeavour to introduce SI-acceptable metric units in all new and revised standards, recommended practices, and technical reports to the greatest extent possible. IEEE/ASTM SI 10, American N
9、ational Standard for Metric Practice, and future revisions, will be the reference guide for definitions, symbols, abbreviations, and conversion factors. It is the policy of ISA to encourage and welcome the participation of all concerned individuals and interests in the development of ISA standards,
10、recommended practices, and technical reports. Participation in the ISA standards-making process by an individual in no way constitutes endorsement by the employer of that individual, of ISA, or of any of the standards, recommended practices, and technical reports that ISA develops. CAUTION ISA DOES
11、NOT TAKE ANY POSITION WITH RESPECT TO THE EXISTENCE OR VALIDITY OF ANY PATENT RIGHTS ASSERTED IN CONNECTION WITH THIS DOCUMENT, AND ISA DISCLAIMS LIABILITY FOR THE INFRINGEMENT OF ANY PATENT RESULTING FROM THE USE OF THIS DOCUMENT. USERS ARE ADVISED THAT DETERMINATION OF THE VALIDITY OF ANY PATENT R
12、IGHTS, AND THE RISK OF INFRINGEMENT OF SUCH RIGHTS, IS ENTIRELY THEIR OWN RESPONSIBILITY. PURSUANT TO ISAS PATENT POLICY, ONE OR MORE PATENT HOLDERS OR PATENT APPLICANTS MAY HAVE DISCLOSED PATENTS THAT COULD BE INFRINGED BY USE OF THIS DOCUMENT AND EXECUTED A LETTER OF ASSURANCE COMMITTING TO THE GR
13、ANTING OF A LICENSE ON A WORLDWIDE, NON-DISCRIMINATORY BASIS, WITH A FAIR AND REASONABLE ROYALTY RATE AND FAIR AND REASONABLE TERMS AND CONDITIONS. FOR MORE INFORMATION ON SUCH DISCLOSURES AND LETTERS OF ASSURANCE, CONTACT ISA OR VISIT WWW.ISA.ORG/STANDARDSPATENTS. OTHER PATENTS OR PATENT CLAIMS MAY
14、 EXIST FOR WHICH A DISCLOSURE OR LETTER OF ASSURANCE HAS NOT BEEN RECEIVED. ISA IS NOT RESPONSIBLE FOR IDENTIFYING PATENTS OR PATENT APPLICATIONS FOR WHICH A LICENSE MAY BE REQUIRED, FOR CONDUCTING INQUIRIES INTO THE LEGAL VALIDITY OR SCOPE OF PATENTS, OR DETERMINING WHETHER ANY LICENSING TERMS OR C
15、ONDITIONS PROVIDED IN CONNECTION WITH SUBMISSION OF A LETTER OF ASSURANCE, IF ANY, OR IN ANY LICENSING AGREEMENTS ARE REASONABLE OR NON-DISCRIMINATORY. ISA REQUESTS THAT ANYONE REVIEWING THIS DOCUMENT WHO IS AWARE OF ANY PATENTS THAT MAY IMPACT IMPLEMENTATION OF THE DOCUMENT NOTIFY THE ISA STANDARDS
16、 AND PRACTICES DEPARTMENT OF THE PATENT AND ITS OWNER. ISA-TR77.60.04-2013 4 26 November 2013 Copyright 2013 ISA. All rights reserved. ADDITIONALLY, THE USE OF THIS DOCUMENT MAY INVOLVE HAZARDOUS MATERIALS, OPERATIONS OR EQUIPMENT. THE DOCUMENT CANNOT ANTICIPATE ALL POSSIBLE APPLICATIONS OR ADDRESS
17、ALL POSSIBLE SAFETY ISSUES ASSOCIATED WITH USE IN HAZARDOUS CONDITIONS. THE USER OF THIS DOCUMENT MUST EXERCISE SOUND PROFESSIONAL JUDGMENT CONCERNING ITS USE AND APPLICABILITY UNDER THE USERS PARTICULAR CIRCUMSTANCES. THE USER MUST ALSO CONSIDER THE APPLICABILITY OF ANY GOVERNMENTAL REGULATORY LIMI
18、TATIONS AND ESTABLISHED SAFETY AND HEALTH PRACTICES BEFORE IMPLEMENTING THIS DOCUMENT. THE USER OF THIS DOCUMENT SHOULD BE AWARE THAT THIS DOCUMENT MAY BE IMPACTED BY ELECTRONIC SECURITY ISSUES. THE COMMITTEE HAS NOT YET ADDRESSED THE POTENTIAL ISSUES IN THIS VERSION. The following people served as
19、voting members of ISA77.60 and approved this technical report. NAME COMPANY R. Hubby, Chair Robert N. Hubby Consulting J. Weiss, Managing Director Applied Control Solutions LLC S. Alvarez Compania Inspeccion Mexicana D. Bernfeld Niagara Mohawk Power Corp. D. Crow Invensys Foxboro D. Lee ABB Inc. S.
20、Mattix Duke Power Co. L. Schroeder Axiom Tech Corp. T. Toms Progress Energy The following people served as voting members of ISA77 and approved this technical report. NAME COMPANY R. Hubby, Chair Robert N. Hubby Consulting D. Lee, Chair ABB Inc. J. Weiss, Managing Director Applied Control Solutions
21、LLC L. Altcheh Israel Electric Corp. J. Batug PPL Generation LLC G. Cohee Applied Control Systems D. Crow Invensys Foxboro M. Cushing Siemens Industry Inc. R. Eng Hitachi Power Systems America A. Erickson Bibb b) accomplish display design based on the users needs that are based on an assessment of p
22、lanned control-operator functions to be performed; and c) provide a display design to obtain timely access to required information and controls in a logical structure convenient to the user. Input from plant operating personnel in all phases of Electronic Screen Display development is critical to th
23、e development of effective displays. It is even recommended to have plant operating personnel help build many of the graphics to ensure a sense of ownership by operations personnel. It is noted that the Human Machine Interface (HMI) to which this report is addressed is one of the three elements of a
24、 properly designed control system. The other two elements are properly designed and configured control logic as described in other ISA77 standards, and effective alarm management system as addressed in Clause 12 of this report, ISA-RP77.60.02-2010, Fossil Fuel Power Plant Human Machine Interface: Ha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISATR7760042013FOSSILFUELPOWERPLANTHUMANMACHINEINTERFACEELECTRONICSCREENDISPLAYSPDF

链接地址:http://www.mydoc123.com/p-789982.html