1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW15261 Exhaust System Component and Joint Leakage Copyright 2012 General Motors Company All Rights Reserved November 2012 Originating Department: North American Engineering Standards Page 1 of 8 1 Scope Note: Nothing in this standard supercedes appli
2、cable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. The purpose of this procedure is to determine the static leakage, pull-apart load and the torque specification on each attachment of the exha
3、ust system - joint interface. 1.2 Foreword. This document contains four procedures: torque angle to ultimate, hand torque to seal and leakage, static leakage check, and pull-apart load. These tests can be conducted individually. 1.3 Applicability. These tests apply to exhaust systems. Note: Pull-apa
4、rt load test does not apply to flange joints. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. None 2.3 Additional References. TMC003 Material Safety Data Sheet guidance docum
5、ents (available at ). 3 Resources 3.1 Facilities. 3.1.1 Approved Fastener Laboratory for this test procedure. 3.1.2 Testing may also be completed at the following, but not limited to: 3.1.2.1 Supplier or supplier laboratory. 3.1.2.2 GM vehicle or engine plants. 3.1.2.3 GM transmission plants. 3.1.2.
6、4 GM component part plants. 3.1.2.5 Satellite General Motors facilities. 3.2 Equipment. 3.2.1 Standard laboratory slot table. 3.2.2 Microprocessor based data acquisition system. 3.2.3 Torque transducer. 3.2.4 Angle encoder/decoder. 3.2.5 Pressure transducer. 3.2.6 Flow meter. 3.2.7 Tensile tester. 3
7、.2.8 Digital function generator. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15261 Copyright 2012 General Motors Company All Rights R
8、eserved November 2012 Page 2 of 8 3.2.9 Control unit. 3.2.10 Controller. 3.2.11 Linear Variable Displacement Transducer (LVDT). 3.2.12 Force transducer. 3.2.13 Amplifier. 3.2.14 Air regulator with filter. 3.2.15 Break wire. 3.2.16 Power tools adequate to torque the fasteners. 3.2.17 Sockets, assorte
9、d angle supports, adapters. 3.2.18 Special rubber plugs to seal the pipe ends. 3.2.19 Furnace or oven capable of 649 C (1200 F). Note: All instrumentation is to be calibrated as required. Record document instrumentation details and date of calibration, unless the information is otherwise preserved i
10、n the laboratory records. 3.3 Test Vehicle/Test Piece. 3.3.1 Complete exhaust system or specific components being investigated. This could include any or all of the following items: 3.3.1.1 Front and intermediate exhaust pipes. 3.3.1.2 Catalytic converter with required hangers. 3.3.1.3 Muffler and t
11、ailpipe assembly with required hangers. 3.3.1.4 Exhaust manifolds. 3.3.1.5 All required fasteners and clamps. 3.3.2 Recommended sample size is eight for Test 1, eight for Test 2, and eight for Test 3. Completed samples from Test 3 are used to run Test 4. 3.4 Test Time. Calendar time: 2 to 10 days Te
12、st hours: 16 hours for 8 samples Coordination hours: 8 hours for 8 samples 3.5 Test Required Information. Not applicable. 3.6 Personnel/Skills. Not applicable. 4 Procedure 4.1 Preparation. 4.1.1 Cut the exhaust system components into appropriate lengths. Enough material should be retained adjacent t
13、o the joint to insure that the pipe has not been weakened. 4.1.2 The following preparation is only required for those samples that will be used for the joint leakage test. 4.1.2.1 Plug or weld the pipe ends as necessary to prevent leakage from unmonitored interfaces. 4.1.2.2 Drill and tap welded pip
14、e end for pressure adapter. 4.1.2.3 Coat welded areas with epoxy to prevent minute air leakage through welds. 4.2 Conditions. 4.2.1 Environmental Conditions. All measurements are taken at lab ambient temperatures. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have be
15、en agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGIN
16、EERING STANDARDS GMW15261 Copyright 2012 General Motors Company All Rights Reserved November 2012 Page 3 of 8 4.3 Instructions. 4.3.1 Test No. 1, Torque Angle to Ultimate (Optional). This portion of the procedure may be conducted when fastener torque specifications do not exist for the joints being
17、tested. 4.3.1.1 Review part quantities and condition. 4.3.1.2 Secure test part to T-slot table or fixture. 4.3.1.3 Select proper tool(s) and torque transducer(s) with angle encoder. 4.3.1.4 Configure data acquisition system to collect torque and angle data (reference Manufacturers Operating Procedur
18、e). 4.3.1.5 Align tool(s) and torque transducer(s) to prevent side loading. 4.3.1.6 Unless otherwise specified, test requestor is to approve test setup. 4.3.1.7 Take photograph or digital image of test configuration. 4.3.1.8 Measure and document tool free spinning speed. 4.3.1.9 Dynamically tighten
19、the nut of the clamp or nuts/bolts of a flanged joint until torque fall-off occurs. Use the same tool speed and the number of spindles as used in production. 4.3.1.10 Measure and record torque and angle. 4.3.1.11 Document the failure mode of the joint. 4.3.1.12 Submit plots of torque/angle data to t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW152612012EXHAUSTSYSTEMCOMPONENTANDJOINTLEAKAGEISSUE2ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757632.html