EEMUA PUB NO 231-2012 The mechanical integrity of plant containing hazardous substances - A guide to periodic examination and testing (Edition 1).pdf
《EEMUA PUB NO 231-2012 The mechanical integrity of plant containing hazardous substances - A guide to periodic examination and testing (Edition 1).pdf》由会员分享,可在线阅读,更多相关《EEMUA PUB NO 231-2012 The mechanical integrity of plant containing hazardous substances - A guide to periodic examination and testing (Edition 1).pdf(56页珍藏版)》请在麦多课文档分享上搜索。
1、The mechanical integrity of plant containing hazardous substancesA guide to periodic examination and testingEEMUA Publication 231 - Ed 1SAFed Publication IMG 1The mechanical integrity of plant containing hazardous substancesA guide to periodic examination and testingEdition 1 - September 2012Forewor
2、dThis document has been developed and written by the Safety Assessment Federation (SAFed)and the Engineering Equipment competent person means a competent individual person (other than an employee) or acompetent body of persons corporate or unincoporate; and accordingly any reference in theseRegulati
3、ons to a competent person performing a function includes a reference to his performing it through his employees;The Approved Code of Practice (ACoP) to the regulations gives comment on the role as follows;The term competent person is used in connection with two distinct functions:a) drawing up or ce
4、rtifying schemes of examination (regulation 8); andb) carrying out examinations under the scheme (regulation 9).And;In general terms, the competent person should have:a) staff with practical and theoretical knowledge and actual experience of the relevant systems;b) access to specialist services;c) e
5、ffective support and professional expertise within their organisation; and d) proper standards of professional probity.However, the term competent person, has also been used in other publications in acontext much wider than PSSR.1.2.2 Inspection/ExaminationWithin this guidance these are considered i
6、nterchangeable terms to describe variousactivities aimed at assessing the integrity of plant and equipment.Inspection and examination are considered as focussed activities that lead to a report onthe condition of a piece of equipment and its suitability, or not, for further service. Theymay consist
7、of a single part of an activity, e.g. a visual examination, or be the sum ofseveral parts, e.g. a visual examination and a range of non destructive examinationtechniques (ultrasonic thickness measurements, crack detection etc).The reader should be aware that other documents may use these terms in ot
8、hercontexts, or as interchangeable terms.1.2.3 TestA component of an examination and a discrete activity aimed at providing information foran examination report. However, in itself it would not usually provide information into allaspects of the current condition or assessment of ongoing equipment in
9、tegrity. Examplesinclude a hydraulic test, a holiday test (standard practice for checking discontinuities) or athickness test. 1.2.4 IndependenceIndependence is the management structure that ensures that the individuals and teamsmaking key decisions relating to integrity management are isolated from
10、 other factors thatmight result in a conflict of interest (e.g. a desire to maximise production may createpressure to operate equipment beyond the time for which its integrity may be assured).8 of 55The mechanical integrity of plant containing hazardous substancesA guide to periodic examination and
11、testingEdition 1 - September 20121.2.5 Integrity assessorThe integrity assessor is the person, team or corporate body, who (like the competentperson) takes responsibility for all elements of an examination (including those carried outby another person or body), the interpretation and the formulation
12、 of the conclusions ofthe examination.This term has been introduced to cater for those who do not wish to use the termcompetent person in situations where PSSR does not apply. Equally it can apply wherethe site operator does not wish the PSSR competent person to carry out the extra worknecessary to
13、meet the requirements of other regulations such as COMAH or PUWER.9 of 55The mechanical integrity of plant containing hazardous substancesA guide to periodic examination and testingEdition 1 - September 20122.0 OVERVIEW OF INTEGRITYMANAGEMENT THROUGHOUT THE PLANT LIFECYCLESuccessful management of pl
14、ant integrity requires a clear strategy; not just for periodicexamination, but for the whole plant lifecycle. This is especially important on sitesstoring and processing hazardous substances, where the consequences of integrity failurecan be major.Whilst this guidance is focussed towards examination
15、, it is very useful to put this intocontext, as this is only one element of an integrity management strategy. If the plant wasnot specified, designed or constructed correctly, ongoing integrity management mayrequire a unique approach and be problematic. Also key to maintaining integrity is theassess
16、ment of the results of examinations, especially where the report states that theequipment has defects.Diagram 1 on page 10 shows a Overview of integrity management throughout the plantlifecycle. This flowchart provides an overview of the different elements of the strategy, and how they link together
17、 and inform one another. All elements of the flowchart arediscussed briefly in this chapter, but some are beyond the main scope of this guidance document.2.1 SPECIFICATIONGetting the original plant specification correct is key, so that plant is designed to besuitable for the intended duty. Some of t
18、he issues that need to be addressed include:How big does the vessel / storage tank need to be?What will it contain in normal use?What will it contain during other operating circumstances, such as during start-up,shut-down and cleaning?What are the hazards of this substance?How might the contents aff
19、ect the vessel / tank / pipe-work?What temperature a high hazard situation will require a morerigorous examination regime than a low hazard one.The following examples illustrate this point:What is considered to be a reasonably practicable examination regime for a simple airreceiver in a remote part
20、of a site would be much less than that expected for a reactorvessel, containing hazardous substances, sited in a populated area and which is subjectto complex process conditions, giving rise to multiple degradation mechanisms.Where the likelihood of a degradation mechanism affecting a vessel is very
21、 remote,but the consequences of a release from that vessel are high, it may still be consideredreasonably practicable for the examination regime to take it into account and employinspection techniques to detect it, should it occur.This guidance is aimed at equipment providing the primary containment
22、 boundary forhazardous substances, where consequences of release are likely to be significant, and it isconsidered reasonably practicable to go beyond the requirements of a PSSR examinationregime. The focus of this document is where hazards are high, and the examination has tobe sufficiently robust
23、to manage the risk of loss of containment.17 of 55The mechanical integrity of plant containing hazardous substancesA guide to periodic examination and testingEdition 1 - September 20123.3 OTHER ACTIVITIES AND REGULATIONSThe Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), includere
24、quirements for thorough examination by a competent person. While thoroughexamination of lifting equipment is not covered in this guidance, it is worth noting thatsome principles contained here may be applicable to such a regime. For example, wherefailure of lifting equipment could lead to a major ac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EEMUAPUBNO2312012THEMECHANICALINTEGRITYOFPLANTCONTAININGHAZARDOUSSUBSTANCESAGUIDETOPERIODICEXAMINATIONANDTESTINGEDITION1PDF

链接地址:http://www.mydoc123.com/p-704997.html