1、257 Federal Highway Administration, DOT Pt. 650 A vertical clearance of 7.1 meters above the top of rails, which includes an allowance for future ballasting of the railroad tracks, may be approved. Vertical clearance greater than 7.1 meters may be approved when the State regulatory agency having jur
2、isdiction over such matters requires a vertical clear-ance in excess of 7.1 meters or on a site by site basis where justified by the railroad to the satisfaction of the SHA and the FHWA. A railroads justification for increased vertical clearance should be based on an analysis of engineering, operati
3、onal and/or economic conditions at a specific structure location. Federal-aid highway funds are also eligible to participate in the cost of providing vertical clearance greater than 7.1 meters where a railroad establishes to the satisfac-tion of a SHA and the FHWA that it has a definite formal plan
4、for electrification of its rail system where the proposed grade separa-tion project is located. The plan must cover a logical independent segment of the rail system and be approved by the railroads corporate headquarters. For 25 kv line, a vertical clearance of 7.4 meters may be ap-proved. For 50 kv
5、 line, a vertical clearance of 8.0 meters may be approved. A railroads justification to support its plan for electrification shall include maps and plans or drawings showing those lines to be electrified; actions taken by its corporate headquarters committing it to electrifica-tion including a propo
6、sed schedule; and ac-tions initiated or completed to date imple-menting its electrification plan such as a showing of the amounts of funds and identi-fication of structures, if any, where the rail-road has expended its own funds to provide added clearance for the proposed electrifica-tion. If availa
7、ble, the railroads justification should include information on its con-templated treatment of existing grade sepa-rations along the section of its rail system proposed for electrification. The cost of reconstructing or modifying any existing railroad-highway grade separa-tion structures solely to ac
8、commodate elec-trification will not be eligible for Federal-aid highway fund participation. c. Railroad Structure Width Two and eight tenths meters of structure width outside of the centerline of the outside tracks may be approved for a structure car-rying railroad tracks. Greater structure width ma
9、y be approved when in accordance with standards established and used by the affected railroad in its normal practice. In order to maintain continuity of off- track equipment roadways at structures car-rying tracks over limited access highways, consideration should be given at the prelimi-nary design
10、 stage to the feasibility of using public road crossings for this purpose. Where not feasible, an additional structure width of 2.5 meters may be approved if designed for off-track equipment only. 53 FR 32218, Aug. 24, 1988, as amended at 62 FR 45328, Aug. 27, 1997 PART 650BRIDGES, STRUCTURES, AND H
11、YDRAULICS Subpart ALocation and Hydraulic Design of Encroachments on Flood Plains Sec. 650.101 Purpose. 650.103 Policy. 650.105 Definitions. 650.107 Applicability. 650.109 Public involvement. 650.111 Location hydraulic studies. 650.113 Only practicable alternative finding. 650.115 Design standards.
12、650.117 Content of design studies. Subpart BErosion and Sediment Control on Highway Construction Projects 650.201 Purpose. 650.203 Policy. 650.205 Definitions. 650.207 Plans, specifications, and estimates. 650.209 Construction. 650.211 Guidelines. Subpart CNational Bridge Inspection Standards 650.30
13、1 Purpose. 650.303 Applicability. 650.305 Definitions. 650.307 Bridge inspection organization. 650.309 Qualifications of personnel. 650.311 Inspection frequency. 650.313 Inspection procedures. 650.315 Inventory. 650.317 Reference manuals. Subpart DHighway Bridge Replacement and Rehabilitation Progra
14、m 650.401 Purpose. 650.403 Definition of terms. 650.405 Eligible projects. 650.407 Application for bridge replacement or rehabilitation. 650.409 Evaluation of bridge inventory. 650.411 Procedures for bridge replacement and rehabilitation projects. 650.413 Funding. 650.415 Reports. Subparts EF Reserv
15、ed Subpart GDiscretionary Bridge Candidate Rating Factor 650.701 Purpose. 650.703 Eligible projects. VerDate Mar2010 09:39 May 11, 2011 Jkt 223076 PO 00000 Frm 00267 Fmt 8010 Sfmt 8010 Y:SGML223076.XXX 223076wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking
16、 permitted without license from IHS-,-,-258 23 CFR Ch. I (4111 Edition) 650.101 650.705 Application for discretionary bridge funds. 650.707 Rating factor. 650.709 Special considerations. Subpart HNavigational Clearances for Bridges 650.801 Purpose. 650.803 Policy. 650.805 Bridges not requiring a USC
17、G per-mit. 650.807 Bridges requiring a USCG permit. 650.809 Movable span bridges. AUTHORITY: 23 U.S.C. 109(a) and (h), 144, 151, 315, and 319; 33 U.S.C. 401, 491 et seq.; 511 et seq.; sec. 4(b) of Pub. L. 97134, 95 Stat. 1699 (1981); sec. 161 of Pub. L. 97424, 96 Stat. 2097, at 3135 (1983); sec. 131
18、1 of Pub. L. 105178, as added by Pub. L. 105206, 112 Stat. 842 (1998); 23 CFR 1.32; 49 CFR 1.48(b); E.O. 11988 (3 CFR, 1977 Comp., p. 117); Department of Transpor-tation Order 5650.2, dated April 23, 1979 (44 FR 24678). Subpart ALocation and Hydrau-lic Design of Encroachments on Flood Plains SOURCE:
19、 44 FR 67580, Nov. 26, 1979, unless otherwise noted. 650.101 Purpose. To prescribe Federal Highway Ad-ministration (FHWA) policies and pro-cedures for the location and hydraulic design of highway encroachments on flood plains, including direct Federal highway projects administered by the FHWA. 650.1
20、03 Policy. It is the policy of the FHWA: (a) To encourage a broad and unified effort to prevent uneconomic, haz-ardous or incompatible use and devel-opment of the Nations flood plains, (b) To avoid longitudinal encroach-ments, where practicable, (c) To avoid significant encroach-ments, where practic
21、able, (d) To minimize impacts of highway agency actions which adversely affect base flood plains, (e) To restore and preserve the nat-ural and beneficial flood-plain values that are adversely impacted by high-way agency actions, (f) To avoid support of incompatible flood-plain development, (g) To be
22、 consistent with the intent of the Standards and Criteria of the National Flood Insurance Program, where appropriate, and (h) To incorporate A Unified Na-tional Program for Floodplain Manage-ment of the Water Resources Council into FHWA procedures. 650.105 Definitions. (a) Action shall mean any high
23、way construction, reconstruction, rehabili-tation, repair, or improvement under-taken with Federal or Federal-aid highway funds or FHWA approval. (b) Base flood shall mean the flood or tide having a 1-percent chance of being exceeded in any given year. (c) Base flood plain shall mean the area subjec
24、t to flooding by the base flood. (d) Design Flood shall mean the peak discharge, volume if appropriate, stage or wave crest elevation of the flood as-sociated with the probability of exceed-ance selected for the design of a high-way encroachment. By definition, the highway will not be inundated from
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT23CFRPART6502011BRIDGESSTRUCTURESANDHYDRAULICSPDF

链接地址:http://www.mydoc123.com/p-701914.html