EN 50600-4-1-2016 en Information technology - Data centre facilities and infrastructures - Part 4-1 Overview of and general requirements for key performance indicators.pdf
《EN 50600-4-1-2016 en Information technology - Data centre facilities and infrastructures - Part 4-1 Overview of and general requirements for key performance indicators.pdf》由会员分享,可在线阅读,更多相关《EN 50600-4-1-2016 en Information technology - Data centre facilities and infrastructures - Part 4-1 Overview of and general requirements for key performance indicators.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、BS EN 50600-4-1:2016Information technology Data centre facilities andinfrastructuresPart 4-1: Overview of and generalrequirements for key performanceindicatorsBSI Standards PublicationWB11885_BSI_StandardCovs_2013_AW.indd 1 15/05/2013 15:06BS EN 50600-4-1:2016 BRITISH STANDARDNational forewordThis B
2、ritish Standard is the UK implementation of EN 50600-4-1:2016. The UK participation in its preparation was entrusted to Technical Committee TCT/7, Telecommunications - Installation requirements.A list of organizations represented on this committee can be obtained on request to its secretary.This pub
3、lication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2017.Published by BSI Standards Limited 2017ISBN 978 0 580 93731 6 ICS 35.020; 35.110; 35.160 Compliance with a British Standard canno
4、t confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 January 2017.Amendments/corrigenda issued since publicationDate T e x t a f f e c t e dBS EN 50600-4-1:2016EUROPEAN STANDARD NORME EUROPENNE EUROPISCH
5、E NORM EN 50600-4-1 December 2016 ICS 35.020; 35.110; 35.160 English Version Information technology - Data centre facilities and infrastructures - Part 4-1: Overview of and general requirements for key performance indicators Technologie de linformation - Installation et infrastructures de centres de
6、 traitement de donnes - Partie 4-1 : Vue densemble et exigences gnrales relatives aux indicateurs-cls de performance Informationstechnik - Einrichtungen und Infrastrukturen von Rechenzentren - Teil 4-1: berblick ber und allgemeine Anforderungen an Leistungskennzahlen This European Standard was appro
7、ved by CENELEC on 2016-10-10. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such natio
8、nal standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its ow
9、n language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia
10、, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. European Committee for Electrotechnical Standardization Comit Europen
11、de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2016 CENELEC All rights of exploitation in any form and by any means reserved worldwide for CENELEC Members. Ref. No. EN 50600-4-1:2016 E BS EN 50600-4-
12、1:2016EN 50600-4-1:2016 2 Contents PageEuropean foreword . 4 Introduction . 5 1 Scope . 8 2 Normative references 8 3 Terms, definitions and abbreviations 8 3.1 Terms and definitions 8 3.2 Abbreviations . 9 4 Conformance 9 5 Key Performance Indicators (KPIs) 9 5.1 General 9 5.2 Common Objectives for
13、KPIs 10 5.3 Requirements for KPIs 10 5.3.1 General . 10 5.3.2 Scale . 10 5.3.3 Evolution 10 5.3.4 Formulae 10 5.3.5 Definition of boundaries . 10 5.3.6 Reporting . 11 5.3.7 Definition of terms 11 5.3.8 Measurement points and procedures . 11 5.3.9 Requirements 11 5.3.10 Classifications . 11 5.4 Eleme
14、nts addressed in the standards within the EN 50600-4-X series 11 5.5 Use of KPIs . 12 6 Data Centre Boundaries 12 6.1 General 12 6.2 Spatial and logical boundaries . 12 7 Data Centre spaces and equipment . 12 7.1 Data Centre spaces 12 7.2 Data centre equipment (logical boundaries) . 13 7.2.1 IT and
15、network telecommunications/infrastructure 13 7.2.2 Power distribution infrastructure 13 7.2.3 Environmental control/infrastructure . 13 7.2.4 Security and safety infrastructure . 13 Annex A (informative) KPI constraints and data centre criticality . 14 BS EN 50600-4-1:2016EN 50600-4-1:2016 3 A.1 Gen
16、eral 14 A.2 Data centre availability objectives 14 A.3 Data centre location . 14 Bibliography 15 Figures Figure 1 Schematic relationship between the EN 50600 series of documents . 6 BS EN 50600-4-1:2016EN 50600-4-1:2016 4 European foreword This document (EN 50600-4-1:2016) has been prepared by CLC/T
17、C 215 “Electrotechnical aspects of telecommunication equipment”. The following dates are fixed: Latest date by which this documenthas to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2017-07-10 Latest date by which the nationalstandards con
18、flicting with this document have to be withdrawn (dow) 2019-10-10 This document has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association. Attention is drawn to the possibility that some of the elements of this document may be the subject o
19、f patent rights. CENELEC shall not be held responsible for identifying any or all such patent rights. Regarding the various parts in the EN 50600 series, see the Introduction. BS EN 50600-4-1:2016EN 50600-4-1:2016 5 Introduction The unrestricted access to internet-based information demanded by the i
20、nformation society has led to an exponential growth of both internet traffic and the volume of stored/retrieved data. Data centres are housing and supporting the information technology and network telecommunications equipment for data processing, data storage and data transport. They are required bo
21、th by network operators (delivering those services to customer premises) and by enterprises within those customer premises. Data centres need to provide modular, scalable and flexible facilities and infrastructures to easily accommodate the rapidly changing requirements of the market. In addition, e
22、nergy consumption of data centres has become critical both from an environmental point of view (reduction of carbon footprint) and with respect to economic considerations (cost of energy) for the data centre operator. The implementation of data centres varies in terms of: a) purpose (enterprise, co-
23、location, co-hosting, or network operator facilities);b) security level;c) physical size;d) accommodation (mobile, temporary and permanent constructions).The needs of data centres also vary in terms of availability of service, the provision of security and the objectives for energy efficiency. These
24、 needs and objectives influence the design of data centres in terms of building construction, power distribution, environmental control and physical security. Effective management and operational information is required to monitor achievement of the defined needs and objectives. This series of Europ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN50600412016ENINFORMATIONTECHNOLOGYDATACENTREFACILITIESANDINFRASTRUCTURESPART41OVERVIEWOFANDGENERALREQUIREMENTSFORKEYPERFORMANCEINDICATORSPDF

链接地址:http://www.mydoc123.com/p-717317.html